Amp-Hour
Amp-Hour / Manual

The Amp-Hour manual

Every screen, what it does and what a person does on it, and how the parts of the system connect. The same text is on the feature pages; this page keeps it in one place and the PDF is for printing or keeping on the shop computer.

How the parts fit together

Amp-Hour is one database for the shop. Each screen is a view of the same records, so a number entered once (a tank volume, a part price, a thickness reading) is used everywhere it matters. This chapter follows the records through a job and names the screen where each step happens.

The records

Customer
Who owns the parts and pays the invoice. Carries terms, contacts, packaging rules and portal access. Everything below hangs off a customer.
Part
A customer part number with its process, specification, thickness range, price, packing instructions and its own traveler. A part number belongs to one customer, in as many revisions as it needs; another customer cannot be given it. Receiving a job for a known part fills the job in. A sample is a part marked Sample, quoted and run before Convert to part makes it a production part.
Process and traveler
A process is a finish you sell, with its price, specification, certificate wording and the ordered steps that make it: tank, time, temperature, current density, work instructions. A step in a tank can leave its time, temperature, voltage and current blank and run the tank's own. A part's own traveler lists the steps its jobs get: polishing steps, tank groups, single tanks and other processes, with this part's own dwell times where they differ; a part with no traveler gets its process's steps. The steps are copied onto every job when it is received and printed on its traveler, so later changes reach new jobs only (a tank's new amps per square foot can also be put on steps that have not started). A tank's pH is the exception: a step shows its tank's pH limits as they are now until the step is done, then the limits it was done under. Old process lines (processes and tanks strung together before tank groups) keep running for the parts that use them until their travelers are rebuilt.
Spec
A specification in the spec library (a customer's own, AMS, ASTM, MIL and so on) with its revisions and their effective dates, linked to the parts, processes and customers that use it, with the type or class and the customer's own requirements. Each job keeps a copy of its specs at the revision in effect when it is received, and the traveler and the cert print that copy. A new revision tells the people concerned and lists the open jobs still on the older one. A process whose spec is typed as text keeps working, shown as not in the library.
Tank
A bath with a volume, an operating window (temperature, and an Operating pH that is the same limit the lab tests pH against), a default dwell time, its amps per square foot (in stages when it strikes first: decorative chrome at 180 A/ft² for 30 seconds, then 140), chemistry limits and its makeup chemicals, picked from Chemical inventory, scaled to the working volume and issued on Make up new bath, which checks the stock first and never takes a chemical out in a unit it cannot convert. Each chemistry parameter has a test method (a titration or a meter reading with its formula and its rule for what to add) and its own testing schedule. Routing steps point at tanks, so the traveler names the tank and the floor scan logs amp-hours against it. Bath treatments (carbon treatment, dummy plating) are checklists assigned to tanks on a schedule.
Tank group
A plating line as the rack runs it: tanks in order, each with a dwell time, under one barcode. On a traveler the group is one scan; on the floor several jobs share one rack through it, and each tank logs its own amp-hours.
Rack
A rack, barrel or fixture with its photos. Linked to the parts it runs, each with its pieces on the rack, racking notes and photos of how the part goes on; the usual rack fills in at receiving, and the job page, the traveler and the shop floor show the job's rack with its notes and photo. A retired rack stays on old jobs and loads but is not offered for new ones.
Area
A part of the plant (receiving, polishing, plating, racking, shipping) where steps are done: a Schedule board column, capacity hours per day, and a shop-floor screen set to that area's work; on a part's traveler an Area section puts the items in it in that area, and the traveler prints by area: the whole traveler, a page per area, or one area. Each area is also a line in the books (a QuickBooks class), so sales, chemistry and costs can be read as a profit and loss per line.
Plant map
A schematic drawing of the shop with the real tanks, areas, tank groups, equipment, racks and polishing stations placed on it, made by an administrator under Setup > Plant map. Map, under Production, colours it with heat maps: live tank temperature and pH against limits, SPC signals, amp-hours since the last addition, work in process and who is clocked in where, or rejects, maintenance due, tank utilisation, Cr(VI) air sampling and dollars by area over a date range, with a day's playback and a full-screen kiosk for a wall TV.
Job
One lot of parts with a routing, a quantity, a customer PO and a due date, and the surface area of a piece (the part's, or the job's own), which gives the ft² and the amps for each plating step on the traveler. The job carries labor, runs, rejects, readings, costing and the documents raised against it.
Bank account
A checking, savings, credit card or petty cash account in the chart of accounts, with its register, the statement files imported from the bank, the checks written on it and its monthly reconciliation.
Shipment, certificate and invoice
Shipping a job, or the finished pieces of one still in process, creates the shipment (packing slip, carton labels), the certificate of compliance (readings, gauge, operations) and the invoice for the pieces shipped, which posts to receivables and the ledger.
Dry run
A dry run checks a file and says what would be created, updated or left alone, row by row, without changing anything. Settings > Data imports the shop's setup from spreadsheets this way: the files in order, each with a template and an example, rows with an existing code updated and nothing deleted.

A job from quote to cash

  1. Sales: the customer and part exist (Customers, with every part on its Parts tab and each customer's parts on their page). A quote prices the work by piece, pound, area or lot, is emailed as a PDF, and a customer with portal access can accept it there with their PO; winning it converts to a job.
  2. Receive job: quantity, customer PO, due date. The part brings its traveler (or its process brings the routing) and its usual rack with the racks used, the job gets a number and a printed traveler, and it keeps its specs at the revision in effect. If the part is held as customer stock, the job draws its quantity from that stock. Incoming inspection records the count against the packing list, the condition, contamination, the base material and the hardness; a discrepancy tells QC and the managers, can put the job on hold, and can go to the customer by Email this with the photos. Steel hard enough to need a hydrogen relief bake is pointed out.
  3. Schedule: the board shows every open lot in the area where its pieces are; capacity shows load against hours per area.
  4. Shop floor: scan the traveler barcode to start an operation on some or all of the pieces waiting, log the run (amps, minutes, pieces), complete it; finished pieces move to the next step at once. Scanning a tank group's label opens a load that racks several jobs through the line together. A load adds up the square footage of every job on it and gives the amps for each stage; its load sheet prints them for the bath operator. Amp-hours accumulate on each tank. A step at an outside vendor raises a PO and a vendor slip, and comes back with a count. A held job cannot start. Starting a step, a polishing run or a load checks the operator's training for that work and the calibration of the instruments on the tank, rectifier or oven: by default it warns and logs it; a shop can block instead, and then a supervisor goes ahead with a reason.
  5. Tanks and the lab: each test falls due on its own schedule (days, hours, shifts, amp-hours, metal turnovers, operating hours or before each use). A titration is entered on the tank's test screen, and its test method works out the result and what to add, from the tank volume, in each chemical's own unit, starting from the strength of the reagent bottle in use. The addition is posted at once, or sent to a person or a role as an add request that they confirm from a phone, which issues it from inventory (a precious-metal line waits for a witness); a re-test then falls due. Results out of spec notify administrators, managers, QC and lab technicians and appear on the dashboard and Lab home, as do bath treatments that are due, tests overdue and tests that broke an SPC rule.
  6. Quality: QC records thickness readings; on a job whose part requires them, a QC step cannot close without them. Rejects carry a reason code and are counted under the process or traveler item they were found at; Rejects & returns lists them beside customer returns, and serious ones become NCRs and CAPAs, worked on one NCRs & CAPAs page. The part's test plans put QA tests on the job (thickness, adhesion, salt spray with inspections at set hours, hardness, the hydrogen embrittlement relief bake with its start-within countdown, F519), due once plating is done; a failed test can open an NCR and hold the job, and passed tests and bakes print on the cert. Gauges and the instruments on tanks, rectifiers and ovens are calibrated under Maintenance > Calibration, as found and as left at each point; one found out of tolerance lists every reading, test, load, job and cert since its last good calibration, with the NCR and the customer notice a click away, and the certificate quotes each gauge's calibration dates. When parts cannot meet a requirement, a deviation or waiver asks the customer first; they approve or decline in the portal or from an emailed link, with no sign-in. The training matrix shows who is qualified on what, and when it expires.
  7. Ship: packing slip, carton labels, certificate of compliance and invoice in one step, for a complete job or for the finished pieces of one still in process (unless the customer takes no partial shipments); each shipment carries its own documents for the pieces on it. A job with an open NCR and no approved deviation covering its pieces warns at shipping (or is blocked, when the shop chooses), and the cert prints any deviation the pieces shipped under. Customers with portal access download their certs and invoices.
  8. Books: the invoice posts to accounts receivable and the general ledger, on the line of the job's plating area. A customer payment clears it: a check waits in Undeposited funds until it goes to the bank on a deposit, an ACH or a wire lands in the bank; credit memos, refunds and write-offs settle the rest, and aging, statements and payment reminders follow. Each month the bank's statement file is imported, its lines matched to those entries, and the reconciliation ties the books to the statement. Sales tax goes to each tax agency's own account, unless the customer has an exemption certificate on file. Vendor bills, stock received and stock used post on the other side; vendor credits, early-pay discounts and use tax with them. Timesheets give gross pay, with overtime and the minimum wage worked out per workweek; each pay period is approved, locked and sent to the payroll provider, and the provider's payroll register comes back as one journal entry, wages split by line. At month end the close checklist is signed off; once a period is closed (books closed through a date), nothing more posts into it. Reports read the same tables.

What feeds what

InventoryTank makeups and additions, job issues and maintenance parts draw stock down, each item counted in its own unit, with what it comes in and, for liquids, its weight per gallon so weights and volumes convert; purchase orders and receiving bring it in; every receipt, issue and adjustment posts to the ledger at the item's average cost; the reorder report watches minimums. Costs are shown to administrators, managers and office staff only.
PurchasingPOs for chemicals and supplies, and POs raised by outside-processing steps. Stock received waits in goods received not invoiced until the vendor's bill clears it; a different price on the bill goes to purchase price variance, and the bill posts to payables. Bills are paid from a bank account: by a check printed on voucher stock or written by hand, or by ACH, wire or card. A pay-bills run pays each vendor its own way, uses its credits first and takes early-pay discounts; bills over an amount can wait for approval, recurring bills are made by the server, use tax is accrued on untaxed purchases, and the payments add up to each vendor's 1099.
Sales taxAgencies, rates by date and tax codes by place, or one shop-wide rate; what is taxable per process and part; customer exemption certificates with expiry warnings; the liability report by agency and period, which ties to the books; returns recorded as they are paid.
BankingThe bank and card statements, imported as files and matched to the payments, deposits, checks, expenses and transfers already in the books, or added to an account, with rules for the regular ones; the reconciliation each month, locked once the difference is $0.00; the check register, check printing and the positive pay file; expenses paid on the spot; and the receipt inbox, which anyone fills from a phone and the office files on an expense, a bill or a bank line.
LabLab home lists the tank tests due and overdue by tank (an overdue test tells the lab, then a supervisor), the results out of spec, the tests that broke an SPC rule to look into, the open add requests and the re-tests due. Test methods hold each titration and meter reading with its formula and its rule for what to add; the office and lab technicians edit them, and every saved change is a new version. Reagent bottles carry their standardized strength into every titration, and instruments their daily checks; an expired bottle or a missed check warns or refuses a result, as Lab settings says. Add requests go to a person or a role, are done from a phone and post the addition through inventory; a precious-metal line needs a second person as witness. Hull cell panels keep their photos and scale the proved addition up to the tank; AA / ICP runs post metals from a calibration curve; supplier and outside lab reports are entered as tests of the tank, with the lab's PDF, and their recommended additions become an add request.
MaintenanceWork orders against tanks and equipment; a PM comes due by the calendar or by a meter (a tank's amp-hours or hours run, or equipment readings) and raises its work order within the hour, or the next time anyone opens Maintenance; downtime is recorded; parts issued post to repairs and maintenance. The calibration register holds gauges, standards and the instruments on tanks, rectifiers and ovens, each calibration with its points as found and as left, the standard, the lab and its certificate; calibration dates flow to certificates, an overdue instrument warns (or blocks) a reading or a start, reminders go to the owner, and an out-of-tolerance result opens the impact list.
Plant mapDraws nothing of its own: every heat map reads the records the other pages keep (tank tests and runs, SPC signals, step tracking, the time clock, rejects, equipment dates, loads, Cr(VI) samples, invoices, labor, additions). Dollar heat maps follow the price and cost rule: roles that do not see prices do not see them.
Quality checksSix checks, each off, warn (the default) or block under Settings > Quality: training at step start, calibration on readings, calibration at load, step and bake start, receiving to a replaced spec revision, shipping with an open NCR, and a discrepancy at incoming inspection. A supervisor can go ahead over a block with a reason; every warning, override and hold is listed with who and why. A hold, from an inspection, a damage report, a failed QA test or by hand, stops every start until QC or the office releases it with a reason.
TrainingCourses linked to processes, tanks or tank groups, lab methods and polishing operations; each person trainee, qualified or trainer, with the date, the trainer who signed them off and the expiry; the matrix of people against courses with missing, expiring and expired; reminders before expiry; a supervisor can allow someone for the shift with a reason.
ComplianceWastewater samples, with chain of custody and the lab's results, are checked against limit sets from the permit, which ship turned off until someone checks every number; a result over a limit raises two tasks, and the month and half-year reports print with the TTO statement; the treatment plant log issues its chemicals from inventory; hazardous-waste containers and manifests, permits and the SDS library are kept for their retention periods. A chrome shop keeps the NESHAP surface-tension log per chrome tank, due by hours of operation, with a missed reading told at once, and the Cr(VI) exposure and medical records; every regulatory number there is a setting marked to verify against the permit and the current rule.
Precious metalsDaily prices (or the live spot price, when the shop chooses it and the server has a price source) and the part's metal factor produce the surcharge line on quotes and invoices; reconciliation compares metal bought with metal plated.
PolishingA polishing step on a part's traveler lists operations from the shop's library (120 belt, 320 belt, sisal buff) in order and picks one of the part's pay rates ("Polishing $1.80"), paid once per piece for the whole step, with an inspection step after it when ticked. Administrators and managers set the rates; a changed rate is paid on jobs received from then on. A scan of the step opens its Start screen with the pieces filled in; polishers complete runs by count only, and pay is the rate × the pieces completed, once per run. Inspection counts each polisher's pieces apart; rejects feed the rejects report and go back to the same polisher as unpaid rework unless scrapped or returned (a reject on the job page at a polishing step goes back the same way). The polisher is notified and sees it under Rework you owe on My work; administrators, managers, the office and polishing supervisors can reassign it or write it off. The pieces reach the timesheet under the person's pay mode: hourly, piece, hourly + piece or averaged.
TimeSchedules set the expected hours; clock punches, with a note when early or late (and a question first when a badge or a Clock in / Clock out button punches again within 2 minutes of the person's last punch), build timesheets with paid hours, overtime and pay, and print as timecards. Pay is worked out per workweek for every pay mode: straight time (hourly and piece), an overtime premium of half the regular rate for each hour over the threshold, and a top-up to the minimum wage. Labor logged on operations costs the job. Pay periods are approved and locked, sent to Gusto, ADP, Paychex or QuickBooks Payroll as a file, and the payroll register comes back into the books; labor by line splits the wages.
Reports and closeStatements compared with the last period, last year or the budget, a cash-basis profit and loss, the cash flow statement, budgets by account and month, the month-end checklist that ends by setting the closing date (and can let adjusting entries into a closed month), Download for accountant, and cost reports: chemistry per tank and per square foot, metal margin and job cost.
Notifications and messagesEach person chooses, kind by kind, whether a notification shows in the app and whether it is emailed at once or in a daily summary. Tasks, out-of-limit readings, tests overdue, add requests, witnesses wanted and re-tests due, surface-tension readings due, PMs due, incoming discrepancies, new spec revisions, deviation answers, training and calibration coming due, portal quote requests and payments customers say are on the way, and messages between staff all land in the bell; Messages is direct and group chat with links to records.
LibraryThe shop's own files in folders (process data, SOPs, drawings, certificates), apart from the controlled documents under Quality. A restricted folder is for administrators and managers. Storage comes with the plan and can be added to; it counts the Library, part documents, the files on records (receipts, photos, lab reports, taken with a phone camera or uploaded), part images and the logo, and Settings > Billing shows what uses it by kind of file. Photos are shrunk in the browser before they go up by the shop's Photo size, set there too: Standard, High, or Original, which keeps them as taken, including any location the phone stored in them. Every picture added to a record follows it, scans saved as JPG or PNG included; PDFs and other documents, the Library and part documents (prints) are always kept as uploaded.
SettingsTeam and roles (each plan includes a number of team members; adding one more offers an upgrade or a custom pricing request), the customer portal, billing, invoices (template, colours, business and payment details, which columns print), appearance and modules, getting paid (remit-to, the bank details shown in the portal, reminders, the receipt rule), custom fields and terminology, data (import your setup from spreadsheets in order, with a dry run first, exports and the backup), security, the books (the month the fiscal year starts and the closing date), payables (bill approvals, 1099 thresholds and the shop's tax ID), quality (each check off, warn or block, and the reminder days), each person's notification choices, and the automatic tasks the server runs for the shop.
Company and time clock settingsSettings > Company holds the company details, time zone, certificate statement, tax rate, lead time, document numbering, the old discharge log's limits and every posting account (checked against the chart of accounts). Settings > Time clock & pay holds the clock rules and the pay schedules. Shop setup > Company settings opens the Company tab.
Copies and bulk changesDuplicate on a part or a tank makes a new one from it, with "(copy)" after its description or name and a part number or Tank ID of its own. Its setup comes with it (a part's traveler, pay rates, racks, test plans and specs; a tank's chemistry parameters and test schedules, makeup chemicals, amp stages, procedures and treatments) but none of its history. On the Parts list and the All tanks list, the people who edit them tick rows (Shift-click ticks a run of them) and set one field on all of them at once; for parts, the roles that see prices can also change the prices by a percentage, rounded as chosen. Up to 500 records go in one change, saved together or not at all, and each record changed gets its own line in the audit log.
Customer emailsEvery automatic email to a customer (the receiving notice, the shipped notice, the invoice, statements and payment reminders) goes to up to two of its contacts, the customer's own email and its portal users, once per address, when the customer gets that email at all; each portal user can turn the receiving, shipment and invoice emails off for themselves on their Account page. A quote marked Sent emails the same people, and a deviation request sent to the portal emails its portal users; both also show under each portal user's bell, and when nobody can be told the person who sent it gets "No one to notify". Replies go to the billing email under Settings > Invoices, or to the shop owner's email when there is none. In the portal, the Message link that carries the shop's name sends a note to the shop's administrators and office, never to Amp-Hour support. A portal page that fails to load offers Report this instead, which sends the error to Amp-Hour support so it can be fixed.

Live pages

Open pages keep up with what other people do. Most lists, the schedule board, the dashboard and record pages draw themselves again when someone else saves something they show (a record page at most every 5 seconds, a list or the board every 10, the dashboard and the ledger, financials and banking pages every 20), and keep where you had scrolled to. The shop floor screen and the time clock update their own cards and never touch the scan or badge box. While you are typing, have text selected, have a dialog open or have changes not saved yet, nothing is redrawn: a slim bar says what changed ("Updated by Ana Lopez", "New job added by Ana Lopez") with Refresh or Show. A record page shows who else has it open: "This page is currently being viewed by: Ana Lopez" or "This page is currently being edited by: Ana Lopez"; your own other tabs in the same browser are not counted. When two people change the same field of a record, the second save does not quietly replace the first: it asks first, with Reload or Save mine anyway, and a field only the other person changed is kept. Record forms, a job's Edit, quotes, purchase orders, bills, an invoice's PO and notes, specs and deviations are checked this way; other screens save as before. The bell and the Messages count update as notifications and messages arrive, and the check every 90 seconds stays as a fallback. Live updates need the page open; a page that loses its connection reconnects by itself and reads itself again. They come from the one running server, so a second copy of the server started on the same data does not pass its changes on live.

Roles

AdministratorEverything, including team, billing and settings.
ManagerProduction, quality and accounting; can invite staff.
OfficeSales, shipping and accounting.
QCProduction, quality and shipping; no accounting, prices or costs.
OperatorShop floor terminal and time clock, tank tests and add requests; no prices or costs.
CustomerTheir own jobs, certificates and invoices in the portal.
Custom rolesDefined under Settings > Team: a name, a level (manager, office, QC or operator) and the modules the role may open, or added from a template (Bookkeeper, Accountant (outside), Quality manager, Shipping and receiving, Maintenance tech, Floor supervisor). Never more than its level could do; roles on the QC or operator level never receive prices or costs from the server. Six actions (post journal entries, close a month, approve bills, void, import, export) are set per role on the same page.
Bookkeeper and Accountant (outside)Templates on the office level. A bookkeeper keeps the books day to day but does not approve bills or close a month. The outside accountant sees the books and reports, posts adjusting entries and downloads exports, and takes no seat, up to two per shop.
Lab technicianA custom role added to a shop that uses Tanks: QC level, with Tanks, Quality, Inventory and the time clock. Records tank tests, sends and does add requests, edits test methods and tank test set-ups, and sees chemical stock without prices or costs.
EHS coordinatorA custom role added the first time a chrome shop opens the Cr(VI) records: manager level, with Environmental compliance and the time clock. The Cr(VI) exposure and medical records are for administrators, managers and this role only.
Polisher and Polishing inspectorCustom roles added the first time the polishing module is used: a polisher works from the Polishing page and the time clock (plus tasks and messages); an inspector also has Quality, records inspections and deletes only their own records. Piece rates are set by administrators and managers; pay modes, for the roles paid as polishers, by administrators and the roles chosen under Time & pay. A polishing supervisor is a flag on any person, not a role.

Final QC sign-off

Completing a QC step runs the sign-off checks, and the QC Complete dialog lists each one. When a job requires thickness readings, or has a sampling plan and a thickness range, the step needs as many readings as the sampling plan's sample size for the lot, else the count the traveler asks for, else one; a job with neither a thickness spec nor a sampling plan needs none. A reading outside the tolerance, or too few readings, stops the step until the pieces are rejected, an NCR on the job or an approved deviation or waiver answers for them, or an administrator, a manager or QC signs off with a reason, and each of these is logged.

A hydrogen embrittlement relief bake step cannot be completed until its bake record is finished with the hours the step asks for; Settings > Quality sets this check to off, warn or block, and it is Block unless changed. Start bake is filled in from the bake step's own time and temperatures, and a bake cannot ask for fewer hours than its step. A bake recorded as starting before the step it follows was done needs an administrator, a manager or QC to sign off with a reason, and a bake waiting for review counts only when it passed on its own figures. The QC dialog also flags an earlier step that ran shorter than its minimum time.

A sampling plan is set on a part, a customer or a process, and the part's wins, then the customer's, then the process's. A job keeps the plan in effect when it was received, as it keeps its specs, so a plan set later applies to new jobs only. Every shop starts with accept-on-zero (c=0) and ANSI/ASQ Z1.4 level II plans, to check against the standard. Readings can be typed in in, mil, µin or µm and are converted to the job's unit; a wrong reading is voided with a reason, never deleted, and leaves the verdict and the cert.

Starting a new shop

The starter kit's routings name the tank type each step needs as a setup note that never prints. Getting started counts the routing steps still waiting for a tank and lists them, and its Tanks step is done only when none wait. The kit's "Tanks for these processes" makes one tank per type with control limits from the lab library's typical ranges and gives it to every step waiting for that type.

A new shop has no address or phone until you enter them under Settings > Company; until then every form printed with the shop header (the traveler, the packing slip, the quote, the certificate of compliance and the others) shows a "Set your address" line. The invoice has its own header, and its business block shows the same line until they are saved. After an Employees import that made logins, Set temporary passwords gives each new login a temporary password on a printable login sheet (shop ID, username, temporary password), and each person chooses their own password at their first sign-in.

Lab test screen and instruments

The test screen starts in the first reading still to type. Enter goes on to the next empty reading, and Tab to the next reading to type, past the defaults filled in from the tank, the buttons and the procedure; the screen saves only with Save results or Ctrl+Enter. Every meter reading and every typed reading names its instrument: the shop's instruments of that type, with or without a daily check, and the one used last is chosen. The value keeps it, so a failed calibration lists the readings taken on that instrument.

A Hull cell test has New panel: the panel is run, its zones rated and the panel graded, and it comes back to the test with its grade; the saved result names the panel. A new panel starts unrated, and it shows no bright range and no coverage of the tank until a zone is rated.

Add now on a line short of stock starts at what is on hand, and the rest stays on the request to add when the stock comes in. Adding more than is on hand takes stock below zero only when the person ticks Add it anyway. Each standardization records the primary standard's lot and assay, and the mass weighed counts at that purity; it also records the balance it was weighed on, with its calibration standing at that moment.

A training course can be linked to one instrument, or to every instrument of a type. Anyone who enters a thickness reading, a QA result or a lab result taken on that instrument is then checked as at a step start: warned, or refused until a supervisor goes ahead with a reason, as Settings > Quality says.

Audit trail and record history

Setup > Audit trail, also reached from the Quality page, lists the changes made in the shop, newest first, 100 to a page, with the total count. Administrators, managers, the office and QC read it; a custom role on one of those levels needs Quality or Shop setup. It filters by kind of record and record number (with the record's own lines, such as a tank's parameters or a job's operations, when that box is ticked), by person, including changes the server made on its own, by kind of change, by words and by dates in the shop's time zone. Download CSV gives every row the filters match, and the download is itself recorded. Each row links to its record. Saving Settings, appearance, fields and terms, or a process's routing keeps the old and new value of each thing that changed. A role that does not see prices and costs sees no money values in the trail and no rows of the books.

Part, process, tank, customer and job pages end with a History card of the record's last changes and a link to its full history; a tank's card includes its parameters and procedures, and a job's its operations. Job, customer, quote and invoice pages have Add task, which links the new task to the record; the Tasks page shows the linked record and opens it. Deleting a task asks first. A thickness reading is never deleted: it is voided with a reason and stays on the record.

Open NCR on a job fills in the job's customer, part and quantity, and an NCR saved with only its job takes them from the job. The owner of an NCR or a CAPA, and the person a task or an action item is assigned to, is chosen from the shop's staff, never a customer's portal login. The NCR page has Trace a chemical lot, which opens the chemical lots. A process step waiting for a tank shows the tank type the starter kit expects there.

Tank procedures and bath life

A tank's written procedures are controlled documents. A new procedure, or a change to one, is a draft until someone who did not write or change it approves it (an administrator may approve their own), and the approval keeps who approved it and when. A change is a new revision with a note of what changed; the approved revision before it stays in use until the new one is approved, and every revision is kept in the procedure's History with who wrote it, who last changed it and who approved it. Print tank sheet prints only the approved revision of each procedure, with its number, who approved it and when. Procedures written before this became revision 1, approved by "migration". A procedure that is no longer used is withdrawn: it stops printing and keeps its history.

A bath's life can be set in days, in metal turnovers (MTO, for electroless nickel) and in amp-hours per gallon, on the tank form under Bath life; the bath is due for a dump at whichever it reaches first. The tank page's strip shows how far along the first limit is, such as "4.2 of 6 MTO", and the dump due date follows the limit that comes first, worked out at the rate the bath has run since its makeup. Make up new bath, the dashboard and the attention lists follow that date. Metal turnovers are counted from the nickel additions, so a Metal turnovers line on the tank shows the count and is never a test to type or a test that falls due. A dump date typed on a tank before its bath life was set is kept: it stays the dump date while it comes first, until the next makeup.

Shipments: weight, carrier, tracking and email

On Ship Jobs the Weight follows the Ship qty: the part's weight each times the pieces, so 200 of 296 pieces at 0.6 lb weigh 120 lb on the packing slip and the carton labels. A weight typed from the scale stays when the quantity changes. Carrier starts with the carrier of the customer's last shipment, or with Ship via on the customer record before their first shipment.

Edit on a shipment changes the carrier, tracking number and notes after the slip is printed, and the slip, the labels and an emailed slip show the change. Email on a shipment sends the packing slip as a PDF with the carrier, the tracking link and the portal link; Email on a customer return sends the RMA form with the rework job and its due date. The automatic shipped email gives the ship date as a date, each job with the customer's PO, the tracking number as a link, and the shipment's certificates attached.

Notification defaults by role

Settings > Notifications has a Defaults by role grid for administrators: a row for each kind of notification and a column for each role, the shop's own roles included. Each cell says what people in that role get until they choose for themselves: in the app, in the app and by email, in the app and in the daily summary, by email only, in the daily summary only, or not told at all. When QC's tests due and overdue are set to App and email, a QC lead who joins next week gets out-of-spec emails without opening the settings. A custom role follows the level it is built on until you set it. Each change is saved at once and kept in the audit log.

A person's own choice always wins over the role's default. A kind someone has not chosen says that it is set by the default for their role; a kind they have chosen has Use the default, which drops their choice so they follow the role again. A role default changed later does not touch choices people have already made.

Every reminder that should go out once (a wastewater sample at the lab too long, a surface-tension reading or a Cr(VI) date due, training coming due, a tax certificate or return due, an instrument due for calibration, the month-end close) is recorded when it is sent, so running the daily jobs again on the same day sends nothing twice.

Email wording

Settings > Email wording holds the subject and the opening paragraph of every email the shop sends: the quote, invoice, certificate, statement, purchase order, shipment and return emailed with Email, and the automatic statement, receiving notice, shipment notice, invoice and payment reminders. Placeholders in braces are filled in from the document when the email goes out, for example {number}, {total}, {due}, {customer}, {po}, {job} and {part}; each email lists the ones it can use, and a placeholder it cannot fill is refused when you save. So is an apostrophe right before a placeholder, as in '{number}', because the placeholder would go out as typed; use double quotes instead.

The preview beside the text shows the email with the words typed, built from the newest document of its kind (made-up values for an automatic email), before anything is saved. Until an email is changed it keeps its built-in words, which also cover the cases one text cannot, such as a quote with no good-until date; Reset to default brings them back. The statements and payment reminders the shop sends on a schedule use the same words.

Emailing a Draft quote marks it Sent: the quote shows the send in its Emails sent list, and the customer's portal users are told in the portal. Nobody gets a second email about it, and the people the sender left off the email are not emailed behind the sender's back. A send that fails leaves the quote a Draft.

A shared floor terminal

Terminal at the top of Shop floor makes a tablet a shared terminal, remembered on that device under the name it is given. Each person scans their badge and types their PIN before they start, stop, complete, load, reject, take readings, ask the lab for a test or clock in and out there, and the labor, the portions, the readings and the audit trail name that person and the terminal; with nobody signed in the server refuses that work instead of recording it under the terminal's own sign-in. The next person's badge and PIN sign the previous person out of the terminal, and so does the shop's idle time, 2 minutes unless an administrator changes it on the Time clock page. Each person sets their PIN on the Time clock page; five wrong PINs lock the badge for 15 minutes, and an administrator resets PINs and gives starting PINs there.

When the shop blocks a start for training or calibration, Supervisor approval in the dialog takes a supervisor's badge, PIN and reason on the same terminal (an administrator, a manager or QC; for missing training also a trainer on that course): the training, calibration and quality gate logs record the supervisor, the work stays the operator's, and the approval answers that one blocked start only. With no network the floor shows "Offline — reconnecting", keeps a scanned code and opens it when the connection is back, and sends a Start, Stop or Complete once more as the same request when the connection is back within 30 seconds, so it is recorded once.

Team security, backups and deleting the shop

Settings > Team shows each member's two-factor state (On, Off, or Required when the shop's rule covers their role and they have not set it up yet) and how many devices they are signed in on now. An administrator can sign a member out everywhere, for a lost phone or a shared computer left signed in; they sign in again with their password. Each pending invitation has Copy link and Resend. Resend emails the invitation again and gives the link 7 more days, so an invitation that ran out comes back instead of being cancelled and sent again. Expired invitations stay on the list, marked, until they are resent or cancelled.

Under Settings > Security the shop's two-factor rule can cover any role, built-in or custom, and covers administrators and managers unless changed. A custom role is covered when its level is ticked. Someone the rule covers who has not set up two-factor authentication can open only their own account settings until they do.

An invited customer gets an email that names the customer account the portal is for and lists what they can do there, in whole sentences: follow their jobs, download certificates, see invoices, answer quotes and approve or decline deviation requests, leaving out any part of the portal the shop has switched off. The device that accepts an invitation counts as the person's own, so their first sign-in does not send a New sign-in alert.

Settings > Data has Download full backup: the shop's database and every file in it, in one ZIP. Restore points lists the nightly backups of the shop and the copies taken before earlier restores, and each one downloads as the same ZIP. The owner can restore the shop from a restore point or from an uploaded backup of this shop (a full backup ZIP, or a database-only .db that leaves the files as they are); a backup of another shop is refused, because every shop's database carries its own shop ID. Restoring asks for the owner's password, the shop ID typed out and, when it is on, a two-factor code. A copy of the shop as it is then is taken first and listed under Restore points, so a restore can be undone. Every member keeps their login and role, a portal login for a customer the backup does not have is switched off, everyone in the shop is signed out, and the restore is written to the security log and to the restored shop's audit trail.

Delete shop under Settings > Shop schedules the deletion 7 days ahead and has Download backup inside the dialog. Until the date the shop is read-only for everyone, the owner is emailed a link that keeps the shop in one click, and the owner can cancel under Settings > Shop. The server deletes the shop when the date comes.

Lists, statements and the outside accountant

Every list has Download CSV, beside the Filter box when the list has one: the rows as shown, filtered, sorted and on the tab that is open, every page of them. The Invoices list has an Overdue tab, and a date range and a customer beside Filter, which the server answers for every invoice, 100 at a time, saying where you are ("1–100 of 1,412"); ticked invoices print as one document or are emailed with their PDFs. Bills opens on All open, purchase and general bills together with a Kind column, and one Enter bill offers the purchase-order bill when the payee has goods received and not billed.

A statement ends on its Statement date, the last day of last month unless another is picked, so a September 30 statement shows the September 30 balance and nothing after it. Print all statements prints everyone who owed money on that date as one document, one statement to a page, and the customers an email skipped can be printed at once.

A view-only role such as the Accountant (outside) sees Invoices, Payments, Bills, Pay bills and the journal without the create, pay and void buttons, which the server refuses it anyway, and still posts adjusting entries. It reads the payroll registers and the burden under Finance > Payroll register without taking a paid seat, and Download for accountant adds the payroll registers and the burden summary (no timecards, no pay rates) while Payroll registers is ticked.

Repeat lots, due dates and chasing quotes

Receive another lot on a job, and Receive job on a production part's page, open Receive job with the customer and part filled in. Due starts from how long the part's last three finished lots took (the median, from received to finished), else its process's last lots, else the Default lead time under Settings > Company; the line under the box names the lots and how loaded the busiest area of the lot's route is over the next seven days, with a link to Capacity. After Save and receive another the message offers the traveler of the job just saved, or of every lot received on the form.

The dashboard's Needs attention lists quotes Sent and not answered for seven days or more and quotes about to expire; each opens the quote with Email again and Mark lost, and Show all opens the Quotes list's To chase tab with every one of them. The Quotes list shows how long a Sent quote has waited and marks expired ones. Copy to new quote makes a Draft dated today from any quote, Mark as sent on a Draft quote's print view sets it Sent and tells the customer once, and Convert to jobs opens the new travelers. A portal quote request offers Quote this on the customer's page: the new quote starts with the requester as Attention and the request in Notes, and saving it closes the request. The customer page shows Open quotes beside Invoices and prints a price list from its Parts card.

Chemical lots and asking the lab for a test

Receiving a chemical, on its item page or on a purchase order, takes the supplier lot and the certificate of analysis, a PDF or a photo; a receipt posted without them can have them added later. Add now and each open line of an add request offer the item's lots with stock, oldest first, with the oldest chosen, or Not recorded, and the addition keeps the lot. When the amount is more than the lot picked has left, the dialog says so: that lot gives what it has and the rest is recorded from the next lots, oldest first, one addition per lot, so no lot's trace shows more than it received. Tick It all came from lot (with the lot's number) when the container really held more than the count says; the lot's page then flags it for the office to check. A new COA replaces the one on file, which comes off the receipt. A lot's page, reached from Lots on Chemical inventory, from a receipt that names it or from an add request's line, lists what was received with its COA and every addition from the lot: the tank, the date, the quantity and who added it. The additions log and a tank's Additions tab have a Lot column that opens the lot's page.

Ask the lab to test, on a step's card on the shop floor screen, in Record reject and on the tank page, sends the lab a test request with what was seen (burning, pitting, poor coverage and the like), a note and an optional photo; a request from a step or a reject keeps the job, the step and the reject count. The lab's lead role and every lab technician are notified and the request heads Lab home under Asked to test. The next test of the tank answers it, and the person who asked is told which readings are out of spec, or that every result is in spec. The lab can close a request without a test, with a reason, and the person who asked is told. A person whose role does not include Tanks gets the results in the notice itself, which opens their notifications rather than the lab page.

Certificates: Review and sign, and what they print

A certificate of compliance is issued unsigned and says Not yet signed in its signature box. Review and sign on the cert is for QC, managers and administrators: they check it against the job and sign with their name, title and the date, which the cert, the portal copy and the emailed or downloaded PDF then print. Quality > Certs shows who signed each cert and when. A signed cert cannot be changed; issue a new one to correct it.

Settings on Quality > Certs: with Email certs only when signed on, an unsigned cert cannot be emailed and the shipped email attaches only signed certs. Print who did each step and Print the step parameters are off unless the shop turns them on, so by default a cert shows the step names and dates while operator names, tanks, times, temperatures, amps and volts stay inside the shop; they apply to certs issued from then on.

Customer portal: PDFs, requests with drawings, and accepting with a PO

In the portal, Download PDF on a certificate, an invoice and a quote saves the same PDF the shop emails, for the customer's own documents only, and on a phone the certificate scrolls sideways instead of being cut off. Request a quote takes up to five drawings of up to 20 MB each, and My requests under the form lists each request with its drawings, where it stands and the quote it became. Request this again on a job page, or next to a part found with the search box, starts the request with the part, revision, finish and the quantity last ordered. The office's notice of a request opens it with its drawings and Quote this, and so does the request's activity on the customer's record.

Accepting a quote in the portal can attach the customer's PO document, kept with the quote: the quote's Answered in the portal card links it for the office. The person who accepted gets an email with the accepted quote as a PDF, the PO number and the signature line as typed.

Finding a record from the top search

The search box at the top of every page (Ctrl+K) finds pages and settings by name, and once two characters are typed it finds jobs, customers, parts and tanks too. It also finds the records a customer reads out on the phone. An invoice, a quote, a shipment or a cert is found by its number as printed (INV30003, Q1004, S7005) or by its digits alone (30003). A shipment is found by the carrier's tracking number as well, with or without the spaces. A purchase order to a vendor is found by its PO number. The customer's own PO finds the jobs it came in with and the invoices that bill it, and when one PO covers several jobs, each of them is listed. Case, spaces, dashes, dots, slashes and # make no difference. The record typed in full comes first, and Enter opens it. Each person finds only what their role can open: invoices for the office, managers and administrators, purchase orders for QC as well, and the amounts only for the roles that see prices.

Add chemical on a tank page and Make up new bath name the chemical lot the way the lab's additions do. The oldest lot with stock is chosen, another lot can be picked, and Not recorded leaves the addition without one. When the amount is more than the lot picked has left, the rest is recorded from the next lots, oldest first, and a message says where it went.

Other systems: API keys and webhooks

Settings > Integrations is for administrators. New API key makes a key for one system, with a name, Read only or Read and write, and whether it sees prices, costs and amounts. The key is shown once; Amp-Hour keeps only a fingerprint of it, and the list shows its first characters, who made it and when it was last used. Revoke stops it at once. The other system sends the key in the Authorization header and reads jobs, customers, parts, quotes, invoices, shipments and certificates at /api/v1, a page at a time and, with updated_since, only what changed since its last pass. A key without prices gets them empty and no invoices, and a read key cannot change anything. Changes made with a read and write key are in the audit trail under the administrator who made the key, marked with the key's name. A key is not a person: the time clock, the floor terminal, notifications and messages refuse it. When the administrator who made a key leaves the shop or is no longer an administrator, the key stops working and the list says why.

New webhook takes the address of the receiving system and the events to send: a job received, a job shipped and an invoice made, whichever screen or scheduled run made it. Its signing secret is shown once, and every post carries an X-AmpHour-Signature header the receiver checks with it. Send test posts a test event at once, and Deliveries lists what was sent with the answer it got, with View and Send again. A post that fails is tried again for about a day; when every try fails the webhook is switched off and the administrators are told, and switching it back on sends what was waiting. The full reference, with every field, is docs/api.md.

Import files for QuickBooks or Xero

Export for QuickBooks or Xero, linked from Bills and a card on Settings > Integrations, makes a ZIP for the accountant for a date range of up to a year: QuickBooks Desktop (IIF), QuickBooks Online (CSV) or Xero (CSV), with the invoices, bills, payments and other journal entries ticked. The chart of accounts (with each account's number), the classes, the customers and the vendors come first, so every name the entries use is there when they are imported; each entry line carries its account, its customer or vendor and its class. A read-me gives the order to import the files in, and the page says what each file holds before the download. An entry the other system would refuse (a receivable line with no customer for QuickBooks, a manual entry on a bank account for Xero) is left out and listed to enter by hand. Live sync with QuickBooks or Xero is not offered: these are files to import, and the layouts have not yet been checked against a live company file.

Paying vendors by ACH

A vendor's Payables and 1099 card takes its bank account for ACH payments: the routing and account numbers, checking or savings, the entry class (CCD for a business, PPD for a person) and the name on the account. The numbers are stored encrypted like the TIN and shown only by their last 4 digits; they never appear in the audit log or in an export. Payments made by ACH wait on Bills > ACH files, where Make the ACH file downloads a NACHA file for the pay date picked, to upload on your bank's ACH page. The bank's ACH details are set on the same page. Every file is logged and each payment keeps its trace number; Make again makes a file again from the same payments, and voiding a payment that was in a file warns that the bank must be asked to stop it. Making the file needs the Export data permission, since it carries the vendors' bank numbers.

The All open, Paid, Void and All tabs of Bills come 100 bills at a time with the count of every bill, and the Filter box, the sorts, the chips and Download CSV cover every bill. The vendor page's Open bills card has one Enter bill, as the Bills page does.

Recurring invoices and entries, finance charges and invoicing shipments together

Recurring invoices (on the Invoices page) and Recurring entries (a tab of the General ledger) work like recurring bills: a template with its lines, repeated every so many months, weeks, quarters or years until an end date or a count, made by the server each morning at 5:30. Post it raises the invoice (emailed to customers who take invoices by email) or posts the entry. Save it for review keeps the document out of the books and tells the office; its review page lets the date and the lines change for that one time before Post, or Skip. Pause stops a template until Resume, and Run now makes the next one at once, dated its next date. A date is made only once, however often the run repeats. An entry must balance, and an accrual can reverse itself on the 1st of the next month. A document dated in a closed period cannot post on its own, so it waits for review with the reason. An entry posts only for someone whose role may post journal entries, as a typed one does: a role without that saves its recurring entries for review, and the review notice goes to the people who can open the page and post it. A stopped template still opens, read-only, with what it made.

Finance charges, on the Invoices page, previews the customers with balances past due on a date: the balance, the oldest days late, and the charge at the monthly rate, at least the least charge, once the grace days have passed. Ready customers start ticked, and Leave out keeps a customer out of finance charges until Include. Raise finance charges posts one invoice per ticked customer on the finance-charge charge type (not taxed unless the shop says so under Sales tax), dated the as-of date (today at the latest), to a Finance charges revenue account. A customer is charged once a month, and a finance charge is never charged again. Administrators and managers save the rate, the least charge, the grace days and the account as the shop's terms.

Uninvoiced shipments has a tick on each row and Invoice selected: one invoice per shipment, or one invoice per customer combining its shipments. A combined invoice is dated the last ship date, takes the customer's tax and terms, lists every shipment on it and notes each line's shipment; shipments going to places with different sales tax are invoiced apart. A shipment is invoiced once, and voiding the invoice frees its shipments to be invoiced again. On the statements Sent list each row opens the statement as it was sent, with its own dates.

Customer portal: where a job stands, holds and late jobs

Place on hold on a job takes, besides the shop's own reason, an optional note for the customer and a new promise date. The customer portal shows the note and the new date on the job and in the Jobs in process table while the job is on hold; the reason stays inside the shop. Under the hold on the job page, Add a note for the customer (or Edit what the customer sees) changes them later, also on a hold an incoming inspection placed. The job's Edit form keeps the revised promise date, and the due date stays what was first promised.

The portal shows each job on a line of stages: Received, In process, Inspection, Ready to ship and Shipped, with "Step 4 of 7" and a bar of the steps done; the step names stay behind Step details on the job page. A job whose promised date has passed is marked Late, and a job partly shipped says how many pieces are still to ship. The job page shows the receiving note written for the customer and lists the deviation requests that cover the job, each with Answer while it waits for them. On a phone the Jobs in process table keeps the job, part and progress columns and puts the PO, the promised date and where the job stands under the job number.

Approving a deviation, and accepting or declining a quote, starts with the signed-in person's name and title filled in; the signature line is still typed. How to pay says payment is not taken online, and Tell us you paid lets the customer say a check, an ACH or a wire is on the way. Credit on your account shows on the portal home only when there is credit to use.

The bake adhesion test

A bake adhesion test proves the coating sticks: plated parts or coupons are heated to a set temperature for a set time, quenched or not, and looked at for blistering, peeling or flaking (ASTM B571 heat-quench). It is separate from the hydrogen embrittlement relief bake. It has no start-within deadline after plating and is not on the HE bakes tab, it never counts as an HE relief bake, and an HE relief bake never counts as a bake adhesion test. It is set up as a QA test plan of the kind Bake adhesion test on a part, or on a customer or a process for all their jobs, with the set point, the time, the quench, the samples, the spec and whether a pass prints on the cert, and every job the plan covers gets the test.

The traveler prints each bake adhesion test on its own line under the steps: the test and its spec, the set point and time, the quench and the samples, with boxes for the oven, the times in and out, the result and who checked it.

Until the test passes, the job is held. Its last QC step is not signed off, and no certificate of compliance is issued for it, with a shipment or with Issue cert. A pass on the job, on the job its lot was split from, or on another job of the same lot for the same customer releases it. So does an approved deviation or waiver in effect for the job that is about the bake test: its title or its characteristic says bake test, or gives the test's number. A waiver about another requirement that only mentions the bake test does not release it. At final QC the deviation or waiver is chosen in the QC Complete dialog. A failed or voided test does not release the job, and neither do rejected pieces, an NCR or a supervisor's reason.

Signing off over a check on a shared terminal

On a shared floor terminal, when the thickness readings or the hydrogen relief bake record stop a Complete, the dialog offers Supervisor approval: an administrator, a manager or QC scans their badge, types their PIN and says why on the same device, as for a training or calibration gate. A trainer's badge is refused for these checks. The sign-off is logged under the supervisor's name, the work stays the operator's, and the approval answers that operator's Complete of that step only, once. The QC Complete dialog on the job page offers Supervisor approval too, as a way to release the check, to anyone who may not sign off over it themselves.

Until QC has reviewed and signed a certificate, its PDF says Not yet signed, as the signature box on its page does.

The shop floor on a phone, a line tablet and a wall TV

On a phone the step's Start, Complete and Add to a load stay at the bottom of the screen while a job card is on it, the customer, part and process sit on one line under the job number, a held job says ON HOLD right under the card's header, and a load being built sits right under the scan box. Your running pieces and a running load show how long the rack has been in against the step's dwell, for example "In tank 12 min of 40–60 min": the line turns amber at the minimum, with one beep and buzz, and red past the maximum. A step or load with no tank, such as a bake, reads "Running". Anyone else who opens the card sees each person's running pieces with the same clock, without the beep. Work in an area names each step's tank and its rack or barrel.

Terminal on a line tablet also hides the sidebar, the top bar and the banners and makes the scan box and the buttons larger; the badge strip stays. The area chosen when Terminal is turned on is kept with it, and a person signed in on the terminal stays signed in when the page is reloaded, until they sign out or the idle time runs out. TV mode on the Schedule board shows the board for a wall TV: no sidebar, larger type, only the areas with work, late and due-soon work first in each, and when more areas have work than fit the screen they take turns every 30 seconds. Opened from a board showing one area, it shows that area across the whole screen.

Complete load meets the same sign-off as a step's Complete: a QC line whose thickness readings fail, or a bake step without its bake record, is refused in that job's row, which offers that check's own ways out (rejected pieces, an NCR on the job, an approved deviation, or a supervisor's reason), and a check that only warns comes back with the load's warnings. A voided reading does not count as a reading on the load card.

Getting started

A new shop lands on a checklist that is computed from its own data, with a starter kit of areas, materials, reject codes and 25 process routings.

The trial and the sample shop

Start a trial creates your account and your shop. The trial runs 14 days on the Professional plan and needs no card. A promotion code from a flyer or an email, entered on the sign-up form or later under Settings > Billing, makes the trial longer; one code per shop. The sign-up form has a box, checked by default, labelled "Include sample data (customers, tanks, processes, jobs)". Leave it checked and the shop opens with 21 tanks, 13 open jobs, real routings and a few weeks of history, so you can see how a job, a traveler, a tank analysis and a cert connect before you enter anything of your own. It also shows the newer pieces at work: areas from Receiving to Shipping (Polishing is the board column for polishing steps; the retired Cadmium line is an inactive area), the Nickel line, Zinc line and Nickel-chrome line tank groups (its chrome tank strikes at 180 A/ft² for 30 seconds, then plates at 140, and the traveler of its part BW-5120 prints both stages in an Amps table), the usual polishing operations, two brass parts whose travelers polish, buff and run the Nickel line (one with its own nickel time) with polishing pay per piece, a carbon treatment overdue on the nickel tank, this morning's lab tests (the electroless nickel titration came out low at 5.144 g/L, and its What to add asks for 1.28 gal each of EN-A and EN-B), a customer sample with a quote, and one part still on an old process line, listed under Needs rebuild.

The Getting started page lists a job through the shop in order: receive a job, print its traveler, scan it on the shop floor terminal, record a titration on a tank, record thickness at QC, ship it, then look at the dashboard. When you have seen enough, the shop owner presses "Clear sample data" (on the dashboard, on the Getting started page, or under Settings > Data) and types CLEAR. Every sample customer, part, job, tank, invoice and record is deleted; your login, settings and chart of accounts stay. Nothing in the sample shop is billed or visible to anyone else.

The tour and the manual

A shop that starts without sample data, or one whose sample data has just been cleared, is offered a guided tour: a spotlight walks through the sidebar and every main screen in about five minutes, one short card at a time, with Back, Next and End tour. It is offered once per account, on whichever device you sign in from, and can be started again at any time from Settings > Account or the name menu in the top bar. The last card links to the manual, which describes every screen and how the parts connect, as a web page at amphour.io/manual and as a PDF at amphour.io/manual.pdf.

The checklist

Getting started sits in the sidebar under Overview for administrators and managers until the list is complete. It is not a wizard with a saved position: each step is checked against the shop's tables, so it stays true however the data got there, typed, imported or created by the starter kit.

StepDone when
Company detailsName, phone and address are set, as they print on travelers, packing slips, certs and invoices
Logo and colors (optional)A logo is uploaded under Settings > Appearance
AreasAt least one area exists
Processes and routingsAt least one process has routing steps
TanksAt least one active tank exists and no routing step is waiting for a tank
Your teamA second staff login exists or an invitation is outstanding
Customers and partsAt least one customer and one part
Receive the first job and print its travelerA job exists
Run it on the floorAn operation has been completed
Ship and invoiceA shipment exists
Equipment and calibration (optional)A piece of equipment exists
Choose a plan (optional, hosted shops)A subscription is active

Company details, the starter kit and team invitations are done right on the page; the rest link to the screen where the work happens. The dashboard shows a card with the next step until a manager hides it.

A new shop starts with no address and phone, so nothing invented prints as if it were yours: the Company details step above shows empty boxes with a grey example in them. Until both are saved, every form printed with the shop header (the traveler, the packing slip, the quote, the certificate of compliance, the statement and the others) shows a "Set your address" line where they would be. The invoice has its own header, and its business block shows the same line until they are saved.

While a routing step that names a tank type has no tank yet, the Tanks step reads "12 routing steps waiting for a tank" (with your number) and stays open. The link opens the list of those steps: the process, the step and the tank type it needs. Open a process to give each step a tank, or use the starter kit's tanks below.

Everything else about the company is under Settings > Company: the time zone, the certificate statement, document numbering and the posting accounts, each picked from the chart of accounts. The time clock rules and the pay schedules are under Settings > Time clock & pay.

What does your shop do? Above the checklist an administrator ticks the kinds of work the shop does: anodizing, plating, polishing or chrome, any mix of them, and whether the books (the general ledger, banking, bills and purchase orders) are kept here or stay in QuickBooks or with an accountant. The answer switches on the modules that kind of shop uses and hides the rest from the sidebar, so a shop that only anodizes and keeps its books elsewhere starts with about sixty links instead of more than eighty: no polishing, precious metals, ledger, banking or payables, and none of the chrome records (the surface tension log and Cr(VI) exposure). Nothing is deleted. Settings > Modules asks the same question and lists every module with its own switch, so any of them can be switched on again later.

Keyboard shortcuts. / or Ctrl+K goes to the search box, N on the Jobs list opens Receive job, and Alt+P on a job prints its traveler. Only Ctrl+K works while you type in a box; none of them works with a dialog open. The name menu at the top right lists them.

The starter kit

"Choose from the starter kit" opens a picker. Everything in it is editable afterwards under Setup, and items that already exist in your shop are skipped.

Standard areas
13 of them, from Receiving / Inspection through polishing and the pretreat, anodize, plating, electroless nickel, passivation, bake and paint lines to Final Inspection and Pack & Ship, each with a labor rate and an overhead rate for job costing. Rename them to the parts of your plant under Setup > Areas.
Base materials
16 materials with process notes: 7075 is etch-sensitive, 2024 smuts after etch, high-strength steel gets blast and no acid pickle, 17-4 PH prefers citric passivation.
Reject reason codes
15 codes, from adhesion and blistering to rack marks and count short.
Precious metals
Au, Ag, Pd and Rh with a base price for the surcharge.
Processes you run
25 processes grouped by family: anodize, chem film, zinc, zinc-nickel, nickel, copper, tin, silver, hard gold, passivation, black oxide, phosphate, e-coat, powder, polish, strip and rework. Each has its spec, a default price and unit, a minimum lot charge, a thickness range and an ordered routing with time, temperature, current density, voltage and work instructions per step.

Routings name the tank type each step needs (sulfuric anodize, sulfamate nickel, seal) as a setup note that never prints on a traveler. The note goes as soon as the step has a tank. A bake or a cure runs in an oven, which is equipment, so those steps wait for no tank.

Tanks for these processes

The last part of the picker lists one tank per tank type that the ticked routings name, and the types your shop's routings are still waiting for. Each tank comes with its control parameters, units and minimum, target and maximum from the typical ranges in the lab library, with the test method for each. The anodize tank, for example, gets free sulfuric acid at 150 to 200 g/L and dissolved aluminum at 2 to 15 g/L. Every routing step that waits for that type gets the tank. Enter each tank's volume, and check the limits against your supplier's data sheet. Run it again and nothing is made twice; a process added later has its steps given the tanks already made. "Tanks for these processes" on the Tanks step opens the same list for the routings already in your shop.

Your team

Office and QC people are invited by email from the checklist or from Settings > Team, with a role for the batch: Office, Manager, QC or Administrator. If the server has no email configured, the invitation links are shown for you to send yourself. Operators do not need an email address: give them a shop-floor login (shop ID, username, password) for the Shop floor terminal and the Time clock.

RoleCan reach
AdministratorTeam, billing, settings, audit trail, and everything below
ManagerProduction, quality, accounting; can invite staff
OfficeSales, shipping, accounting
QCProduction, quality, shipping; no accounting, prices or costs
OperatorShop floor and time clock, tank tests and add requests; no prices or costs
CustomerTheir own jobs, certs and invoices in the portal

Custom roles come on top of these, under Settings > Team. A shop that uses Tanks gets a Lab technician role, and one that uses Polishing gets Polisher and Polishing inspector; see Team, notifications, messages and security.

Working together

Several people can have the same record open, and each page shows it. A record page (a job, part, customer, quote, tank, rack, load, NCR, spec, deviation, work order, piece of equipment, invoice, purchase order, bill, vendor, shipment, stock item and the other Setup records) has a banner under its heading naming the others on it: "This page is currently being viewed by: Ana Lopez, Bob Ng", or, in a warning colour, "This page is currently being edited by: Ana Lopez", and "Being edited by: Ana Lopez · Also viewing: Bob Ng" when both. Someone counts as editing while they have the record's Edit dialog or edit page open, have pressed Edit details on its form, or have typed changes they have not saved. Your own other tabs in the same browser are not listed. The same login on another computer or tablet is, as "Ana Lopez (you, on another device)", because a shared floor login on two tablets is two people. A name leaves the banner as soon as that person goes to another page, closes it or signs out; a tab left in the background, or a computer that drops off the network, leaves within about a minute (a tab holding unsaved typing stays on). Only staff who may open the record appear on it; customers in the portal never see the banners or appear on them, and a login with the Accountant (outside) role always shows as viewing.

Most lists, the schedule board, the dashboard and record pages update by themselves when someone else saves something they show: at most every 5 seconds on a record page, 10 on a list or the board, and 20 on the dashboard and the ledger, financials and banking pages. Nothing is redrawn while you are typing in a box, have text selected, have a dialog open or have changes not saved yet. A slim bar at the top of the page says what changed instead, such as "Updated by Ana Lopez · Refresh", "New job added by Ana Lopez · Show" or "Ana Lopez saved this job · Refresh", and its button draws the page again (asking first when you have unsaved typing). A record deleted while you have it open says so in the bar ("Ana Lopez deleted this job"). The Polishing and Metal prices pages only ever show the bar. A tab in the background catches up when you come back to it, and a page that lost its connection (a server restart, the Wi-Fi) reconnects by itself and reads itself again. A customer, part or other record added elsewhere is offered in the pickers of the next form you open, and in a picker you type in as soon as you type; the bell and the Messages count follow as notifications and messages arrive.

Two people saving the same record. The record forms (customers with their contacts and follow-ups, parts, tanks, racks, vendors, equipment, NCRs, CAPAs, stock items, processes and the other Setup records), a job's Edit, quotes, purchase orders, bills, an invoice's PO and notes, specs and deviations remember what they loaded, and a save is checked field by field against what is stored now. A field only the other person changed keeps their value, so saving an older copy no longer writes over it. A field you both changed stops the save with a question: "Ana Lopez saved this job while you were editing", naming the fields, with Reload, Save mine anyway and Keep editing. Reload brings in their values and keeps what you typed; a box you both changed shows theirs with "You typed: … Use mine" under it, so you can choose. On quotes, purchase orders, bills and deviations, which carry lines, the first button is Open their version instead: it opens the record as it is now in a new tab and your form stays as typed (lines are sent only when you changed them, so changing the header alone keeps the other person's lines). Save mine anyway writes your values over theirs for the fields you changed, and only those. The question says "Someone" when it cannot tell who made the change (a change from the shop floor or the schedule board, say). Other screens, such as work orders and a part's traveler, are not checked this way: the later save wins for what it changes.

Finding a record

The search box at the top of every page (Ctrl+K) finds pages and settings by name, and once two characters are typed it finds jobs, customers, parts and tanks too. It also finds the records a customer reads out on the phone. An invoice, a quote, a shipment or a cert is found by its number as printed (INV30003, Q1004, S7005) or by its digits alone (30003). A shipment is found by the carrier's tracking number as well, with or without the spaces. A purchase order to a vendor is found by its PO number. The customer's own PO finds the jobs it came in with and the invoices that bill it, and when one PO covers several jobs, each of them is listed. Case, spaces, dashes, dots, slashes and # make no difference. The record typed in full comes first, and Enter opens it. Each person finds only what their role can open: invoices for the office, managers and administrators, purchase orders for QC as well, and the amounts only for the roles that see prices.

Pages open faster after the first visit. The browser keeps the app's own files and asks the server only whether each one has changed, so a floor tablet that reloads the job page downloads again only what an update changed.

Bringing your setup in from spreadsheets

Settings > Data > Import your setup loads the shop's lists from spreadsheets, one file at a time, in the order below. Each file has a template (its columns, with one example row) and a filled-in example from the sample shop: download either, fill it in, save as CSV and upload it, or paste the rows. A column heading can be the template's name or the label on the form, in any case; a heading the file does not know is listed as ignored, so a typo shows up instead of being dropped quietly. References such as a part's customer or process are given by code or by name. The parts file can also name each part's rack by its code in a rack_code column; the part is linked to that rack, as its usual rack when it has none.

Dry run first. Dry run reads the whole file and says what would happen, row by row (created, updated, unchanged, removed, or the row's error with its spreadsheet row number), without changing anything. Import then writes it. Rows with an existing code are updated, new rows are created, and nothing is deleted: a file that carries a list for a parent, such as a tank's control limits or a process's steps, replaces that list for the tanks or processes named in the file and leaves every other one alone. All or nothing is ticked by default, so a file with any row error writes nothing; untick it to write the good rows and get the bad ones back as a list to fix. A file is limited to 50,000 rows and 4 MB (an export from here always fits); split a larger one. The same page exports each file with the same columns, references as codes, so an export loads back unchanged, here or in another shop.

The files, in order. Each file says what must be loaded before it so its references resolve. The order is advice, not a lock: a reference that is not there yet is only that row's error, and the file can be run again after.

  • Employees (administrators only): username, name, role, title, badge, email, pay type and rate, hire date and the polisher pay mode. Make a login = yes makes a shop-floor login with no password yet. After the import, Set temporary passwords gives each new login a temporary password and a printable login sheet (shop ID, username, temporary password); each person chooses their own password the first time they sign in. The administrator can also set each one under Settings > Team. Roles and active are changed on the Team page for a person who already has a login.
  • Areas: each area's code, name, order, capacity in hours a day, rates and the line in the books it posts to.
  • Lines in the books (classes): code, name, parent and description; an accounting role loads this one.
  • Precious metals: symbol, name, unit, base price and the ticker the live price follows.
  • Reject reason codes: code and description.
  • Materials: code, name, family, spec and notes.
  • Vendors: code, name, address, phone, email, terms, expense account and line. Needs: Lines in the books.
  • Inventory items: SKU, name, category, unit, how it comes in, the chemistry figures, opening stock (on a new item only), reorder point, unit cost, vendor, location and SDS link. Needs: Vendors.
  • Equipment and gauges: code, name, type, area, serial, calibration and maintenance intervals, and for an instrument its kind, tolerance and calibration lab. Needs: Areas.
  • Tanks: code, name, function, chemistry, area, volume, temperature and dwell windows, amps per square foot, voltage, rectifier, anodes, filtration, agitation, analysis and dump intervals, the brightener replenished from amp-hours, status, PPE and the operating pH. Needs: Areas, Equipment and gauges, Inventory items.
  • Tank control limits: one row per chemistry parameter of a tank: unit, min, target and max, the action band, the lab method, the testing schedule, what a job start does when it is out, and the correction product. Needs: Tanks, Inventory items.
  • Tank amps per square foot: the stages of a tank that strikes first, each with its amps per square foot and minutes. Needs: Tanks.
  • Tank makeup chemicals: the chemicals and amounts that make up a new bath, by SKU or as a free line. Needs: Tanks, Inventory items.
  • Tank groups with their stations: one row per station, the group's code, name and area on the first row, with each station's tank and its own dwell where it differs from the tank's. Needs: Tanks, Areas.
  • Bath treatments with their steps: one row per step, the treatment's code, name, event, schedule and whether it takes the tank out of service on the first row, with each step's instruction, chemical, amount, duration and reading. Needs: Inventory items.
  • Processes: code, name, kind, spec, metal, revenue account, price and minimum charge, thickness range and the cert statement. Needs: Precious metals.
  • Process steps: one row per step of a process: area, tank, material, instructions, safety, dwell and current, the delay allowed, and for an outside step its vendor, lead days and cost. Needs: Processes, Areas, Tanks, Materials, Vendors.
  • Polishing operations: code, name, standard minutes, order and the reject codes an inspector picks from. Needs: Reject reason codes.
  • Racks and fixtures: code, type, description, capacity, process, condition, recoat dates and location. Needs: Processes.
  • Customers: code, name, addresses, phone, email, terms and credit limit, cert and shipping rules, packaging, industry, sales rep, portal and notification choices, and the tax code. Needs: Employees.
  • Customer contacts: name, title, phone, email and whether primary, per customer. Needs: Customers.
  • Parts: customer, part number and revision, description, material, process, price, thickness range, surface area, weight, packing, metal factor, masking, instructions, pieces per rack and the usual rack. Needs: Customers, Materials, Processes, Racks and fixtures.
  • Parts on racks: more racks for a part, with pieces per rack, notes and which is the usual one. Needs: Parts, Racks and fixtures.
  • Part travelers: one row per traveler item in order: a process, tank, tank group, polishing step or area section, with a tank item's own dwell and current, the pay line and per-piece rate (administrators and managers), inspection after, and reject codes. Needs: Parts, Processes, Tanks, Tank groups with their stations, Polishing operations, Areas, Reject reason codes.
  • Specs and revisions: one row per revision: the spec number, title, issuer, the customer for a customer's own spec, owner, flow-down notes, then the revision, its effective date, what changed and whether withdrawn. Needs: Customers, Employees.
  • Specs on parts, processes and customers: each link with its type or class and the customer's requirements; open jobs are not touched. Needs: Specs and revisions, Parts, Processes, Customers.
  • PM schedule: each PM title, the equipment or tank, interval in days, next due, minutes, who it is assigned to and the checklist. Needs: Equipment and gauges, Tanks, Employees.
  • Training courses: code, title, description, renewal months, the roles that need it, whether it gates work, on-the-job and reminder days.
  • Permits and registrations: name, type, agency, number, issued and expiry dates, renewal lead, reporting frequency, next report and who is responsible. Needs: Employees.

What cannot be imported, and where it goes instead:

  • Files and photos (the Library, part prints, rack photos, controlled documents): add them on each record.
  • Passwords: after an Employees import, Set temporary passwords gives each new login one on a printed login sheet; otherwise the administrator sets each login's password under Settings > Team.
  • Past jobs, shipments, invoices, payments and bills: Finance > Switch from QuickBooks loads opening balances and the chart of accounts, each file previewed row by row and undone while unused (see Switching from QuickBooks); jobs are received fresh.
  • The chart of accounts itself (with its posting keys and expense categories): Switch from QuickBooks.
  • The lab method library: custom methods are written in the Lab.
  • Customer and vendor exemption certificates (reviewed documents): the customer's Sales tax card, the vendor's Payables card.
  • Training links to processes and tanks: the course page.
  • The old polishing pay lines (place start, end, after, routing): the traveler carries pay now.
  • Calibration points and instrument CSV maps: the instrument page.
  • PM meter settings and meter readings: Maintenance > PMs.
  • Tank written procedures: the tank page.
  • Station dwell overrides on a traveler's tank-group item: the part page.
  • A line's items (the old process lines run as one step): Setup > Processes > the line; a traveler carries a run of tanks as a tank group now.
  • Addition-rule products per method line on a control parameter: the tank's lab page (the control-limits file carries the one correction product).
  • Lab results, additions, samples, reagents, instrument runs and tank history (records): the Lab and the tank pages.
  • Quality records (NCRs, CAPAs, deviations, incoming inspections, test results, drawing revisions): raised as they happen.
  • QA test templates and plans (salt spray, adhesion, thickness): Quality > Tests.
  • Training records and the matrix: Quality > Training.
  • Work orders, equipment logs and calibration history: Maintenance.
  • Environmental records (NESHAP, Cr(VI), wastewater, waste containers and manifests): Compliance.
  • Time clock punches, timesheets, work and pay schedules and payroll: Time and Payroll.
  • Bank accounts, statements, checks and reconciliations: Banking.
  • Sales tax codes, agencies and rates: Receivables > Sales tax.
  • Vendor 1099 details and tax IDs: the vendor's Payables and 1099 card.
  • Settings, roles, logins, notifications, messages, tasks, live metal prices and the audit log: the system keeps these.

The same page has a full backup download and CSV and JSON exports.

A 30-minute screen share on your own parts and processes can be booked at any time, onboarding and import help come with the Business plan, and support@amphour.io answers questions on every plan.

Jobs, travelers and routings

A job is a lot of customer parts with a routing copied from the part's own traveler, or from its process. The traveler prints that routing with a barcode per operation (one for a whole tank group or polishing step), the floor logs what actually happened in each tank, and anything outside the window is recorded as a deviation.

Processes and routings

Under Setup > Processes each finish has a code, a name, the specification it is certified to, a default price and unit, a minimum lot charge, a thickness range in mil, in, µin or µm, a revenue account and, for silver and gold, the precious metal that drives the surcharge. Below that is the routing, the ordered steps copied onto every job for the process. A step holds:

Operation, area, tank
What is done, the area of the plant that does it (its column on the Schedule board), and the tank it is done in.
Operating window
Process time and temperature minimum and maximum, current density in A/ft² and typical voltage. A step in a tank can leave them blank, and jobs then take the tank's own dwell, temperature, voltage and amps per square foot, every stage of it, when they are received (see Tank chemistry). A value typed on the step wins. The amps to run come from the A/ft², the surface area of a piece and the pieces.
Must start within
Hours allowed since the previous step: bake within 4 h of plating, dye within 30 minutes of anodize. The job page counts it down (below).
QC step
Cannot be signed off without thickness readings when the job requires them: the part's "Thickness readings required" box, copied to the job when it is received. Jobs that do not need readings pass QC without them.
Outside processing
Done by a vendor, with the vendor, lead time and cost per piece.
Standard labor minutes, work instructions, safety notes
Minutes feed costing and capacity; the text prints on the traveler.

A step with a material and the same sequence number replaces the general step for jobs on that material, so 7075 gets a shorter deox and high-strength steel gets blast instead of pickle without a second process. A process sheet prints per process and material.

A part's own traveler

Most parts differ in some way, so a part carries its own traveler: on the part page, the steps new jobs for the part get, in order. New jobs follow it whatever process is on the job; the part's Process / finish then sets the price, the specification and the certificate wording, and a part with no traveler gets the steps of its process. Under the items are five buttons (two by two on a phone), and each item's menu has Add after this with the same choices:

+ Polishing step
Polishing operations tapped in the order they are done (120 belt, 320 belt, 400 belt), the part's pay per piece and Inspect after. One scan, paid once per piece however many operations it has (see Polishing team).
+ Tank group
A plating line set up on the Tanks page, such as Nickel line: cleaner, rinse, acid, rinse, nickel, rinse. Its stations are one scan on the traveler, started and completed together, each with its own tank and dwell time. Dwell times for this part changes the stations this part runs differently; only the values that differ are kept, shown in bold with "(this part)", and Reset to defaults takes them away. A group that has changed since the traveler was saved says so.
+ Tank
One tank on its own, such as a strip or pickle tank: a dwell time and a step name, and under More settings the temperature, current density (blank runs the tank's amps per square foot, shown in the box as "180 → 140 (from tank)"), voltage, instructions, safety note, standard minutes, how soon it must start after the step before, and whether it is a quality control step.
+ Other process (pickling, wire wheel…)
Any process from Setup > Processes, its steps listed under its name. A process item can be paid by the piece too, a wire wheel say, with Inspect after.
+ Area section
A box for one area from Setup > Areas, such as Polishing or Plating, holding the items worked there: every step they add is worked in that area, so the job sits in that column of the Schedule board, on that area's shop-floor screen, in its capacity and at its labor rate, and the traveler can print by area. A new section starts empty ("No items yet"). On a computer, drag an item by its grip (⠿) into a section, out of it, or to another place, and drag a section by its own grip to move it with its items; on a phone or from the keyboard, ↑ and ↓ move an item one place at a time, a section's edge counting as a place (the first item of a section goes out above it, the item below a section goes into it), and the item's ⋯ menu has Move to: Out of Polishing, Into each other section, or Into a new area section. The same area can head several sections, labelled "Polishing 1 of 2" and "Polishing 2 of 2", as in Polishing, then Plating, then Polishing again. A section folds to one line with its count ("3 items · 9 steps"); its ⋯ menu adds items into it, changes its area, or removes it, and removing a section keeps its items where they are, outside any section, back in their own areas. Items outside sections keep their own areas. Items paid together stay in one section.

A dwell time is typed the way it is said: 5 (at least 5 minutes), 5-7, 30s or 1:30. A single value is a minimum. Each dwell box shows what applies when it is left blank and where that comes from: "5–7 min (from tank)", "(set in Nickel line)", "(this part)". The most specific level wins: the job's own step, then the part, then the tank group, then the tank; a window is always taken whole from one level, never a minimum from one and a maximum from another. Current follows the same rule: left blank, a step runs the tank's amps per square foot, every stage; a level that sets its own A/ft² runs that one value instead.

The traveler for new jobs shows under the items as you build it: a tank group under its name marked "one scan" with each station's dwell, a polishing step with its pay (the amount for office roles) and its inspection, and a footer such as "12 steps · 5 scans". Warnings say what to fix: a window entered backwards, a tank other than a rinse with no dwell time, an inactive group or operation, or a polishing step with no pay ("polishers are paid $0 for this step until a manager sets it"). Changes reach jobs received after the traveler is saved; jobs already in the shop keep their steps. With Area sections the steps show under their area, "Section 1 of 2" when an area repeats.

Old process lines

Before tank groups, a shop strung processes and tanks into a process line, often scanned as one step. Lines are no longer offered when building a traveler or created under Setup > Processes, and nothing that uses one stops working: a part whose traveler holds a line, or whose process is a line, keeps receiving jobs with that line until someone rebuilds it, and jobs already received never change. The part page shows Rebuild this traveler above the items, and the line's card, marked Old process line, has Add in its place: the new item goes directly above the line, which stays until it is removed once its steps are covered. A part with no traveler whose process is a line offers Build traveler from its process, which opens the line into its tanks and processes as separate items ("Zinc rack line was one scan; its tanks are now separate steps. Replace runs of tanks with a tank group.").

Customers > Parts has a Needs rebuild chip listing every part still on a line, and the office sees the count on the dashboard. Under Setup > Processes the Old process lines chip lists the lines themselves; a line's page keeps its builder and lists the parts using it. A line ticked Scan as one step still prints one barcode, and scanning it starts or completes all its steps together.

Receiving a job

Receive job asks for the customer, part, process, material, quantity and weight, then the customer PO, packing list number, lot or heat number, received and due dates (due defaults from the part's recent lead time; see Receiving another lot below) and a priority from P1 hot to P5 low. Customer and part are typed into. The part can come first: typing a part number searches every customer's parts, and picking one, or typing the whole number and moving on, fills in its customer. A customer chosen first narrows the parts to theirs. A number that two customers have from before part numbers were unique lists both and picks neither. Choosing a part fills in its process, material, masking and special instructions, its usual rack (see Customers, parts, quotes and pricing) and the racks used, worked out from the pieces of the part on that rack, else from the part's pieces per rack. Picking another rack or changing the quantity works the racks used out again, until you type your own. Under the Rack field a line says what the count is, "24 pcs per rack on RK-AN-01 · also fits RK-AN-02 (24)", and the part's details show its racking notes ("Racking: Hang by the bore, datum face A up"). Retired racks are not offered. Rework jobs, jobs from a won quote and rework from a customer return take the part's usual rack the same way. Price, minimum charge and thickness tolerance default from the part or the process and can be changed on the job by the office; QC, who see no prices, receive the job at the part's or process's price. When the customer is over its credit limit or has invoices more than 60 days past due, the form says so as soon as the customer is picked, and again after saving; it is a warning, and the job is still received. "Thickness readings required" comes from the part; for a job with no part it is ticked when a thickness range is entered, and it can be unticked. A part with its own traveler needs no process: the field reads "Process (optional)" and the form says "Part traveler: 6 steps, 4 scans". The Process list offers processes only; a part still on an old process line receives it as before, and the form says to rebuild it on the part when you can. A polishing step with no pay is pointed out before the job is saved. A sample part's jobs carry a Sample badge on the job list, the job page and the printed traveler. "Save and print traveler" opens the traveler; "Save and receive another" keeps the form for the next lot.

Two more parts of the form check the parts and the paperwork as they come in (see Quality):

  • Specs this job gets lists the specs from the customer, the part and the process, each with its revision. A customer PO that calls for an older revision picks it here, with the reason it is kept.
  • Incoming inspection, folded until used, records the count against the packing list (the count fills Quantity when it is blank), the condition, contamination, the base material and the hardness or strength class. When it finds a discrepancy, a dialog after saving takes photos and offers to email the customer; the job can go on hold.

The job page

Everything about the lot is on one page: the job information, the routing with each step's tank, window, amps and where its pieces are, thickness readings with a pass or fail against the spec, rejects, labor, chemicals issued, attachments, the shipments, and every cert, invoice, rework job, split lot, NCR and QA test tied to the job. The quantity reads shipped, ready to ship, in process and rejected, with a bar, so a job shipping in parts shows what has gone and what is still to come; the Shipments card marks each one "Partial 1" or "Final 3". Finance roles also see job costing: labor, overhead, chemicals and outside processing against revenue, with a projected margin while steps remain, costed on the pieces each step still has to run.

When someone else has the job open, a banner under the heading names them ("This page is currently being viewed by: Ana Lopez", or "being edited by" while they have its Edit open or unsaved changes on it), and the page shows their changes without reloading; when two people change the same field in Edit, the second save asks first instead of writing over the first (see Getting started).

The heading shows the part's drawing revision as it was when the job was received (the Drawing Revision field on the part); the job keeps it when the part changes later, and a split lot keeps its parent's. The QA tests card lists the tests the part's test plans require, the tests and bakes on the job, and a warning when the part's drawing revision has changed since the job came in. A step with a Must start within limit and pieces waiting carries a countdown, timed from when the oldest waiting piece came off the step before: "Start within 1 h 20 min", changing colour as the window runs out and reading "Late by 25 min" once it has passed. The same countdown is on the Schedule board and the shop floor terminal, and a bake step has Start bake (see Quality).

Quality cards on the job page:

  • ON HOLD: a held job shows a red banner with the reason, where the hold came from (by hand, an incoming inspection, a damage report, a failed QA test), who placed it and when, and Release, which asks why. The Holds card keeps every hold and its release.
  • Incoming and damage: each incoming inspection and damage report with what it found, its photos and whether the customer was told, with Record inspection and Record damage. For high-strength steel it says the parts need a hydrogen relief bake, in red when the job has no bake step.
  • Specs: the job's specs at the revision it was received with, the type or class, the customer's requirements and the flow-down notes. A replaced revision shows a warning with Move to the current one, or Keep with a reason.
  • Deviations: the customer deviations and waivers that cover the job, and its open NCRs with Ask the customer for a deviation.

Actions along the top: Print traveler, Edit, Place on hold with a reason (which prints "ON HOLD. Do not process." and the reason on the traveler), Release hold, Split lot, Open NCR, Issue cert, Ship (also for the finished pieces of a job still in process), Customer return, Cancel and Reopen. Office roles can add, edit or remove operations on one job. A tank group's heading has Dwell times for this job: the part's dwell for each station beside this job's own, for a lot that needs longer in one tank; when some pieces have already run, their records keep the old time. A job received from a traveler with Area sections boxes each section in its routing ("Polishing · Section 1 of 2 · before Nickel line", "2 of 4 complete") with Print Polishing for that area's page. A step keeps its section when its area is changed on the job; the area then sets only its board column.

StatusMeaning
ReceivedNo pieces have started anywhere
In processPieces have started at some step, including a job that has shipped part of its pieces
On holdNothing can start; finished pieces do not ship
CompleteEvery step is done; the finished pieces are ready to ship
ShippedEvery step is done and every finished piece has shipped (or the rest was written off when the job was closed); no longer editable
CancelledClosed without shipping

Status is derived from the steps, not set by hand.

Surface area and amps. Job information shows the area of a piece and what it adds up to: "Surface area 10 in² per piece · 1.67 ft² for the lot · 0.83 ft² per rack". It comes from the part. Edit has Surface area (in² per piece) for a job whose pieces differ, or a job with no part; the box shows the part's value ("from the part: 10 in²"), and left blank the job follows the part. Each plating step lists its amps per square foot with the amps for the pieces in hand: your own portion, else the pieces waiting (a rack at a time), else those in progress, as in "Strike 180 A/ft² 30 s → 150 A, then Plate 140 → 117 A (12 waiting, 0.83 ft²)". A step on an open load adds a line for the load: its jobs, its total ft² and its amps, and this job's pieces and ft² on it. With no area the step says "Set the surface area on part N-1 to see amps."

Racking. Job information has a Racking line: a small photo of how the part goes on (else the rack's own photo), which opens full size; the rack, a link to its page, with the racks used and the pieces per rack, "RK-AN-01 × 3 (24 per rack)"; and "retired" when the rack has been retired since. Under it are the racking notes and the part's other racks ("Also fits: RK-AN-02 (24 per rack)"). The pieces per rack, the ft² per rack and the amps per rack all use the rack's own count for the part, else the part's pieces per rack. In Edit, Racks / loads used follows the rack and the quantity until you type in it ("Follows the rack's pieces per rack; type to change."). A job keeps a rack retired since it was received, but another retired rack cannot be picked.

A job keeps the amps per square foot it was received with, so a reprinted traveler never changes under an operator. When a tank's stages change, the office is asked whether steps that have not started should take the new ones. Edit on a step shows the stages it runs, the tank's current ones when they differ, and Use the tank's amps per square foot; typing one A/ft² on the step runs that one value instead.

Steps worked in portions

A lot does not have to move through the shop in one piece. Any step can start on as many pieces as the step before has passed on as good, without waiting for the whole job. A polisher does 100 of 200; inspection passes those 100; the plating rack holds 30, so 30 go in the tank while 70 wait for the next rack. Several people can work one step at the same time on their own pieces.

  • Start asks how many pieces you are taking (all that are waiting by default). Your clock runs on your portion; the rest stay waiting for someone else. When nothing is waiting but someone is working the step, Join puts your clock on their pieces.
  • Complete my 50 finishes your portion with its good and rejected counts. Fewer than you started go back to waiting; more are taken from what is waiting.
  • A step cannot take more pieces than have reached it. The refusal names the step holding the rest: "Only 100 pieces have reached Polish. 100 are still at Clean (100 waiting). Record them there first."
  • A step is done when every piece that can reach it has gone through it, good or rejected, and the step before it is done.

On the job page each step shows Not started, Partly done or Done, a bar of where its pieces are, the counts ("70 waiting · 30 in tank · 100 done · 2 rejected") and who did them ("Ana 100 done · Ben 60 in progress"), then when ("7:05 AM – 10:50 AM · worked 3 h 20 min", or "since 1:50 PM" while pieces are in progress). The first step's waiting pieces read "not started", an inspection's "93 passed · 5 back to polisher · 2 scrapped", a polishing step's "100 polished · 5 back from inspection · 3 redone · 2 owed — Alma 1, Bert 1", naming who owes the rework, with each reassignment or write-off listed under it (who, when, how many, from whom to whom). Under each step the portions list who started and finished what, when, and how long it took; office roles can Undo a completion (its pieces go back in progress) or Correct a mistyped count, as long as the pieces have not moved on to the next step or shipped. A polishing step shows as one block with its name and is worked from the Polishing page. A tank group, or an old process line scanned as one, shows as one block with its name and one set of Start and Complete; its steps are listed under it with their tanks and windows, each with Log run.

The traveler

The traveler is a one-page form with the shop header, a QR code and Code 39 barcode for the job, and a field grid: customer, PO, packing list, lot, priority, part and revision (and the drawing revision, when the part has one), dates, process and spec, thickness, material, quantity, weight, area and rack (with the ft² a rack holds, "· 0.83 ft²/rack"). Material cautions, masking and special instructions print in a box with the part image. When the job's rack has racking notes or a photo, that box also prints a Racking line ("Racking RK-AN-01 · 24 pcs/rack · Hang by the bore, datum face A up") and one small picture, an inch across at most, captioned "How it goes on" (or "The rack" when there is only the rack's own photo). It prints on every page, by area and in a batch too. Print waits up to 3 seconds for pictures to load, and a picture that cannot be loaded is left out rather than printed as a broken box. The operations table has one row per step with the tank and its chemistry, the parameters (a plating step's amps per square foot reads "180 → 140 A/ft²"), and write-in cells for start, stop, good, reject, operator, date and inspector. Under each row are the instructions, the safety note (or the tank's PPE) and the operation's barcode (50008-30), a QR code and a Code 39 printed with clear white space around them so a phone camera reads the one it is pointed at. Steps scanned together, a tank group, a polishing step or an old process line scanned as one, print one barcode and one set of write-in cells on their first row, marked "(ONE SCAN: OPS 10–30)"; their other steps print the tank, parameters, instructions and safety note in a shaded row with no barcode. Typing the number of any of those steps on the terminal opens the group. Then a grid for thickness readings and signature blocks. Print travelers from Job Orders prints a batch, one after another.

Amps. Every plating step, and every plating station of a tank group (rinses have none), prints a small Amps table: Stage, A/ft², For (how long the stage runs), Amps per rack (when a rack holds fewer pieces than the lot) and Amps for lot, each amps column headed with its pieces and ft². A decorative chrome step reads Strike 180 for 30 s, then Plate 140 for the rest, with the amps for each. The amps are the ft² times the A/ft²: whole amps from 10 A, one decimal below. A job with no surface area prints the stages with "—" for the amps and "Set the surface area on part B-24 to print amps." The table prints the same in the whole traveler, by area and in a batch, on Letter and A4.

Printing by area. The polisher does not need the whole traveler. The traveler page has a Print choice: Whole traveler (the default, printed as always; a job with Area sections shows each area's name above its steps), By area: each section on its own page, By area: repeated areas together (both Polishing sections of Polishing, Plating, Polishing on one page), or Only Polishing and the other areas the job has, with "Its 2 sections on one page" or "Each section on its own page" when that area repeats. The choice counts the pages it makes ("6 pages"). Every page repeats the job header with its barcode and quantities, names its area in a band ("Area: Polishing · Section 2 of 2 · after Nickel line", "Page 2 of 4"), carries the barcodes of its own steps only, and ends with a footer such as "Area: Polishing · page 2 of 4"; the thickness readings and sign-offs print once, on the page with the job's last step. Steps outside sections print by the area of their steps, so jobs received before Area sections existed print by area too. Print travelers offers the same choice for a batch; a job with nothing in the chosen area is left out and named.

Quality on the traveler. The Specification cell prints the job's specs at the revision it was received with ("ASTM B633 rev 19, Type II SC2"), and a revision replaced since then is marked "REPLACED". The customer's requirements and flow-down notes print under the header. A held job prints ON HOLD with the reason. What the incoming inspection found prints for the operator, with the base material and hardness, and so does any approved customer deviation or waiver in effect on the job.

Printed before work starts, the traveler has blank write-in cells. Reprinted later, it shows what has been recorded so far: for each step that has started, the first start and the last stop (blank while pieces are still in progress, with the date when it finished on another day), the good and rejected pieces so far, who worked it and the date, and a Record line under the row with each person's pieces, times and how long they took ("Pete Polisher 60 · 7:05–9:20 AM · 2 h 15 min"). A polishing step lists the pieces sent back from the inspection, how many were redone and how many are still owed; the inspection lists each polisher's pieces passed, sent back to the polisher, scrapped or returned to the customer, so its Rej counts every piece rejected there; an outside step lists each trip, when it was sent and when it came back. Durations read "45 min", "2 h" or "2 h 15 min". Steps not started stay blank to fill in by hand. On screen, a "Where the pieces are" panel above the traveler lists each step's state, its pieces, when it was worked and who has them, with the job's shipped, ready and in-process figures; the panel itself does not print.

Logging runs and deviations

Log run on an operation records a load: tank, load quantity, time, temperature, amps, volts and the amp-hour meter reading (left blank, amp-hours are amps times time). Above the boxes it lists the stages with their amps for the load quantity, which follow the number as it is typed; the Amps label gives the target ("target 63 → 49") and stage 1's amps sit in the box as a hint. A job that ran in a shared load shows the rack's amps and its own part of them: "330 A total, this job 45 % (0.83 ft², 7.5 A·h)". The same fields appear in the Complete dialog if no run has been logged yet. Time or temperature outside the window, or volts more than 25% above the typical voltage, mark the run as a deviation, with the reason stored on the run and shown on the job in red. Amp-hours logged against a tank are added to that tank's count since the last brightener addition. Completing a tank group's step asks for a row per plating tank with a rectifier (time and amps, with temperature and volts under More), checks each against that station's window, and adds the amp-hours to each tank; the rinses and cleaners follow the traveler times unless someone records a dwell for them.

Rejects, rework and split lots

Rejects are recorded when an operation is completed or from the job page: quantity, reason code, the operation they were found at, internal or customer source, and a disposition of strip and replate, scrap, use as is or return to customer. Strip and replate creates a linked rework job at priority P2 with the same part, process, spec and lot number and a zero price. At a polishing step or its inspection the choices are Back to the polisher (the default), Scrap and Return to customer. Back to the polisher records the pieces as rejected at that step's inspection, so the polisher who did them owes them as unpaid rework and is notified, the same as a reject on the Polishing page; no strip job is made. Polisher lists whose pieces are waiting for inspection, and Rework goes to appears when that polisher is no longer active. Pieces that are not waiting for inspection cannot be sent back; the form says so and links to the inspection on the Polishing page. A reject recorded at a step takes those pieces out of that step (what waits there first, then its good pieces the next step has not taken); one recorded without a step is a quality record only and moves no pieces. Split lot moves some pieces to a new job numbered 50008-2 that keeps the routing, the rack and the progress those pieces have made (each lot works out its racks used for its own quantity): they come from where pieces are waiting, or from the finished pieces, to two decimals.

Receiving another lot and promising a due date

Receive another lot on a job opens Receive job with that job's customer and part already chosen (a job with no part brings its process), so a repeat lot needs only its quantity and PO. A production part's page has Receive job for the same. After Save and receive another the message offers Print traveler for the job just saved, or Print 3 travelers for every lot received on the form so far.

Due starts from how long this part's lots have taken lately: the median of its last three finished lots, from received to finished. A part with no finished lot uses its process's last lots, and a process never run uses the Default lead time under Settings > Company (5 days when none is set). A line under the box says where the date came from and how loaded the busiest area of the lot's route is over the next seven days, for example "Last 3 lots took 6, 7, 6 days · Plating at 80% this week", with a link to Capacity. A due date typed by hand stays; changing the received date moves the default with it.

Schedule, capacity and the shop floor

The schedule board shows every open lot in each area of the plant where its pieces are. The shop floor terminal runs a step from a scanned traveler barcode, for all the pieces or a portion of them, and records labor, the run and the counts without anyone touching a keyboard.

Areas

Areas are the parts of the plant work moves through: receiving, polishing, racking, plating, inspection, shipping. They are set up under Setup > Areas with a name, a code, the board order, capacity hours per day, a description and Active, and under Costing (optional) the labor and overhead rates job costing uses. A tank sits in an area and a tank group names the area its line belongs to; every polishing step goes to the one area chosen as the board column for polishing steps (Polishing > Operations). An area that is no longer used is made inactive: it leaves the pickers, and the board shows it only while it still holds work.

The schedule board

Schedule, under Production, draws one lane per area in the order set on the area and places a ticket for each step that holds pieces, waiting or in progress, in that step's lane. A job worked in portions sits in several lanes at once: 70 waiting at Plating and 100 still to polish. A ticket shows the job number and priority, customer code and part number, process code and quantity, the step with its counts and a bar ("30 in tank · 70 waiting"), the due date, and a progress bar of the job's finished pieces. Late lots are red, lots due by tomorrow are amber, and lots on hold are marked. A step that must start within a time limit of the step before (a hydrogen embrittlement relief bake after plating, say) carries its countdown on the ticket. Extra lanes appear when needed: At vendor, for steps whose pieces are out at an outside processor with the vendor and the expected return date; No area; and Ready to ship, which holds each complete job and the finished pieces of a job still in process that can ship now ("40 ready to ship"). A filter box narrows the board to a job number, customer, part or process.

Up to date without reloading. The schedule board, the job, traveler and load lists and the dashboard follow the shop as jobs move: when someone else starts, completes, receives or ships work, the page draws itself again (at most every 10 seconds; the dashboard every 20), keeping your filter and where you had scrolled to. The Shop floor terminal keeps its own cards current within about 5 seconds (active labor, the area's work, the load, add requests and the time clock), shows a job card on screen again when that job changes, and never clears the scan box or what is typed in it. While you are typing, have a dialog open or have changes not saved yet, the page is left alone and a slim bar says what changed ("Updated by Ana Lopez", "New job added by Ana Lopez") with a Refresh or Show button. The Polishing page shows only the bar, so its scan box and timers are never interrupted.

Capacity

Capacity, for office roles, turns the standard labor minutes of open steps into a backlog in hours per area, prorated by the pieces each step still has to run (a step half done counts half), and divides by the area's capacity in hours per day to give days of work. Each row shows the steps with pieces left, how many are already late, and a bar against the busiest center; more than three days of backlog is marked. Daily capacity is edited on the same page. Below is a load table for the next ten days: the hours due by each day per area, with a cell turning red where they exceed the capacity available by then.

The shop floor terminal

Shop floor is made for a tablet or a PC with a barcode scanner at each line. The page is a scan box, a camera button, the time clock, a list of active labor and, when there are any, the steps that must start soon with their countdowns. A scanned step with a time limit shows its countdown large, and a bake step has Start bake (see Quality). Scan the job barcode on the traveler and the terminal shows the job: customer, part, process and spec, quantity and thickness tolerance, then the step you have pieces at, else the first step with pieces waiting. Scan an operation barcode (50008-30) and it opens that step instead; a line scanned as one opens as one step under the line's name, with its tanks listed. The step panel shows how many pieces are waiting, in progress (and whose), done and rejected; when nothing is waiting it says where the pieces are ("Nothing waiting here: 100 still at 10 Polish"). Below it are the tank code and chemistry, the operating window, the amps for each stage for the pieces in hand (your own portion, else the pieces about to go in, up to a rack; never pieces already on a load), every open load the step is on with the load's ft² and amps, the work instructions, the safety note, and any warning: tank out of service (which blocks the start), last analysis out of spec, analysis overdue, a bath treatment due, or the step started past its limit since the previous one.

The rack on the job card. When the job has a rack, or its part has racks linked, the job card has a Rack row (Barrel for a barrel). It shows the photo of how the part goes on, else the rack's own photo, which opens full size when tapped; the rack and its count ("RK-AN-01 · 24 pcs per rack"), with a "retired" badge when the rack has been retired; the racking notes; and the part's other racks ("Other racks for this part: RK-AN-02 (24)"). A job with no rack whose part has racks says "Not set on this job · usual: RK-AN-01 (24 pcs)". When the job's rack is linked to its part, the person racking it adds the photo right there: Take photo (the camera) or Choose photo (a picture already on the phone), or Add photo on a computer. With none yet, the card says "No racking photo yet. Take one so the next person racks it the same way." Operators can remove photos they added, not other people's; administrators, managers, office and QC can remove any. A rack that is not linked to the part gets no photo button: the office links it first, on the part's page or the rack's page.

A terminal can be set to one area: choose it at the top of Shop floor (it is remembered on that device). A Work in card then lists that area's steps with the job, part, step, waiting or in progress, due date and priority, refreshed every minute, after each action and when someone else moves work; tapping a row opens it. A scanned step that belongs to another area still opens, with a line saying which area it is in.

Start
Takes the pieces you enter (all that are waiting by default) as your portion and opens a labor entry for you at your hourly rate (or the area's rate). The rest stay waiting for someone else. An operator is on one clock at a time; starting a new step closes the previous one, and Start again resumes your portion.
Join
When nothing is waiting but someone is working the step, puts your clock on their pieces.
Stop
Closes your labor; your portion stays started.
Readings
On a QC step: thickness readings and the gauge used, recorded against the step and the open load. A QC step of a job that requires readings cannot be completed without them. A gauge overdue for calibration warns, or is refused when the shop blocks it.
Your 50 pcs: Complete
Asks for the good pieces (fewer go back to waiting), rejected pieces, the reason code and notes, and, for a tank step with no run logged yet, the actual time, temperature, amps and volts, with the stages and their amps above the boxes ("Amps (target 150 → 117 A)"). A tank group asks for those per plating tank (time and amps, with temperature and volts under More); rinses and cleaners follow the traveler times, and Record dwell for other tanks takes a time for any of them. Out-of-window values are saved as a deviation. The pieces wait at the next step at once, and the message says what is left ("30 done · 70 waiting"). After the last step the terminal says the job is ready to ship and clears for the next scan. Cancel puts your pieces back to waiting.

A step only takes pieces the step before it has passed on. If someone tries to start or complete more, the terminal says where the rest are: "Only 100 pieces have reached Polish. 100 are still at Clean." There is no override; record the earlier step first.

Quality checks at Start. Before you press Start, the step panel says what the shop's quality checks will say: that you are not qualified on the training linked to this step, or that an instrument on the tank is overdue for calibration. When the shop warns (the default), Start goes ahead and lists the warnings for you to read. When it blocks, Start is refused with what is missing; a supervisor, or a trainer on that course, can start it with a reason, or allow you for the shift under Quality > Training (see Quality).

A job on hold shows "ON HOLD. Do not process." in place of the buttons, with the reason, where the hold came from, who placed it and when; office users can Release hold there, with the reason. Outside-processing steps point the operator to the job page, where the office sends pieces out and receives them back. Polishing steps paid by the piece and their inspections open the Polishing forms instead. The Active labor card lists who is on which job, step and how many pieces right now. When the shop uses Tanks, an Add requests card shows how many chemical additions are waiting for the person signed in or their role, and how many are overdue, with a big button to the queue (see Tank chemistry).

After Complete: the next step, Undo and the run window

The next step and its deadline. When a step or a load is complete, the result card says what was recorded and where the pieces go next, with the step's area and, when it has a time limit, how soon it must start: "Next: 50 Embrittlement relief bake (Bake ovens) — start within 1 h". The line is a link that opens that step on the terminal. A terminal set to an area lists in Start soon the countdowns of its own steps and the ones its own completions started, so the plating line sees the bake it has to hand over.

Undo for a minute. The person who completed a count can take it back for 60 seconds, from the Undo on the completion message or on the result card: the pieces go back in progress for them, and they complete again with the right count. After the minute, office roles see Fix the count, which opens the job page where Correct fixes it; everyone else sees Ask the office to correct, which opens a message to the office with the job and the step filled in. Nobody can undo another person's count from the floor; the office's Undo and Correct on the job page have no time limit.

Figures outside the window. In the Complete dialog and in Complete load, a time or temperature outside the step's window, or amps well away from the target for these pieces, turns its box red. The button then reads what it will record ("Record 20 min as a deviation") and needs a second press, so a typo is caught before it becomes a deviation; figures inside the window are recorded at once.

A step that cannot start. When a tank on the step is out of service or on hold, the card shows the reason and Open job in place of Start, Complete and Add to a load. Pieces already started can still be stopped or put back.

Loads, messages and sounds. A load's warnings (different windows, different amps per square foot) are listed once, on the load card; the message after Add to load only counts them ("50015 added to L1 — 2 warnings on the load card"), and the started-with-warnings dialog shows only what the card does not. Red messages clear after 8 seconds and have a Dismiss button; a refusal or a hold stays until dismissed, and while a dialog is open the messages sit above its buttons. On the Shop floor and Time clock pages every scan answers with a sound and a short vibration where the device has one: a short beep for a code that was found, a low two-tone for a code nobody knows or a start that was refused. On a touch screen the floor's dialogs, the load card, the camera screen and the clock buttons are at least 44 pixels tall, for gloved hands.

A shared terminal: badge and PIN

On a tablet the whole line shares, turn on Terminal at the top of Shop floor. The setting is remembered on that device, and turning it on asks for the terminal's name, for example "Line 2 tablet". The page then says "Who is working: scan your badge" above a badge box and a PIN box. A person scans their badge (or types its number) and their PIN, and from then on what they start, stop, complete, load, reject, measure (thickness readings), ask the lab to test or clock in and out is recorded under their name and the terminal's name, while the browser stays signed in as the account that opened the page. Their labor entries, their portions, their readings and the audit trail name both, and Active labor shows the terminal each person is working at. When the next person scans their badge while someone is signed in, the strip asks for the new person's PIN, and signing in signs the first one out of the terminal; Cancel goes back without signing anyone out. A clock the first person left running keeps running until they stop it. A starting PIN from an administrator is replaced at the first sign-in, and the new PIN is typed twice.

With nobody signed in, Start, Stop, Complete and the clock button do nothing but say "Scan your badge first." and put the cursor in the badge box; a scanner's read goes into the badge box too. On every page of that device the server refuses a start, stop, completion, load, reject, reading, request to the lab or punch while nobody is signed in, so no work is ever recorded under the terminal's own sign-in. After the shop's idle time with nobody touching the screen (2 minutes unless an administrator changes it on the Time clock page) the person is signed out, a dialog still open closes without sending anything, and the page says so. The last seconds show a countdown, and touching the screen keeps them signed in; Sign out ends it at once. Each person sets their own PIN of 4 to 8 digits on the Time clock page. Five wrong PINs in a row lock that badge for 15 minutes, and ten wrong badges or PINs on one terminal pause badge sign-ins there for 15 minutes, as at the login page; an administrator can reset a PIN on the Time clock page.

Supervisor approval. When the shop blocks a start for training or calibration and the person working cannot go ahead themselves, the dialog offers Supervisor approval: a supervisor scans their badge on the same terminal, types their PIN and gives the reason. An instrument that is not calibrated needs an administrator, a manager or QC; missing training also takes a trainer on that course. The dialog says who can approve, and refuses anyone else before anything is approved. The training and calibration logs and the quality gate log record the supervisor as the one who allowed it, while the work stays under the operator's name. One approval answers the one blocked start it was given for, for that operator: another job, another step or the next person signed in needs a new one. A supervisor whose PIN is still a starting PIN from an administrator chooses their own in the dialog first.

When the connection drops. A red bar at the bottom of the screen says "Offline — reconnecting" while the device has no network, and goes away by itself when the connection is back. A code scanned while offline is kept, the page says so, and it opens as soon as the connection returns. A Start, Stop or Complete pressed while offline waits up to 30 seconds for the connection and is then sent once more, as the same request, so the server records it once even when the first try had reached it. If the connection is not back by then, the message says it may not have been saved: once the bar is gone, check the card and press the button again.

Barcode scanning

USB and Bluetooth scanners work in keyboard mode with an Enter suffix, and you do not have to click into a field first: the app recognizes the burst of keystrokes anywhere on the page. On the Shop floor page the scan goes into the terminal, and on the Time clock page into the badge kiosk, where a traveler barcode still opens the job or step rather than punching; elsewhere it opens the record. Phones and tablets use the camera instead, from the button in the top bar and on the terminal, reading the QR and Code 39 codes on travelers, tank sheets, packing slips and labels. Browsers only allow the camera on HTTPS, so a self-hosted server also listens on port 3443 with its own certificate; Setup > Barcode Scanning shows a QR code for that address, a scan tester and printable labels.

ScannedOpens
J50008 or 50008The job, at the step you have pieces at, else the first step with pieces waiting
50008-30Operation 30 of job 50008 (or the whole line, when step 30 is in a line scanned as one). A polishing step opens its run screen on the Polishing page: Start with the pieces filled in, or Complete
A tank codeThe tank page
A tank group code (NI-LINE)On the Shop floor terminal, a load for that line (an empty one is opened if none is); elsewhere, the group's page
A load number (L12, the barcode on a load sheet)On the Shop floor terminal, that load on the load card (a finished one opens its page); elsewhere, the load's page
An inventory SKUThe chemical or item
A shipment, PO or cert numberThat document
An equipment IDThe gauge, rectifier or oven

Labor and job cost

Every Start is a labor entry with the operator, the step, the portion, the start time and the rate. Stop or Complete closes it and computes minutes and cost; completing one person's portion closes only the clocks on that portion. A hold or a cancel closes any open labor on the lot. The job's costing card rolls the entries up by operation against the standard minutes and adds the area's overhead.

Racks

Racks, under Production, lists every rack, barrel and fixture with its photo, how many parts run on it, its type, capacity, condition, next recoat date (red once it has passed) and location. Chips show the racks In use, Retired or All. Each rack keeps its rack ID, type (rack, barrel, basket, fixture, wire or jig), capacity in pieces, a dedicated process, condition, the last recoat or strip date, a recoat interval and the next recoat due. Administrators, managers, office and QC add racks (New rack) and edit them; everyone with Production can open them.

A rack's page ("Rack RK-AN-01", "Barrel BR-ZN-01") keeps the rack's details folded under one line until you click Edit details. Below them:

  • Photos: pictures of the rack, and any other file worth keeping with it, such as a drawing. On a phone, Take photo opens the camera. A good start is one of the whole rack and one of its contacts up close. Operators add photos too.
  • Parts on this rack: every part linked to the rack, with its first racking photo, a "usual rack" badge when this is the part's usual rack, the pieces of that part on the rack ("12 (part's)" when it uses the part's own pieces per rack) and the racking notes. Link a part links the rack to a part from this side. It works like the part page's Link a rack and is there for people who cannot open the parts pages, such as a Shipping and receiving role. Racking photos are added on the part's page or on the shop floor.
  • Recent jobs and Recent loads: the last 20 of each that used the rack.

Retired racks. A rack is retired when Active is unticked or its condition is set to retired. It stays on the parts, jobs and loads it was on, marked "retired", but it is not offered for a new link, at receiving or for a load. Its page says so; tick Active and set the condition back to bring it back. A rack linked to parts cannot be deleted: "Rack RK-AN-01 is linked to 2 parts. Unlink it on those parts' pages, or untick Active to retire it." A rack used on jobs cannot be deleted either; mark it inactive instead. When a rack that nothing uses is deleted, its photos are deleted with it.

Pieces per rack. How many pieces of a part go on a rack is the rack's own count for that part, set on the part's Racks card (see Customers, parts, quotes and pricing), else the part's pieces per rack. That one count gives the racks used at receiving, the ft² and amps per rack on the job page and the traveler, the pieces the terminal offers for one rack, and a load's "By pieces per rack this is 3 racks, not one" warning. A barrel says barrel: "24 pcs per barrel".

Two jobs on one rack: loads

When lots from different jobs or customers go into the tank together, build a load on the terminal instead of starting each job on its own. Scan the first traveler and press Add to a load; scan the next and press Add to load. Each asks how many pieces go on the rack: what is waiting plus any you started, up to the rack's capacity. The load panel on the right lists the jobs with their pieces, what is still waiting, and the share of the run each one carries. The piece count is editable: a rack can take part of a job and the rest waits for a later rack, while other pieces of the same step can be in a second load or worked on their own. Scanning a traveler already in the load adds to its line. Shares are by plated area when every part has one and by pieces otherwise. Jobs that run in a different tank are refused. Jobs whose time or temperature windows differ are allowed with a warning: each job's run is checked against its own window, so one of them may record a deviation. More pieces than the rack holds are allowed with a warning too.

The load's rack. A new load goes on the first job's rack, else its part's usual rack. Add to a load names the job's rack in its help ("on rack RK-AN-01"), and when it starts a new load it says "The load goes on rack RK-AN-01 (this job's). Change it on the load card." A load opened empty from a tank group's label takes the rack of the first traveler added to it. While the load is not done, the load card shows its rack with Change, or "no rack" with Choose: the list offers the racks for the jobs on the load first ("RK-AN-01 · 7740-201 (24 pcs)"), then the other racks, then No rack. A load set to No rack stays without one as more travelers are added. A retired rack is not offered, but a load already on one keeps it.

Square footage and amps. The load card adds up the area of everything on the rack, "1.83 ft² on this load (2 jobs)", shows each job's own ft², and works out the amps for each stage of the tank from that total: "T-CR-1 Strike 180 A/ft² 30 s → 330 A, then Plate 140 → 257 A". The areas are added first and the amps rounded once (whole amps from 10 A, one decimal below); a job that runs its own A/ft² counts at its own, and a warning says so. The area of a piece is the job's own, else its part's. A job with no surface area is never left out quietly: the total reads "— ft² on this load (4 jobs) · 2.83 ft² known", every amps figure reads "—", and the warning names it: "Set the surface area on part B-24 (job 50012): amps and the amp-hour split use pieces until then." While a scanned step is added, the card says what the load becomes with those pieces ("Load L1 becomes 1.83 ft² with these 6 pcs"). Complete load shows the same above the boxes, with the Amps label "target 330 → 257 A" and stage 1's amps as a hint. A barrel load says so: "Pieces in this barrel", "per barrel load".

Start load splits the operator's clock across the jobs by share. It is refused while a job on the rack is on hold ("take it off this load or release the hold"), and it runs the quality checks once for the whole load: the operator's training for the tank or group and for every job's step, and the instruments on the tanks. A load's page lists any held jobs on it and the tank instruments overdue for calibration. Complete load takes one run for the whole rack (time, temperature, amps, volts) and the good and rejected pieces per job; the plated pieces wait at the next step at once, and the message names jobs with pieces still to run. The amp-hours post to the tank once and the tank's event log shows one cycle with every job number; each job's own run record carries its share of the amp-hours and its tank time, so job costing stays right. Counts, rejects, QC readings and completion stay per job. Production > Loads lists every load with its jobs, pieces, ft², amps, amp-hours and result, and the job page marks an operation that ran in a load with its load number. A load's page lists each job's ft², and its Run card the area and the target amps per stage. A completed load keeps the area each job ran with, so changing a part's area later does not change it; an open load re-weighs its shares when an area changes. A load completed by mistake can be undone by the office from its page: the pieces go back in the tank and the run comes off the tank's count. A mistyped count is fixed with Correct on the job page instead.

The load sheet. Print load sheet, on a load's page (Load sheet on the floor's load card), prints one page for the bath operator: the load number as a barcode, the tank or group, the rack and the date; each job with its part, step, pieces, in² each, ft² and share, and the total; an Amps table per plating tank and stage with the target amps and columns to write in the actual amps, time, temperature and initials; then a run row, notes and sign-offs. A finished load prints with its recorded run. Choose Letter or A4 on the page; the choice is remembered on that computer. Scanned on the Shop floor terminal, the sheet's barcode brings the load up on the load card; anywhere else it opens the load's page.

A rack through a tank group

A tank group is racked whole: one load runs the rack through every station of the line. Scan the group's label at the line and the terminal opens a load for it ("Load L-12 for Nickel line: scan the travelers"); with a load of that group already open it says so, and with a load of another group or tank open it asks you to set that one aside first. Then scan the group step on each traveler. The load card reads "Nickel line (NI-LINE) · 6 tanks · rack R-12 · 120 pieces". A job is refused, with a plain sentence saying what to do, when it runs another group or a tank on its own, when it was received with the group as it was before a station changed, or when its part is still on an old process line ("rack it separately, or ask the office to rebuild the part's traveler"). Jobs whose dwell differs at a station (one part's own 15–18 min nickel beside the line's 20–25) are allowed with the warning "Different windows": each job's run is checked against its own window, so one of them may record a deviation. The load card shows the rack's ft² and one amps line per plating tank, each adding up its jobs' areas first at each job's own A/ft².

Complete load lists the plating tanks, those with a rectifier, one row each ("NI-1 Nickel · 20–25 min · target 46 A", or "target 330 → 257 A" for a tank run in stages, stage 1's amps in the box as a hint) with Time and Amps, and Temp and Volts under More; every box is optional. The rinses and cleaners follow the traveler times, and the collapsed Record dwell for other tanks takes a time for any of them, recording a deviation when it falls outside the window. Each job's run is checked against its own window at each station, the amp-hours post once to each tank, and the load page's Run card lists every station with its time, temperature, amps and amp-hours. Undo takes each tank's amp-hours back off.

On a phone, a line tablet and a wall TV

Time in tank. Your running pieces on a step's card, and a running load on its card, show how long the rack has been in against the step's dwell: "In tank 12 min of 40–60 min", ticking. The line turns amber when the minimum is reached, with one beep and buzz on the device, and red once the maximum is passed. A step with only a minimum reads "of at least 5 min"; a tank group's rack reads "On the line", and a step or load with no tank, such as a bake, reads "Running". Anyone else who opens the card, such as a lead or the next person on a shared terminal, sees each person's running pieces with the same clock under the step's counts; it beeps only on the screen of the person running them.

On a phone. Start, Complete and Add to a load stay at the bottom of the screen while a job card is on it, so they are on the first screen. The customer, part and process fold into one line under the job number, a held job's ON HOLD notice comes right under the card's header, and a load being built sits right under the scan box, above the job card. Work in an area names each step's tank and its rack or barrel ("40 Zinc rack plate · tank T-ZN-1 · rack R-12").

Terminal mode. With Terminal on, the floor page also hides the sidebar, the top bar and the banners and makes the scan box and the buttons larger for a wall-mounted tablet; the badge strip stays. Turning it on asks for the area the terminal works in, kept with it on that device. A person signed in on the terminal stays signed in when the page is reloaded, until they sign out or the idle time runs out; the browser keeps only the short-lived sign-in for that tab, never a PIN. Turn Terminal off to use the rest of the app on the device.

The board on a wall TV. TV mode on the Schedule board opens the board for a TV: no sidebar, type 1.6 times larger, only the areas with work, and in each area the late tickets first, then those due by tomorrow. When more areas have work than fit the screen, they take turns every 30 seconds ("Screen 1 of 2"); a lane with more tickets than fit says how many more. Opened from a board showing one area, it shows that area across the whole screen. It updates as the floor moves; Exit or Escape goes back to the board.

Complete load and the sign-off. Complete load meets the same sign-off checks as a step's Complete. A QC line whose thickness readings fail, or a bake step without its bake record, is refused in that job's row, which offers that check's own ways out: rejected pieces, an NCR on the job, an approved deviation, or a supervisor's reason. A check that only warns comes back with the load's warnings. A voided reading does not count as a reading on the load card.

Plant map

The plant map is a drawing of the shop you make from rectangles, circles, lines and labels on a grid, with the real tanks, areas, tank groups, equipment, racks and polishing stations placed on it. On top of the drawing, heat maps colour what the shop records: tank temperature and pH against their limits, SPC signals, amp-hours since the last addition, work in process, who is clocked in where, and, over a date range, rejects, maintenance due, tank utilisation, chromium air sampling and invoiced or spent dollars by area.

Drawing the map

Administrators draw the map under Setup > Plant map; everyone else views it. The paper is a grid of map units (2400 by 1600 by default, with a grid of 20; Map size changes both) and the tools along the left are Select, Pan, Rectangle, Ellipse, Line, Arrow, Wall and Text, with a Safety menu that drops a marker. A rectangle is given a meaning in the Properties panel: a plain rectangle, an office, chemical storage, wastewater treatment, a scrubber, a dock, a door, an aisle, a kiosk or a rack area. Every shape can be dragged, resized with its handles, rotated with the round handle above it and nudged with the arrow keys; shapes snap to the grid unless Alt is held, several are selected with a marquee or Shift-click, and the toolbar aligns and distributes them, duplicates, groups and ungroups, locks, sends them forward or back, and undoes and redoes every step. Copy and paste work within the editor. Each shape has a fill, a stroke and a text colour from the app's palette or any colour you pick, a stroke width, a dash, an opacity, a font size, a corner radius, and a note that the viewer shows when the shape is clicked; an arrow chooses its heads, a wall or line can be closed, a door its swing, and a kiosk shape carries a link to the page the kiosk on the floor shows.

The real records. The map is not just a picture: drag a tank, area, tank group, equipment, rack or polishing station from the Import panel onto the map, or place all the areas and then all the tanks in their areas with two clicks. The panel lists what is not placed yet, section by section, with a search box; Place all unplaced tanks of area puts one area's tanks inside its zone, and Place all racks into the selected rectangle fills a rack room. A placed tank shows its code and name and is coloured by the heat maps; an area, a tank group and a rack area are drawn as zones you grab by their edge or their name, so the tanks inside them stay selectable. An office, chemical storage, wastewater treatment, scrubber or dock can be linked to an equipment record where one exists, and the maintenance heat map colours it. A record stands on one map once: a tank placed on the Annex map is not offered on the Plant map, and the panel says where it is. Rack storage is drawn as a rack area: a rack area on the map counts the racks whose location is its name, and the viewer lists them. Safety fixtures are placed from the Safety menu: eyewash stations, showers, extinguishers, spill kits, exits and first-aid kits are markers of their own.

Layers and maps. Shapes sit on layers (Walls & doors, Areas & lines, Tanks & equipment and Notes to begin with, plus any you add), each with an eye to hide it and a lock to keep its shapes still; the layer you draw on is picked in the Layers panel. A shop can have several maps, shown as tabs: one per building or floor; most shops have one. New map, Rename, Move up and down and Delete are on the Plant map list; the last map cannot be deleted, and a map holds at most 2,000 shapes.

Saving. Save (Ctrl+S) writes the whole map at once, and the page asks before you leave with unsaved changes. The editor is a live page: it shows who else has it open, and when two administrators edit the same map, the second save is refused with the name of the first and a choice: reload, or save over. A bar also says "Ana Lopez saved this map" with Reload the moment someone else saves it. The editor needs a screen at least 900 px wide; narrower than that it offers the viewer instead.

In the editorKeys
Select toolVclick a shape; Shift+click toggles; click empty paper clears; a zone is grabbed by its edge or its name
Clear selection / cancelEsc
Select allCtrl+A
Next / previous shapeTab Shift+TabEnter selects the shape under focus
Movedragsnaps unless Alt is held
Nudge one grid / five grids / one unit←↑→↓ Shift+←↑→↓ Alt+←↑→↓
Resizedrag a handleShift keeps the ratio; snaps unless Alt
Rotatedrag the round handleShift snaps to 15°
Snap to gridG
Show gridCtrl+'
Align / distributebuttonsthe Align menu; no chord
DuplicateCtrl+D
Copy / Cut / PasteCtrl+C Ctrl+X Ctrl+Vpasted at the pointer, each repeat one grid further; a cut shape keeps its record link, a copy of a tank or other linked shape becomes a plain rectangle with its words (a record stands once on the map)
DeleteDelete Backspace
Group / UngroupCtrl+G Ctrl+Shift+G
Bring forward / send backwardCtrl+↑ Ctrl+↓
Bring to front / send to backCtrl+Shift+↑ Ctrl+Shift+↓
Lock / unlockCtrl+L
Draw rectangle / ellipseR Ethen drag, or click for the default size
Draw line / arrow / wallL A Wclick points; Shift constrains to 0/45/90°; double-click or Enter ends; Shift+Enter closes; Esc cancels
TextT
Pan toolH Spacehold Space to pan while another tool is on
Zoom in / out / fit / 100%+ - 0 Ctrl+0the wheel zooms about the pointer
Undo / RedoCtrl+Z Ctrl+Shift+Z Ctrl+Y
SaveCtrl+S
This list?⌘ counts as Ctrl on a Mac

Viewing the map

Map, under Production, shows the drawing to every staff role, with tabs when the shop has more than one map. The bar above it has two pickers, Colour and Badge, each listing the live heat maps and then the period ones: two heat maps at once: one as colour, one as a number badge; with both on, the colour's number stays on the shape. Pick Tank temperature for colour and Work in process for the badge and each tank shows its temperature in its colour with the pieces at it beside. The legend is always shown; every colour also carries a number or a symbol: ▲ above the limit, ▼ below it, ! hot, ~ older than its test interval; a tank the shop does not test for a heat map stays plain. The legend names what each colour means, the range of each step, what counts as hot (hot shapes are hatched), and the small print of the heat map: how many tanks are not tested for it, who is clocked in but not on a step, the period. Click a shape and a card says what it is, what each heat map says about it and why, the people on it with how long they have been there, the jobs with their quantities and due dates, the racks in a rack area, the drawer's note, and a link: a tank opens its tank page, an area its jobs on the schedule board, a person their timecard, equipment its page.

Now, or over a period, or replayed. Live heat maps update as the shop works, through the same live connection the other pages use; a wall screen refreshes itself every five minutes as well, and says so in large type when it has stopped updating. The page says when its numbers are from ("as of 10:42"). Period heat maps take a date range, the last 30 days unless you change it, at most a year. A heat map marked Playback in the table below can replay one day with a slider, Play and a speed, in frames of 5 to 60 minutes: pick the day, press Play and watch the pieces move and the people come and go; the frame time shows in the bar, the slider scrubs, and Live goes back to now. The badge keeps its own playback when it has one, else its live value with "(now)" in the legend.

Kiosk. Kiosk opens the map full screen for a wall TV, with larger type, strong colours, no sidebar, and a clock; it zooms through the areas in turn, or stays on whatever is hot. The address carries the heat maps, the period, the day and the view (cycle, hot or the whole map), and can name several pairs of heat maps to rotate between every half minute, so one bookmark on the TV's browser brings the screen back after a restart. A playback day on the kiosk plays by itself and loops. A clicked shape shows its card for 20 seconds without links; Fullscreen is a button, since browsers only go full screen on a click; Esc leaves full screen, then the kiosk.

Layers, strong colours, print and export. The Layers menu hides any layer of the drawing, and Strong colours switches to the saturated palette the kiosk always uses, for a bright room or a projector; dark mode has its own shades of the same colours. Print puts the whole map on one landscape page with the legend below it. Export PNG saves the map as a picture named after the map and the date, with the legend drawn in, at twice the map's size up to 8,192 pixels on the longest side, ready for a slide, an email or a notice board. The address keeps the heat maps, the period, the day, the layers and the zoom, so a bookmark or a link pasted in a message opens the same picture.

Phone. On a phone the map pans and zooms with one finger and a pinch; it is view-only there. A double tap fits the whole map, Colour and Badge stay on top with the rest of the bar behind ⋯, Legend opens the legend as a sheet, and a tapped shape's card slides up from the bottom; the page itself never scrolls.

The heat maps

Fourteen heat maps, each reading records the other pages keep. The colour of a shape is chosen one of three ways. A heat map against limits (temperature, pH) is green within them, amber within 5% of the span of a limit, red outside; a tank with no limits set keeps its number and stays plain. A status heat map (SPC signals, amp-hours, maintenance, Cr(VI)) gives each colour a fixed meaning, written in the legend. A count or an amount shades from light to dark in five steps: for work in process, rejects and the dollar heat maps the darkest step starts at the 90th percentile of the places that have anything, so one very busy place does not wash out the rest, and work in process scales areas and tanks apart; people and tank utilisation use fixed bands (1, 2–3, 4–6, 7 or more; quarters of the capacity). Every colour carries its number, so nobody has to judge a shade, and a shape that is hot is hatched as well.

Heat mapWhenWhat it showsWhere the numbers come fromHot
Tank temperatureLive, playbackThe latest bath temperature of each tank against its limits, in the tank's unitThe lab's Temperature line, or the last run logged on the tank, whichever is newer; limits from the Temperature line's control plan, else the tank's operating windowout of its limits
Tank pHLive, playbackThe latest pH test of each tank against its pH line's limitsThe tank's pH line (the operating pH on the tank form), from tank testsout of its limits
SPC signals openLiveOpen SPC signals on each charted tank: none green, one amber, two or more redSPC signals on the tank's parameters; a tank with no chart is not colouredan open SPC signal
Amp-hours since additionLiveAmp-hours run through each rectified tank since its last brightener or additive, and what that asks to add; a requested add shows amberThe tank's amp-hour counter, its additive and rate per 1,000 A·h, and open add requestsa whole unit of additive is due
Work in processLive, playbackPieces waiting and in progress at each area and tank, with the jobs they belong toThe steps of open jobs, from step tracking, and the loads on themholds pieces of a late job
People clocked inLive, playbackWho is clocked in, placed on the area and tank of the step they are workingTime clock punches and the labor entries opened by Start on the floornever (the busiest place is not a fault)
RejectsPeriod, playbackRejected pieces in the period by the step they were found at: its area, tank or polishing operation. Rejects found at a polishing inspection count on the step's first operation.Rejects recorded on the job, at completion or by QCnever (the busiest place is not a fault)
Maintenance duePeriodEquipment and tanks due or overdue for maintenance, calibration or a dump, and open work orders, as of the end of the period: due within 14 days or with an open work order amber; retired equipment plainEach asset's next PM and calibration dates, its PM templates by calendar or meter, a tank's next dump and the open work ordersoverdue, or out of service
Tank utilisationPeriod, playbackLogged dwell minutes per tank as a share of its area's working hours over the weekdays of the period; over capacity redRuns and loads completed in the period; the area's capacity hours per day (8 when none is set)90% of capacity or more
Cr(VI) air samplingPeriodThe worst hexavalent chromium air sample per area in the period, banded against the action level and the PELThe Cr(VI) exposure records, matched to an area by the code or name typed on the sample; areas that match nothing are listed in the legendabove the PEL
Invoiced by areaPeriodInvoiced amounts in the period, each job's split evenly across the areas its steps ran inInvoice lines with a job on them, by invoice datenever (the busiest place is not a fault)
Labor cost by areaPeriodLabor cost and hours clocked on each area's steps in the periodLabor entries started in the period, on the area of their stepnever (the busiest place is not a fault)
Chemistry cost by tankPeriodThe cost of chemical additions to each tank in the periodTank additions at their recorded unit costnever (the busiest place is not a fault)
Bake tests runningLiveThe bake adhesion tests in each oven (equipment of the type oven): the minutes left, the time up and waiting for the inspector, or no result within the grace timeThe bake tests started on the QA tests pages, the floor card or the job page, and the Bake tests settings (the grace time)the time is up and no result came within the grace time

Tank temperature and pH come from the latest lab result, or, for temperature, the latest run logged on the tank, whichever is newer; a reading older than the tank's test interval (at least a day) shows as stale and keeps its last colour. Work in process counts the pieces waiting at and being worked at each area and tank, from step tracking; jobs received before step tracking are not counted. An area or tank is hot when it holds pieces of a late job. Playback shows pieces being worked, not pieces waiting. Tank utilisation counts the weekdays in the period as capacity. Invoiced by area splits each job's invoiced amount evenly across the areas its steps ran in. Dollar heat maps are for the roles that see prices and costs; other roles do not see them in the list. Cr(VI) air sampling is for administrators and managers.

Playback, frame by frame. A frame holds the state at its start minute on the shop's clock. Temperature and pH begin the day at the last reading before it and step at each test or run; work in process adds a portion's pieces when it starts and takes them off when it completes; people come from the punches and labor entries that overlap the frame; rejects add up through the day; tank utilisation shows a tank running for the dwell of each run that ended that day and counts the runs so far.

What the map is not

The map is schematic: no real dimensions, no scale, no background drawing or photo, no CAD import, no 3D. Shapes mean what you say they mean. Heat maps show only what the app records: a tank with no temperature in its tests or runs has no colour, and a shop that does not clock labor to steps has no people on the map. Playback replays the records of a day, not a video of the floor.

Nothing on the map changes a record: deleting a tank's shape removes it from the drawing only. A tank or piece of equipment deleted elsewhere keeps its shape, marked as a record that no longer exists, until an administrator unlinks or deletes it; a retired one keeps its place and shows its status.

Who sees it

  • Administrators draw the map (Setup > Plant map) and see every heat map.
  • Every staff role views it under Production > Map, with the heat maps its role may read: a heat map that reads the lab needs Tanks, people needs Time or Production, rejects needs Quality or Production, maintenance needs Maintenance, and so on; roles that do not see prices and costs do not see the dollar heat maps in the list, and Cr(VI) air sampling is for administrators and managers.
  • Custom roles see the map when their role includes Production.
  • The customer portal never shows it.

Polishing team

For shops that polish and buff before they plate and pay polishers by the piece. Each part's traveler holds its polishing steps, each one a run of operations paid once per piece. A polisher scans the step on the traveler, the Start screen opens with the pieces filled in, and scanning again completes them; pay is the rate times the pieces completed. An inspector counts each polisher's pieces apart, with the reason and a photo for every reject; rejected pieces go back to the same polisher to redo without being paid twice. It is the Polishing page under Production, switched on and off like any module.

Operations

Polishing > Operations, a tab the office sees and polishers do not, is the shop's list of polishing operations: 120 belt, 320 belt, 400 belt, sisal buff, copper buff, color buff. Each has a name and the instructions that print on the traveler; under More, a code (made from the name when left blank), standard minutes for capacity and the default reject codes its inspection offers. Add the usual ones fills an empty list with eight common operations. An operation on a part's traveler cannot be deleted; untick Active to retire it. Renaming one changes new jobs only: each job step keeps the name and instructions it was received with.

The same tab has Board column for polishing steps: the area (Polishing, say) whose Schedule board column and shop-floor area screen every polishing step goes to.

Polishing steps on the part's traveler

On the part page, + Polishing step opens one dialog:

The operations
Tap them in the order they are done; each tap adds a number, tapping again takes it out. On the step's card each operation can be moved up or down or removed, and + Add operation appends more.
Pay per piece
One of this part's pay rates ("Polishing – $1.80"), or No pay yet. Paid once per piece for the whole step, however many operations: 3 belts on 100 pieces at $1.80 pay $180. Administrators and managers also get + New pay… to add a rate on the spot (a name and the dollars per piece).
Inspect after
Ticked by default: an inspection step right after the polishing step, with its own barcode. Its reject codes start as the operations' default codes; none ticked means every code applies.
Name
What polishers see. It defaults to the pay's name; a second step on the same pay becomes "Polishing 2".

The step is one scan: the polisher starts and completes it once, and the traveler prints its operations under its name. A part may have several, for example "Polishing" on the belts before plating and "Copper buff" before nickel; each step is paid on its own, even when two pick the same pay.

Pay per piece is per part: a strip above the items reads "Polishing pay per piece: Polishing $1.80 · Copper buff $0.90", and Edit opens the list, where a rate a step uses shows "used by step 30" and cannot be removed. Pay is set by administrators and managers; the rest of the office picks one of the part's rates for a new step, or for a step no open job uses, and sees the amounts read-only. Anyone outside the office who may read the traveler sees the names without amounts. A changed amount is paid on jobs received from then on; jobs already in the shop keep the rate they were received with, so piece pay, reports and payroll for them do not move.

A step with no pay is shown in red ("No pay set: polishers are paid $0 for this step until a manager sets it"); an office user who saves one is reminded to ask a manager, the part appears under the Needs pay chip in Customers > Parts, and the dashboard counts such parts for the office. Receiving a job of the part warns of it too.

An ordinary process on the traveler (a wire wheel, say) can also be paid by the piece, with Inspect after. A process item set up before polishing steps that is "paid with the item above" keeps it, and can be unticked. Tanks and tank groups are plating and never paid by the piece. A part's pay set up as item pay before pay rates existed was turned into the part's pay rates at the upgrade, with every amount, name and job kept.

A part set up before travelers works as it did. Its form offers "Build traveler from its process", or "Build traveler from its pay lines" when it has no process: the draft puts the part's existing pay on the matching items, and saving it retires the old pay lines.

Start and Complete

Scanning a polishing step (in the Polishing scan box, with the camera in the top bar, with a USB or Bluetooth scanner on any page, or at the shop-floor terminal) opens its run screen: Start with the pieces filled in, or Complete when the polisher has a run open. It shows the job, the polishing step with its operations and pay, the pieces waiting, in progress and done, who has them, and any rework the polisher owes. The traveler prints one barcode for the step, on its first operation; the number of any other operation of the step, typed in, opens the whole step too.

  • Start takes a quantity: the polisher's assigned pieces still to do, else everything waiting, or fewer. Two polishers can split a job, each starting their own pieces. Pieces that have not reached the step yet cannot be started: "Only 100 have reached this step; 100 are still at Clean". The step before records them first. A held job cannot be started, and when the shop checks training at step start, the polisher's training on the step's polishing operations is checked as the run starts (see Quality).
  • The run shows when it started and its running time, with Stop clock for a break (the run stays open), Take more when more pieces are waiting, and Cancel run, which puts the pieces back.
  • Complete asks only for the pieces completed, which may differ from the start (rejects are the inspector's, at the inspection step): started 50, finished 48, and the other 2 go back to waiting for someone else. The time between Start and Complete is recorded on the run. A count beyond everything the job can still bring to the step asks to double-check; if it is right, it is completed anyway and flagged on the person's page, the timesheet and the reports.

My work also lists the day's assignments from the schedule, the polisher's open runs and today's runs with their start, finish, minutes and pieces. A person can delete their own run within a day, and a timecard role any run, until inspection has counted the pieces.

Rework you owe sits at the top of My work for every polisher, whether or not the job is on the schedule: each job and polishing step with pieces sent back, how many to redo, the reject codes and who sent them back ("3 to redo · Rim polish · BURN 2, PIT 1 · Sent back by Ivy"). Open goes to the step, where Start takes the rework first. The Polishing menu entry and the My work tab show how many pieces are waiting to be redone, and the polisher gets a notification each time an inspection, or a supervisor, sends rework to them.

A traveler barcode works from the Time Clock page too: the job barcode (J50001) or a step barcode opens the job or step as on the shop floor (a polisher's own step or owed rework first), and is never punched as a badge.

Inspection

The Inspection tab lists the inspection steps with pieces waiting, oldest first, with whose pieces they are. The inspector scans the step or picks it from the list and records, for each polisher whose pieces are waiting:

  • The pieces passed. Partial counts are fine: count what was looked at now and the rest later. Passed pieces are waiting at the next step at once.
  • Reject lines, each with a reason from the step's codes, a quantity and what happens to the pieces: back to the polisher (the default), scrap, or return to the customer.
  • For pieces with no polisher recorded (converted from before polishing steps), or polished by someone no longer active, Rework goes to: any active polisher. The pieces stay counted against whoever did them; only the redo goes to the person chosen.
  • A note, and photos once it is saved: several, straight from a phone camera.

Each polisher's block says when their oldest waiting piece was polished, and marks redone pieces ("12 to inspect · includes 2 redone", or "all redone" with the redo time) so the defect is checked again. Two inspectors can split a large batch: Claim pieces reserves part of it for one of them. Every reject is recorded as a standard reject with its reason, so the rejects report and the reject rate count it. A wrong record is corrected by deleting it: the inspector who recorded it, a polishing supervisor or the office. Deleting is refused once its passed pieces have moved on or its rework has been redone. Thickness readings are not asked for here; they are taken at the QC step after plating.

The rework rule

Pieces sent back to the polisher are owed by that polisher: their next run on the step starts with them, they are not paid again, and they are inspected again. The polishing step, and every step after it, finishes only when nothing is owed. When a piece cannot be saved or the polisher is away, an administrator, a manager, the office or a polishing supervisor can, from the step's screen or the polisher's page:

Write off
Scrap the owed pieces, or return them to the customer, with a reason. No pay, no redo.
Reassign
Hand them to another active polisher, who redoes them unpaid and is told; once inspected again they count as that polisher's.

The polishing inspector records inspections but does not move rework. To let an inspector reassign or write off rework, tick Polishing supervisor for them. Every reassignment and write-off is kept on the step: who, when, how many, from whom to whom.

The schedule and the polishing supervisor

The Schedule tab is a week: one row per polisher, one column per day, with each assignment as a chip showing the job, the part, the polishing step, the pieces and how many the polisher has completed. Assign picks the day, a job's polishing step from the open ones with the pieces waiting and the due date, and one or more polishers, each with a quantity, so a job can be split between two. An assignment can be moved to another day or person, marked done or removed, and each day prints as a list for the bench. A polisher's own chip opens the step's Start screen in My work.

Building the schedule is for a polishing supervisor: a flag any staff member can carry, set under Settings > Team or from the Polishing team page by an administrator or manager. A polisher with the flag assigns their own work. Everyone else sees their own assignments.

Pay modes

People in the roles paid as polishers (the Polisher role, plus any role ticked under Settings > Team > Time & pay) have a pay mode. Everyone else is paid hourly, and their pieces are still counted.

ModeWhat the timesheet shows
Hourly (the default)Hourly pay. The pieces are counted for the reports and their value is shown, not added.
PiecePiece pay instead of hourly pay. Hours are still tracked.
Hourly + pieceHourly pay plus the piece pay for the period.
AveragedThe piece pay, shown as an effective hourly rate: the period's piece pay divided by the hours worked.

Overtime and the minimum wage apply in every mode, worked out on the whole workweek: the regular rate is the week's hourly and piece pay divided by all its hours, each hour over the overtime threshold (40 by default) adds half that rate, and a week that pays less than the minimum wage an hour is topped up to it. 50 hours that earned $600 in pieces is $12 an hour, so the 10 hours over 40 add $60 and the week pays $660. Timesheets show the straight time, the overtime premium and the top-up apart (see Invoicing, receivables, ledger and time).

Administrators set the modes, and so do the roles ticked under "Who can set polisher pay modes". Timesheets carry Pieces and Piece pay columns, the printed timecard a piece line, and the financial export's payroll files the pieces, the piece pay owed under each person's mode and the mode itself.

The team and each person

The Team tab has a card per polisher and inspector: today's pieces, rework and pieces in open runs, the reject rate over 30 days with a colour cue, today's assignments, the rework owed now (pieces to redo and in a run, with the jobs) and whether they are clocked in. Someone no longer active stays on the tab while they owe rework, so it can be reassigned. A person's page takes a range (today, this week, last week or custom) and shows hours, pieces, rework, rejects and reject rate and the pay their mode gives, the rework they owe now by job (with Reassign and Write off for those allowed), then the pieces by polishing step and by day, every run with its start, finish, minutes and over-count flag, rework written off or reassigned, and the inspections of their pieces with the reasons. It links to the timecard and prints.

Roles

The first time the module is used, two custom roles appear under Settings > Team, editable like any other: Polisher (operator level: the Polishing page, the time clock and timesheet, plus the tasks and messages every role has) and Polishing inspector (QC level, with Polishing, Quality and the time clock). Pay figures are shown to administrators and managers, and to each person for themselves.

Coming from earlier versions

Shops that set up per-piece rates under Setup before pay lived on the part keep their figures: at that upgrade every part rate became pay on that part (with the operation's process, Inspect after and reject codes), a part that used a default rate got pay at that rate, people who were paid by the piece moved to Hourly + piece and everyone else to Hourly. Later, the pay on each part's traveler became the part's pay per piece, the same names and amounts. Jobs already in the shop keep working at their old rates through both.

Tank chemistry

Each tank carries its volume, the chemicals that make up a new bath, its amps per square foot, its operating window and the chemistry limits you analyze against. Enter the titration on the tank's test screen and the method's formula works the result out as you type, with the work shown; what to add follows from the method's rule and the tank volume, in each chemical's own unit, and goes to a person or a role as an add request that they confirm from a phone, taking it out of inventory. Brightener is replenished from the amp-hours the floor logs. Tanks run in tank groups, one barcode per plating line, and bath treatments run from a checklist on a schedule.

Setting up a tank

New tank, under Tanks, records what the bath is and how it is run, in this order:

Identity
Tank ID, name and function (cleaner, etch / deox, pickle / activate, strike, plate, anodize, seal, passivate, rinse and so on).
Chemistry and makeup
Right under the name: the bath's name (Chemistry, such as "Watts nickel"), its working volume in gallons or liters, and the makeup chemicals: the chemicals a full tank takes, picked from Chemical inventory. Each line names a stock item (or a description for water and anything not stocked), an amount, a unit and instructions; Add makeup chemical adds another, and a chemical can sit on several lines (a staged addition). Units are mass (lb, oz, kg, g), volume (gal, qt, L, mL) or a concentration: g/L, oz/gal, % v/v, % w/v, lb/100 gal or kg/1000 L. A concentration is scaled to the working volume as you type, so "185 g/L" of an 800 gal tank shows as 560 kg, and the total is converted into the item's own unit with the stock on hand beside it. A line is flagged when there is not enough on hand (counting every line of the same chemical), when the volume is missing, or when stock can't take it in that unit (see below). A new tank can be ticked Made up today from inventory: after Save its makeup comes out of stock and the bath age starts that day.
Where it sits, temperature and equipment
The area it sits in and its location, the operating window in °F or °C, the rectifier from the equipment list, the anodes, filtration and agitation.
Operating pH
Right after the temperature (on the quick New tank form too): pH min, target and max, left blank for a tank without pH. They are the tank's pH line under Control parameters (the limits the lab tests pH against), so a change on either shows on the other. They show beside the temperature on the tank page and the tank sheet, job travelers, the shop floor's steps and loads, and process sheets. Clearing them takes the tank's pH line off; a line with test results keeps them, with no limits and no test schedule.
Schedules
Analysis interval in days and the next analysis due; last makeup, a dump interval and the next dump due (worked out from the last makeup and the interval when left blank).
Bath life
Besides the dump interval in days, a bath can be dumped at a number of metal turnovers (MTO, for electroless nickel, counted from the nickel additions) and at a number of amp-hours per gallon of working volume (amp-hours since the makeup, divided by the gallons; a tank kept in liters is converted). The bath is due for a dump at whichever limit it reaches first. The tank page's strip shows how far along that limit is ("4.2 of 6 MTO", with the others beside it), and the next dump due is worked out from it: the day a counter limit was reached, or the day it will be reached at the rate the bath has run since its makeup. Make up new bath, the dashboard and the tank lists follow that date. A Metal turnovers line under Control parameters shows the count and is never typed or due as a test, on the tank page, the lab page or the test screen; its maximum became the tank's MTO limit. A dump date typed on a tank before its bath life was set is kept: it stays the dump date while it comes first, until the next makeup.
Amp-hour replenishment
The additive from inventory and how much of it is consumed per 1,000 amp-hours.
Status and safety
In service, out of service or dumped; the PPE text, which prints on travelers and the tank sheet.
Default step settings
The dwell time travelers and tank groups use unless they set their own (typed as 5, 5-7, 30s or 1:30; a single value is a minimum), the voltage, and the amps per square foot (below). The form says how many group stations and traveler steps have no dwell of their own and follow this default. A change reaches jobs received after it is saved.

A tank added from the New… button beside a tank dropdown (a process step, a work order) gets the short form; once saved, a message links to its Makeup tab to add the chemicals.

Amps per square foot

A plating tank's current is set as amps per square foot (A/ft²), in stages when the bath runs at more than one setting: decorative chrome strikes at 180 A/ft² for 30 seconds, then plates at 140 A/ft² for the rest of the dwell. Each stage has a name (Strike, Plate), its A/ft², how long it runs (typed like a dwell: 30s, 2, 1:30; the last stage may run for the rest of the dwell) and a note; up to ten stages, in order. The amps to run are the parts' area in ft² times the A/ft²: the job traveler prints a small Amps table for every plating step, per stage, for the lot and per rack, and the floor's load card adds up the area of every job on the rack. The tank's Details tab, its Chemistry tab and the tank sheet list the stages; a tank group's stations show them ("180 → 140 A/ft² (from tank)"). A group station, a part's traveler or a job step can still set its own single A/ft², which then runs instead.

Jobs keep the amps per square foot they were received with. When you change a tank's stages and open jobs have steps in that tank that have not started, the form lists them, all ticked, and asks whether they should use the new amps per square foot too; untick any that should keep theirs.

Tank groups

A tank group is a plating line as the rack sees it: the tanks it runs through, in order, with one barcode. "Nickel line" is cleaner, rinse, acid, rinse, nickel, rinse. A tank can be in several groups, and more than once in one group: a shared rinse used before and after the acid is two stations. New tank group, on the Tanks page, takes a name, a code (made from the name when left blank; it is the barcode, so no tank or piece of equipment may have it), the area whose Schedule board column the line is, notes and Active. Each station is a card with its tank and its dwell time (blank follows the tank's default, shown in the box), and under More the step name, temperature, its own amps per square foot (blank runs the tank's stages), voltage, standard minutes, how soon the first station must start, instructions and the safety note. Add station adds another; warnings point out a window entered backwards and a tank other than a rinse with no dwell time.

The group's page lists the part travelers that use it, and a saved change says how many parts' new jobs follow it; jobs already received keep the stations they were received with. Print label prints the code as a barcode and a QR code with the group's name for the line's post: scanned on the shop floor terminal it opens a load for that line (see the shop floor). A group on a traveler cannot be deleted; untick Active to retire it.

The Tanks page opens By group: a card per group with its stations in order (tank, name, chemistry, dwell, status, next analysis and treatments due; on a phone each tank with its dwell and the one thing that needs attention, a tank used twice listed once as "steps 2 and 4"), then Ungrouped for the tanks in no group. All tanks is the plain list with each tank's area and groups. A tank page lists the process steps, groups (with its positions) and old process lines that use it, with Add to a group… to append it as a new station.

The lab

Lab > Lab home is the lab's worklist: every tank test that is overdue, due now or never tested, grouped by tank with Test all for the tank; the results out of spec, with What to add; the add requests still open; and the re-tests due after an addition. Each test has its own schedule (every few days, every few hours in service, once a shift, every so many amp-hours, metal turnovers or operating hours, before each use, as needed, or the tank's analysis interval), so testing the pH does not move the nickel's due date. A test that stays overdue tells the lab, then the person the shop names (Lab settings). Lab home also lists the tests that broke an SPC rule (Look into it), the bottles to standardize or replace and the instrument checks not done today; tick tanks and Print labels prints a sample label for each (a barcode with the tank, the time and the tests), and scanning a label opens the test screen for that sample. The chips at the top filter it by area. A tank's lab page (Lab page, on the tank) lists its tests with the last value, the limits and when each is next due, What to add, its open add requests, Work out an addition and its supplier lab reports.

A tank's lab page also shows its counters (amp-hours, metal turnovers since the make-up, operating hours; Set reading takes a figure read elsewhere) and, when a test is set to gate job starts, whether a step starting in the tank would be warned or blocked. Lab settings (office and lab technicians) holds the profile, Basic or Controlled, and each of its choices: what an expired bottle or a missed instrument check does, the witness on additions, the shift start times, who is told about overdue tests and who after that, the default SPC rules and the AA / ICP figures. Every figure there is a starting point to check against your own procedures. Two checks from Settings > Quality also run when a result is entered: the person's training on the test method, and the calibration of the instrument used. Each warns by default, or blocks when the shop chooses (see Quality).

Every shop gets a Lab technician role (Settings > Team): it records tests, sends add requests, edits test methods and tank test set-ups, and sees chemical stock but no prices or costs. Operators can record tests and do add requests too.

Test methods

A test method is how a parameter is measured and worked out: its procedure steps and safety note, the readings (the sample pipetted, the titrant used, the titrant's actual strength, a dilution), constants such as an equivalent weight, the formula, its other results (% activity, the same value in oz/gal) and the rule for what to add. Amp-Hour ships a library of 136 methods: titrations for nickel, electroless nickel, copper, zinc, chrome, anodize, seals, pickles and cleaners; meters (pH, conductivity, surface tension); the Hull cell; AA and ICP readings; part tests; reagent checks; and a supplier-sheet method for a procedure that says "mL × factor". Test methods (from Lab home) shows the 27 core methods, the supplier-sheet method, the typed result, any method a tank uses and the shop's own methods. The rest of the library is marked unreviewed and is listed only with Show unreviewed library methods: those formulas have not been checked against a supplier's lab manual yet, so check one before a tank uses it. Every method carries a worked example that is checked whenever it is saved.

The office and lab technicians edit methods, or make a shop copy of a library method for their own supplier's procedure. The editor lists the readings and constants, checks the formula as you type (a name that is not declared, or a division by zero, is pointed out, and the names you can use are one click away), works the test example out and says whether it gives the expected result. Saving makes a new version: results keep the version they were worked out with, so an old result can always be checked by hand. A method that fails its checks can be saved as a draft, which is not used until it passes. Formulas are plain arithmetic on the method's own numbers (+ - × ÷, powers, brackets, and functions such as round, min, max, sqrt and if) and cannot reach anything else.

Control parameters and their set-up

The Chemistry tab holds the parameters you titrate or measure: name, unit, minimum, target, maximum and a note on the analysis method, each with its test method, the latest value (red when it is out), a trend sparkline and a Test button. Set up, beside each one, picks the test method and which of its results the parameter records; the unit (g/L, oz/gal, mg/L, % v/v, pts and so on; a value converts between the units of one kind); min, target and max, and an optional band inside them where an addition is suggested while the bath is still in spec; how often it is tested (by days, hours, shift, amp-hours, metal turnovers, operating hours or before each use); whether a step may start in the tank while the test is overdue or out of spec (don't check, warn, or block until tested); the element for AA / ICP runs; whether it is pass or fail; this tank's usual readings (the sample it always pipettes, the factor printed on the supplier's sheet); the figures from the supplier's technical data sheet that the addition rule needs (nickel in replenisher A, B per A, the largest single addition); and the stock item for each line of the addition, with the item's content when the rule works in grams (g/L for a liquid, the metal fraction and assay for a salt). A parameter without a method takes its result as typed, and its addition comes from one number: how much of the additive raises it by one unit in 100 gallons (or liters) of bath.

Testing a tank

Test, on the tank page, its lab page or Lab home, opens the test screen with a block per test (the ones due first; add another from the list below them). Each block shows the method's safety note, its procedure steps, and the readings with this tank's usual values filled in. The titrant's strength is the last value used for that bottle, so the tech usually types one number, the burette reading; a reading that comes from the tank (its target, its volume) is filled in from the tank. The result appears as you type, in the test's unit and its other units (5.144 g/L = 0.6869 oz/gal), with an in-spec, low or high badge, a bar from min to max with the target, the method's other results (85.74 % activity) and the work written out with the numbers: Ni_gL = (17.6 - 0) × 0.0498 × 58.693 ÷ 10 × 1 = 5.144 g/L. A reading the formula still needs is named ("Enter 0.05 M EDTA used"), and the previous three results sit under each block. Save records the readings, the method version, the strength used and the work; the server works the result out again with the same formula. Only the parameters tested move their due dates, and a result out of spec notifies administrators, managers, QC and lab technicians (not the person who recorded it).

Type results, on the Chemistry and Analyses tabs, is the quick form that takes every parameter's final value at once. An analysis entered by mistake is voided with a reason (who and why stay on record), not deleted; it no longer counts for the limits, the due dates or the charts.

What to add

Right after a test, and on the tank's lab page, What to add lists each correction: the chemical and the amount in the stock item's own unit (and in liters or gallons), what is on hand (short in red), the order of addition, a split when one shot would be more than the largest single addition, and How it was worked out. The rules a method can use:

  • Up to target: (target - actual) × volume, as grams of the active, then into the product through its content.
  • Supplier chart: an amount of the product per unit low per 100 of bath, the way most supplier sheets put it (and the one number a parameter without a method uses).
  • Linked replenishers: electroless nickel A, B and C by the supplier's ratio. 5.144 g/L of nickel against a 6 g/L target in 150 gal, with 100 g/L of nickel in A and A:B 1:1, is 1.28 gal of A and 1.28 gal of B.
  • In order, each line allowing for the one before: a Watts bath 5 g/L low on nickel and 10 g/L low on nickel chloride in 400 gal takes 33.4 lb of nickel chloride, then only 37.8 lb of nickel sulfate. That is the NI-WATTS-SALTS method, one of the unreviewed library methods: check its formula before a tank uses it.
  • Hull cell scale-up: 0.8 mL proved in a 267 mL cell is 3.0 gal for a 1,000 gal tank.
  • Amp-hours since the last addition × the supplier's rate: 30,000 A·h at 10,000 A·h per gallon is 3.0 gal.
  • Advice for the high side (dilute, decant) and for tests that only measure.

A figure missing from the supplier's sheet is named ("Needs TDS value: nickel in replenisher A") instead of being guessed, and a bench test asks for its figure on the spot. Work out an addition, on the lab page, does the Hull cell and amp-hour sums on their own. Add now (I am doing it) posts the addition at once, with the person who tested as the one who did it. Send add request sends it to a person, a role (anyone with that role can do it) or anyone, with a due time, urgent or not, when to re-test, a note and the safety text. A correction that has been requested or added no longer shows as something to do.

Add requests

Lab > Add requests is the list for the person at the tanks, made for a phone and gloved hands: theirs (with a count beside Add requests in the sidebar and a card on the shop floor screen), all open, sent by me, re-tests and done. A request opens with its safety text first, then each chemical with ADD and the amount in words (1.28 gallons), the stock on hand, and the amount actually added, in the request's unit or another of the same kind (liters for gallons, pounds for kilograms). Each line is marked Added, Later or Not added; more than 10 % off what was asked, or Not added, needs a reason. Done posts each line through the tank's addition, once only even if it is tapped twice: the chemical comes out of inventory, the additions log and the ledger record it, and the brightener's amp-hour count resets. The person who asked is notified (and emailed when the shop's mail is set up), and a re-test falls due; the request is marked re-tested once every parameter it corrected has been tested again after the addition and is back in spec (for the Watts salts, nickel metal, nickel chloride and nickel sulfate). Can't do it sends it back with a reason; the person who asked can send it again or cancel it, and a partly done request can be closed short. Times on a request read in the shop's own time zone. A precious-metal line (or every line, when the shop asks for it in Lab settings) needs a witness, never the person adding: on the same phone the witness picks their name and types their lab PIN (each person sets theirs under Add requests, My lab PIN), or the line waits, with nothing taken from stock, until the witness confirms it on their own login within the shop's window (15 minutes unless changed); after that it opens again.

Typing a test from the keyboard

The test screen opens with the cursor in the first reading still to type. Enter goes on to the next empty reading and Tab to the next reading to type, past the values filled in from the tank, the buttons and the procedure, so on a nickel and boric acid test one Tab goes from one burette reading to the next. The screen saves only with Save results or Ctrl+Enter, so three tests typed one after another are saved together.

Every meter reading and every typed reading (a temperature, a pH, a specific gravity) has an Instrument picker: the shop's instruments of that type, with or without a daily check, with the one used last chosen. A typed figure of no particular kind can name any lab instrument. The value keeps the instrument, so a failed calibration lists the readings taken on it (see Maintenance and calibration).

A line of Add now that is short of stock starts at what is on hand, and the rest stays on the request, as an open line, to add when the stock comes in. Adding more than is on hand takes stock below zero only when the person ticks Add it anyway.

Supplier and outside lab reports

Supplier report, on a tank's lab page, records a report from the supplier's lab: who sent it, the report number and dates, their value for each test (recorded as a test of the tank, marked supplier) and their recommended additions. Send these as an add request turns the additions into one request. Outside lab report does the same for an independent lab, with the chain-of-custody number and, per value, the qualifier (<, >, ND not detected, J estimate), the method, the MDL and the RL; a value below the reporting limit or not detected is kept on the report but not recorded as a test. Analytes the tank has no test for go under Other results, and Match suggests the tank test each one is. The report's page holds the lab's PDF, and a row can be recorded on a test later. Lab > Reports lists every report. Supplier and outside results show hollow on the SPC charts.

Reagents and instrument checks

Lab > Reagents keeps the titrant bottles and standards on the bench (EDTA 0.1 M, silver nitrate 0.1 N and so on): lot, supplier, expiry, when it was opened or made up, its station, and which bottle of each kind is in use. Standardize a bottle with two or three titrations against its standard: the screen works out each strength, the mean and the spread (RSD) as you type, and the bottle takes the mean as its actual strength when the titrations agree within the shop's limit (0.5 % unless changed; check it against your own procedure). Every titration that uses that reagent then starts from the bottle in use. A bottle is due again after its interval (from the method, usually 30 days), and its certificate of analysis goes on as a file.

A standardization against a weighed primary standard records the standard's lot, its assay from the certificate and the balance it was weighed on. The mass counts at that assay (99.95 % pure KHP standardizes 0.05 % weaker than 100 % would), and the balance is kept with its calibration standing at that moment; a balance overdue for calibration warns, or is refused when the shop blocks.

Lab > Instruments gives each instrument with a daily check (the pH meter's two-buffer calibration, a balance check) its check method and how often; recording a check works out the slope or the reading and says pass or fail. A result read with an expired or unstandardized bottle, or on an instrument whose check is not done or failed, warns or is refused, as Lab settings says (Basic warns, Controlled refuses); the check can be recorded from the test screen without losing what was typed.

Hull cell panels

The Hull cell tab of a tank's lab page keeps its panels. A panel has its photo, taken with the phone camera; the cell (volume, current, time, temperature, panel and anode); and its zones, marked on a 0 to 4 inch ruler from the high-current end: tap the ruler to split a zone, then rate each one (burnt, rough, bright, semi-bright, hazy, dull, dark, skip, pits, no deposit). Each zone shows its current density, A/ft² = current × (a - b × log10 inches), with a = 27.7 and b = 48.7 for the standard 267 mL cell (check them against your cell's scale; the scale holds between about 0.25 and 3.25 inches), and the bright range is compared with the tank's own amps per square foot. The increments added to the cell and the proved addition go on the panel; Scale to tank turns the proved addition into the tank amount, sent as an add request. A good panel can be made the tank's standard, and a panel is shown beside the one it is compared with. A panel can record the tank's pass / fail or Hull cell test.

A new panel starts with one zone not rated, and no bright range or coverage line shows until a zone is rated. The Hull cell test on the test screen has New panel: the panel is made, rated and graded, then goes back to the test with its grade (Pass or Fail, or the bright range for a Hull cell method), and the saved result names the panel.

AA and ICP runs

Lab > AA / ICP runs batches metals by atomic absorption or ICP. Give each metal test its element (Fe, Cu ...) in the test's set-up; a new run for that element lists every tank test of it that is due, each with a sample label and the dilution it used last time. Enter the blank and the standards against their readings: the line, slope, intercept and r are worked out as you type, and the calibration is accepted at the shop's minimum r (0.995 unless changed). A reading above the top standard is refused ("dilute more"), and a check standard is expected at the start and every 10 samples, within ±10 % (both shop settings). The instrument's CSV export can be imported, joined on the printed sample code, with its columns remembered for the instrument. Post records each sample as a test of its tank.

Amp-hour replenishment

Every run logged against the tank from the traveler or the terminal adds its amp-hours (metered, or amps times time) to the tank's lifetime total and to the count since the last brightener addition; a rack through a tank group adds each plating tank's own. The tank page recommends that count times the rate per 1,000 A·h alongside any addition from analysis; posting it resets the count.

Additions

Add chemical posts an addition no analysis called for: a stock item or a non-stock description such as a DI water top-off, the quantity, and a reason of analysis, amp-hour, routine, makeup, treatment or other. A treatment run posts its chemicals itself, with the reason treatment. The Additions tab lists every addition to the tank with the chemical, quantity, reason, cost (for finance roles) and who posted it; the Additions log under Tanks shows the same across all tanks for a date range with a cost total.

Making up a new bath, dumps and events

The Makeup tab holds the same makeup chemicals as the tank form, in order of addition, with the full-tank total of each line at the working volume and the stock on hand, and a line at the top that says whether there is stock for a new bath: "New bath stock: ready", or "short NIS (needs 500 lb, 300 lb on hand)". The same line sits under Bath age at the top of the tank page.

Make up new bath (on the Makeup tab; in the page head when the tank is dumped or its dump is due within 7 days; as the dashboard's Make up action) opens the makeup: for each stock chemical what a full tank needs, what inventory issues in the item's own unit, what is on hand, and Short or Can't convert. Make up and issue stock takes it out of inventory, logs the additions, sets the tank in service, records the makeup date, resets the amp-hour count and schedules the next dump. Unticking "Issue the makeup from inventory" records the new bath without taking any stock. It refuses, inside the window and naming the lines:

  • Can't convert: a line written in a unit its stock can't take, such as 1 gal of a wetting agent counted in "5 gal pail", or 50 lb of a cleaner counted in "ea". Nothing is ever taken out in the wrong unit. The message says the fix: count the item in gal, add its weight per gallon (on the inventory item, for liquids written by weight or solids by volume), or write the line in the item's own unit (0.2 "5 gal pail"). Issue anyway does not override this.
  • No working volume: a concentration on a tank whose volume is 0.
  • Short: not enough on hand, counted per chemical across its lines ("DUP needs 40 lb in 2 rows, 30 lb on hand"). Tick Issue anyway (the button becomes Make up anyway) to take it regardless and let stock go below zero.

The dashboard lists a tank that is dumped or due for a dump within 7 days with Make up, and adds "not enough NIS, NIC to remake" when stock is short. Log event records anything else that happened to the bath:

EventWhat it does
Makeup (new bath)The same as Make up new bath
DumpMarks the tank dumped and offers to make the new bath up straight away
Filter change, anode change, carbon treatment, dummy plating, cleaning, heater / cooling, treatment, otherDated and noted in the Events tab. A type one of the tank's treatments is logged as points to the Treatments tab instead, so the schedule moves on

Mark out of service and Mark in service, on the Details tab, take a reason and log it as an event. Starting an operation in a tank that is out of service or dumped is blocked; a tank out of spec or overdue for analysis gives a warning instead.

Treatments

Lab > Treatments keeps the shop's bath treatments, the work done to the solution: carbon treatment, dummy plating, peroxide or purification. Pumps, filters and heaters stay in Maintenance > PM schedule. A treatment is a checklist of steps, each an instruction with, optionally, a chemical (a stock item, an amount and a unit: g/L, oz/gal, %, lb/100 gal and kg/1000 L scale with each tank's volume, so "2 lb/100 gal" is 8 lb for a 400 gal tank), a time, or a reading with limits. A reading named like one of the tank's parameters uses that parameter's limits; ticked "After-treatment reading: charts in SPC", it is plotted on the tank's control chart. A treatment also says what it is logged as (carbon treatment, dummy plating, treatment and so on) and whether it takes the tank out of service while it runs. Add the usual ones fills an empty library with a carbon treatment, a dummy plate and a peroxide treatment.

Assign to tanks puts a treatment on tanks with a schedule: every n days, every n amp-hours, or as needed. The first due date carries on from the tank's last event of the same kind, so a carbon treatment logged before treatments existed counts. The tank's Treatments tab lists its treatments with the schedule, when each was last done and when it is next due (or the amp-hours left), with Run, Edit schedule and Remove; Assign treatment picks one from the library, or + New treatment builds one and comes back with it assigned. Open runs sit at the top of the tab with how many steps are done, and past runs below.

Run opens the run page, made for a phone at the tank: one row per step with a big Done. A chemical step says what to add to this tank ("Add 8 lb CARBON-PAC (for 400 gal)") with the stock on hand, and Done issues it from inventory as a tank addition (when the stock is kept in a unit the amount cannot be converted to, it asks for the quantity in that unit). A timed step has Start timer and a running clock. A reading shows its limits, and an in-spec or out-of-spec badge once it is recorded. Complete is enabled when every step is done; the office can Complete anyway with a note, and Cancel run takes a note (chemicals added and readings taken stay recorded). Completing logs the event on the tank and dates the next one. A treatment that takes the tank out of service is refused while a running load holds the tank, blocks steps in that tank while it runs, and puts the tank back in service when it completes, unless something else still keeps it out.

A reading taken during a treatment is not an analysis: it moves neither the analysis due date nor the recommended additions, and an out-of-spec reading before the treatment does not flag the tank. When one run reads every parameter of the tank, completing it records them as one analysis. Treatments due show in Lab > Treatments under Due now (with Run), on the Tanks page, on the dashboard ("Carbon treatment overdue 6 days", with Run treatment), as a warning when a step starts in that tank, and on the tank sheet.

SPC

The SPC tab (on the tank page and the tank's lab page) draws, for each parameter, an individuals chart and a moving-range chart. The control limits are the mean ± 2.66 × the average moving range of the first 20 tests after a make-up or dump (trial limits until then, frozen after); the shaded band is the spec. A new baseline, with a reason (after a carbon treatment, a new method), starts the limits again. Each parameter uses the shop's rules unless it picks its own: Western Electric 1 (a point beyond 3σ) and 4 (8 in a row on one side) by default, because a bath topped up by additions saw-tooths; Western Electric 2 and 3, Nelson 3, 4, 7 and 8, and a jump above the moving-range limit can be added. Each rule is named by what it looks for. A point that breaks a rule is ringed; supplier and outside lab results are hollow; additions are marked along the top and treatments shaded. Hovering (or the arrow keys) reads a point, and every number is in the table under the chart. Cpk (within, from the moving ranges) and Ppk (overall) show from 25 tests. A rule broken is something to look into, never a reason to add chemicals: it goes on Lab home under Look into it, closed with what was found (the method, a reagent, the instrument, a real change in the bath), or made a task or an NCR. Treatment readings marked to chart in SPC are plotted with the analyses; the rest stay in the analysis log with a treatment badge that links to the run.

Procedures and the tank sheet

Each procedure on a tank's Procedures tab is a controlled document. A new procedure, or a change to one, is a draft until someone who did not write or change it approves it (an administrator may approve their own); the approval records who approved it and when. Revise starts the next revision from the approved text and asks what changed; the approved revision stays in use, and on the tank sheet, until the new one is approved, and History keeps every revision with its text, what changed, who wrote it, who last changed it and who approved it. A draft changed after the approver opened it is not approved until they read it again. The tank sheet prints only the approved revision of each procedure, with its revision number, who approved it and when; a draft waiting for approval is named on screen above the sheet and not printed. Procedures written before became revision 1, approved by "migration". Withdraw takes a procedure out of use and off the sheet, and keeps its history. Duplicate copies each approved procedure to the new tank as its revision 1 with the same approval.

The Procedures tab holds written procedures per tank, typed as safety, operating, makeup, analysis, maintenance or dump, each with a revision. Print tank sheet produces a form with the tank's barcode, its volume, temperature, rectifier, anodes, agitation and filtration, the schedules, the PPE, the control limits with the method and the correcting chemical for each, the amps per square foot, the makeup recipe, the treatments assigned with their schedules, every procedure in full, and a blank log for analyses and additions written at the tank.

Chemical lots on additions

Every chemical received into stock can carry its supplier lot and certificate of analysis (see Inventory and purchasing), and every addition from an add request names the lot it used. Add now and an open line of an add request offer the item's lots with stock, oldest first, with the oldest chosen: pick the lot on the container you open, or Not recorded. A lot never received into stock is refused. When the amount is more than the lot picked has left, the dialog says so before anything is added: that lot gives what it has, and the rest is recorded from the next lots with stock, oldest first, one addition per lot, so no lot's trace shows more than it received. Tick It all came from lot (with the lot's number) when the container really held more than the count says; the lot's page then flags it for the office to check the receipts and the count. The additions log and a tank's Additions tab have a Lot column that opens the lot's page, the add request shows each lot a line came from, and the lot's page lists every addition from it: the tank, the date, the quantity and who added it. A line that needs a witness keeps its lot while it waits.

Asking the lab for a test

The floor tells the lab when parts come out wrong. Ask the lab to test sits on a step's card on the shop floor screen when the step runs in a tank, and under the reason in Record reject once a reject quantity is entered; the tank page has the same button. The dialog asks what was seen (burning, pitting, roughness, a dull or cloudy deposit, poor coverage, blistering or peeling, staining, the bath looking or smelling wrong, or something else, which needs a note unless a reject reason comes with it), an optional note and an optional photo from the phone camera. A request from a step or a reject keeps the job, the step, the reject reason and the count. Tapping twice sends one request.

The lab's lead role (set in Lab settings, else the QC level) and every lab technician are notified, and the request sits at the top of Lab home under Asked to test with what was seen, where, who asked and the photo. Test opens the tank's test screen with the request above the readings; the next test of the tank saved after the request answers it, from the lab page or the tank page, and the person who asked is told the results: which readings are out of spec, or that every result is in spec. The lab can close a request without a test, with a reason, and the person who asked is told why; the person who asked can close their own. Anyone who can see a tank may ask; the list of requests is for the roles with Tanks. Someone whose role does not include Tanks gets the results in the notice itself, which opens their notifications instead of the lab page they cannot use.

Quality

Quality is built into the job: QC cannot sign off a step of a job that requires thickness readings until they are entered, and every reject carries a reason code and a disposition. The Quality menu has nine pages: the Quality overview, QA tests, NCRs & CAPAs, Rejects & returns, Incoming, Certs, Specs, Deviations, and Training & documents. NCRs & CAPAs, Rejects & returns and Training & documents each hold two lists as tabs; the NCR, CAPA, return and document lists have chips that filter the list and count what is in it. QA tests (thickness, adhesion, salt spray and the other tests run on parts, and the hydrogen embrittlement relief bakes) are listed under Lab too. Calibration is kept under Maintenance and counted on the overview. Six quality checks (training at step start, calibration on readings, calibration at load and bake start, spec revision at receiving, an open NCR at shipping, a discrepancy at incoming inspection) each warn, block or stay off, as the shop chooses under Settings > Quality.

The Quality page

Quality opens on counts, each a link to the list it counts, already filtered: open NCRs, open CAPAs, overdue CAPAs, open customer returns, pieces rejected in the last 90 days, training expiring within 30 days (or already expired), documents due for review and failed QA tests in the last 90 days. A shop with Maintenance also sees the equipment due for calibration, and one with Polishing the pieces waiting for polishing inspection, each for the people whose role includes that module. Below them is one list of the open NCRs and CAPAs, overdue CAPAs first, with owner and due date; the SPC rule violations on tank chemistry, for roles that include Tanks; and NCRs by source over twelve months. A strip of QA test counts and a New QA test button sit at the top.

Thickness readings and QC sign-off

Readings are entered on the job page or from the Readings button on the shop floor terminal: one or more values in the job's unit (mil, in, µin or µm), the location on the part, and the gauge from the equipment list. The job shows n, minimum, maximum and average with a pass or fail against the tolerance, and each reading outside it is marked. When the job requires readings (the part's "Thickness readings required" box, copied to the job when it is received; for a job with no part, when it has a thickness range), a QC operation cannot be completed until at least one reading exists, on the job page or for a shared load; the Complete dialog says so. A job that does not require them passes QC without readings, and readings can still be recorded on it. One set of readings per job covers every QC portion by default; with "Readings per QC portion" on in Settings, each QC portion (a rack, a load) needs its own, and each shipment's cert lists the readings of the pieces it carries. Polishing inspections are never held for readings, since plating comes after them. The readings, the gauges and their calibration dates are snapshotted onto the cert at shipment. A reading taken with a gauge that is overdue for calibration, or failed its last one, warns as it is entered, or is refused when the shop blocks it (see Quality checks below).

Final QC sign-off

Completing a QC step runs the sign-off checks, and the QC Complete dialog lists each one with what it found and what would let the step go ahead. Thickness readings: when the job requires readings, or has a sampling plan and a thickness range, the step needs as many readings as the sampling plan's sample size for the lot, else the count the traveler asks for (such as "min. 5 locations"), else one. A job with no thickness spec and no sampling plan needs none, so the Final Inspection step of a process with no steps of its own is never held for readings. A step with a reading outside the tolerance, or with too few readings, is refused until the pieces are rejected, an NCR on the job or an approved deviation or waiver answers for them, or an administrator, a manager or QC signs off with a reason; each of these is logged under Quality checks. This check is always on.

Hydrogen relief bake: a bake step cannot be completed until its bake record is finished, with the hours the step asks for (its minimum time), whether it is completed on the job page, on a load or at the shop floor terminal (see Quality checks). A bake cannot ask for fewer hours than its step; one recorded as starting before the step it follows was done needs an administrator, a manager or QC to sign off with a reason; and a bake waiting for review counts only when it passed on its own figures. Time in process: the QC dialog flags an earlier step whose recorded run was shorter than its minimum time, so QC can look before signing off; it never stops the sign-off.

Bake adhesion test: when a test plan asks for a bake adhesion test, the job's last QC step cannot be signed off until the test has passed, or an approved deviation or waiver that names the bake test is chosen in the dialog; no other release counts (see Bake adhesion test). On a shared floor terminal, and on the job page, the operator is rarely the one who may sign off over the thickness or hydrogen relief bake checks: Supervisor approval in the dialog takes an administrator's, a manager's or QC's badge, PIN and reason on the same device, as it does for training and calibration. It is logged under the supervisor's name, given for that operator, that check and that step, and used once.

A sampling plan is set on a part, a customer or a process, and the part's wins, then the customer's, then the process's. A job keeps the plan in effect when it was received, as it keeps its specs, so a plan set later applies to new jobs only. Every shop starts with accept-on-zero (c=0) plans and ANSI/ASQ Z1.4 general inspection level II plans at AQL 0.65, 1.0, 1.5, 2.5 and 4.0; they are starter values, so check them against your copy of the standard and the customer's requirement. Record readings, the QC Complete dialog and incoming inspection say what the plan asks of the lot, such as "Sample 13, accept 0".

Readings can be typed in in, mil, µin or µm, or with the unit written after the number ("0.38 mil", "9.6 µm"). They are converted to the job's unit, and the value as typed is kept with its unit for the record. Each person's last unit is their default the next time. A wrong reading is voided with a reason by QC or the office instead of being deleted: it stays on the job, struck through with the reason and who voided it, and it leaves the verdict, the sign-off and the cert.

Rejects

Rejects are recorded when an operation is completed, on receipt from an outside processor, or from Record reject on the job: quantity, reason code, the operation they were found at, the source (found in-house or a customer return) and a disposition. Strip and replate creates a linked rework job; the other dispositions are scrap, use as is and return to customer. At a polishing step or its inspection, Back to the polisher (the default there) sends the pieces back to the polisher who did them as unpaid rework, recorded as a polishing inspection; strip and replate is not offered there (see Polishing team). Rejects & returns opens on the Rejects tab: every reject event for a date range and source (internal, customer returns or polishing inspection) with totals of pieces rejected, reworked and scrapped, a Pareto of reasons and the reject rate by process. A job built from a part's traveler counts its rejects under the traveler item or line they were found at, and polishing rejects count under the paid polishing item, so every bar carries a name. Each chart links to its full report and CSV under Reports for the same dates. A polishing-inspection row opens that inspection, a customer-return row names its return, and each row has a button that opens an NCR pre-filled with the job, quantity and reason.

NCRs

A nonconformance report is numbered by the shop's own sequence and opened from NCRs & CAPAs, from a job (Open NCR) or from a reject. The NCRs tab lists all open NCRs, those in CAPA, closed ones, or all.

FieldValues
SourceInternal, customer, supplier, audit
SeverityMinor, major, critical
Customer, job, part, quantity affectedLinked records; the NCR appears on the job page
Description, containment, root causeText; root cause as 5 whys or fishbone
DispositionRework, scrap, use as is, return to customer, repair, regrade
Cost of quality, ownerThe owner is notified when the NCR is assigned to them
StatusOpen, investigating, corrective action, closed; the form moves it between the open ones, and only the buttons below close and reopen it

Close NCR requires a disposition and takes the root cause. Open CAPA creates a corrective action from the NCR, copying its description and root cause, and moves the NCR to corrective action. Reopen, on a closed NCR, puts it back to open (or to corrective action while its CAPA is open) and keeps the disposition; it is recorded in the audit log. Open CAPA on a reopened NCR whose CAPA is still open goes to that CAPA and puts the NCR back in corrective action. When nonconforming parts are to ship as they are, ask the customer for a waiver first (see Customer deviations and waivers below).

CAPAs

A CAPA is corrective or preventive, with a source (NCR, audit, customer, internal, management review), the related NCR, a title, problem statement, root cause, action plan, owner and due date, 30 days out by default. The CAPAs tab lists all open CAPAs, those awaiting verification, overdue ones, closed ones, or all. Action items are tasks assigned to people with their own due dates; they show on the CAPA and in each person's Tasks list. Record verification writes how effectiveness was checked, for instance no recurrence in 60 days. Marking it effective closes the CAPA and its NCR together; not effective puts the CAPA back in progress. On the form the status moves between open, in progress and verify (awaiting verification); only Record verification closes it. Reopen, on a closed CAPA, clears the effectiveness check (its text stays as history), puts an open NCR it came from back in corrective action (a closed NCR stays closed) and is recorded in the audit log.

QA tests

Quality > QA tests (also under Lab) holds the tests run on parts; bath titrations and meter readings are tests of the tank, on its test screen (see Tank chemistry). It replaced the Lab tests page: every old Lab test was copied in once, with its files, and old links still open it; hull cell rows became Hull cell panels on their tank. The page has six tabs: To do, All tests, Chamber, HE bakes, Templates and Plans. Anyone on staff can start a test and record results; templates, plans, reviewing a result, voiding a test and opening an NCR from one are for QC, office staff, managers and administrators.

To do is the worklist: HE bakes to start and in the oven, inspections due, tests due and running, results to review, steps that must start soon, and periodic tests coming due. All tests lists every test with chips for its status (open, due, planned, running, to review, passed, failed, void), a date range and a search.

Templates

Fifteen starter templates: coating thickness (ASTM B568, B499 or B244); adhesion by bend, tape, file and heat-quench (ASTM B571); neutral salt spray (ASTM B117, with inspections at 24, 48, 72 and 96 hours); humidity; porosity; microhardness; coating weight; seal quality; solderability; the hydrogen embrittlement relief bake (ASTM B850); the ASTM F519 sustained-load test; and Other. A template names the spec, the number of specimens, the hours and inspection points of an exposure test, the equipment it runs in, whether QC must review the result and whether it prints on the cert. Pass or fail is worked out by one of the lab's part-test methods, with the spec's values held on the template. The starter values are examples, marked "check against your spec" until someone ticks Checked against the spec. The office adds and edits templates.

Test plans

A plan says which tests a part needs: for a part, a process, a customer or a combination (all those set must match), every job, every lot, every shipment or every so many days, whether the result prints on the cert, and whether a fail holds the job. A matching job gets a planned test, which falls due once its plating is done; a plan by days raises a due test on its date. The server checks the plans every five minutes.

Recording a test

A test's page shows the job, part and spec, and what to do next. Start the test starts an exposure test's clock in its chamber. Record result takes the values the method asks for, with the spec's values filled in, the specimens with their ratings, and photos; a thickness test takes the job's own readings and thickness range. The result card shows the values used and the pass or fail. An exposure test is inspected at its set hours, each with its result and photos (Inspect at another hour for an extra look), and the server sends a reminder when an inspection is due and when the test has run its hours. When the template asks for review, the result waits under To review until QC accepts it (Accept the result) or sends it back with a note.

A failed test tells administrators, managers and QC. Open NCR opens a nonconformance report with the job, part and customer filled in, and the job goes on hold when its plan says so. A test can be voided with a reason.

The salt spray chamber board

The Chamber tab shows each chamber (equipment with the daily salt fog check, or named for salt, fog, humidity or a chamber) with the tests running in it, the hours so far and the next inspection, and refreshes every minute. A test page warns when its chamber's daily check has not been done.

Hydrogen embrittlement relief bakes

Any step with a Must start within limit and pieces waiting carries a countdown on the job page, the Schedule board and the shop floor terminal, from when its oldest waiting piece came off the step before. Administrators, managers and QC are told once at half the window, once at 80% and once when it is late. A step counts as a bake when its name says bake, embrittlement or HE relief, or when the job has an HE bake test planned. Start bake, on the job page or the shop floor terminal, records the oven, the set point and temperature window, the hours required, the start window, when plating finished (filled in from the countdown) and when the bake started; Finish records the end, the average temperature and the hours at temperature, which cannot be more than the time in the oven. The bake conforms only if it started inside the window, ran long enough and stayed in the temperature window, and the record says why when it does not. Temperatures are kept in °F; a value typed in °C is converted. The HE bakes tab lists bakes waiting, in the oven and done.

The bake hours, the start window and the temperatures depend on the part's strength class and the plating spec (ASTM B850, AMS 2759/9). The starter values, start within 4 hours of plating and 8 hours at 350 to 400 °F, are placeholders: verify them against your spec before relying on them.

When the bake step sets its own minimum time and temperatures, Start bake is filled in from the step: a 23-hour step at 365 to 395 °F starts as 23 hours required with a set point of 380 °F.

Bake adhesion test

Some customers prove adhesion with a bake test: plated parts or coupons are heated to a set temperature for a set time, quenched or not, and then looked at for blistering, peeling or flaking (ASTM B571 heat-quench). It is a test of the coating and is separate from the hydrogen embrittlement relief bake: it has no start-within deadline after plating, it is not on the HE bakes tab, it never counts as an HE relief bake, and an HE relief bake never counts as a bake adhesion test.

It is set up as a test plan of the kind Bake adhesion test on a part, or on a customer or a process for all their jobs, with the set point in °F or °C, the time, whether the samples are quenched and in what, whether they are parts from the lot or coupons and how many, the spec and whether a pass prints on the cert. Each job the plan covers gets the test with those values. The traveler prints each bake adhesion test on its own line under the steps, with the test, its spec, the set point and time, the quench and the samples, and boxes for the oven, the times in and out, the result and who checked it.

Until the test passes, the job is held: its last QC step is not signed off, and no certificate of compliance is issued for it, neither with a shipment for a customer who requires certs nor with Issue cert on the job page. The QC Complete dialog and the refusal both say where the test stands. A pass on the job, on the job its lot was split from, or on another job of the same lot for the same customer releases it. So does an approved deviation or waiver in effect for the job that is about the bake test: its title or its characteristic says bake test (or bake adhesion test), or gives the test's number. One about another requirement that only mentions the bake test, such as a thickness waiver whose proposed value adds that the bake test still applies, does not release it. At final QC it is chosen in the dialog; a certificate issued under it is noted in the gate log. A failed or voided test does not release the job, and neither do rejected pieces, an NCR or a supervisor's reason.

On the cert

Passed tests marked to print on the cert, on the job or on its lot, are listed on the certificate of compliance in a Tests table, and passed bakes in a hydrogen embrittlement relief table with the oven, the times and the temperatures (see Certs, shipping and packaging). The cert and the traveler also carry the part's drawing revision as it was when the job was received (see Jobs, travelers and routings); changing a part's drawing revision is recorded, with the part's traveler as it stood, and the part's page lists its drawing revisions and the test plans that apply to it.

Incoming inspection and damage reports

Customer parts are checked as they come in. Receive job has an Incoming inspection section, folded until it is used:

  • The count on the packing list and the count you made. The count fills Quantity when Quantity is blank.
  • The condition: OK, damaged (what is damaged and how many pieces) or contaminated.
  • Contamination: rust, oil or grease, scale, old coating, other.
  • The base material, the hardness (HRC 40) or the strength class (10.9, Grade 8, 180 ksi), and notes.

A line under the boxes says what will be recorded as you type: "Counted 480; the packing list says 500 (20 short)." The same record can be made later with Record inspection on the job page. Record damage, also on the job page, is for customer parts damaged in the shop: what was damaged and how, the step where it was found, the cause (damaged in our shop, arrived this way, not known) and the pieces affected.

A count that differs from the packing list, damaged or contaminated parts, and every damage report are discrepancies. What happens next follows the shop's setting (see Quality checks):

  • Warn (the default): administrators, managers, QC, the customer's sales rep and whoever received the job are told. The office can tick Put the job on hold.
  • Block: the job goes on hold by itself. An administrator, manager or QC can let it in without a hold, with a reason.
  • Off: it is recorded, and nobody is told.

After saving, a short dialog shows what was found and takes photos, from a phone camera or a file. Email the customer opens Email this with the report as a PDF, the photos attached and a message asking how to go on (and saying the job is held, when it is).

Hardness feeds the hydrogen embrittlement check. Steel counts as high-strength from HRC 31 (a setting under Settings > Quality; check it against your customer's spec), from a strength class of 1000 MPa, or when the job's material is a high-strength steel. The inspection then says the parts need a hydrogen relief bake after plating, and warns in red when the job has no bake step.

Quality > Incoming lists every inspection and damage report, with chips for Open, Discrepancies, Damage, Resolved and All, and a search by job, PO, customer or part. "Customer not told" marks a discrepancy that has not been emailed. A record's page has the facts, the photos, Email the customer, Open NCR, Mark resolved (with how it was settled), Edit, Void (kept on file, marked void), the job's hold with Release, and the history.

Holds

A hold stops the work: no step, polishing run or load starts on a held job, and nothing ships from it. Each hold keeps who placed it, when, why and where it came from: put on hold by hand, an incoming inspection, a damage report or a failed QA test. The job page shows a red ON HOLD banner with the reason and a link to the record, and the Holds card keeps every hold with its release. Place on hold asks why. QC, office staff, managers and administrators release a hold; one from an incoming inspection or a damage report needs the reason it can go (for example, what the customer said). An operator who tries to start a held job is told the reason and that QC or the office releases it.

The spec library

Quality > Specs keeps the specifications your customers call out. A spec has:

  • A spec number (ASTM B633, AMS 2404, a customer's own ACME-PS-101) and a title.
  • An issuer: a customer, AMS, ASTM, MIL / federal, SAE, ISO, your own or other. The customer whose spec it is, when it is theirs.
  • An owner, who is told when a new revision comes in.
  • Flow-down notes: what the customer's PO or quality clauses add.
  • The spec documents, as files.

Typing a number such as "MIL-A-8625F Type II" reads the issuer (MIL), the revision (F) and the type from it.

Each spec has its revisions, each with an effective date, what changed and its own file. Which one is current is worked out from the dates: the latest revision in effect is current, a later-dated one waits as upcoming, and older ones are superseded. A revision issued by mistake can be marked withdrawn.

Used by links the spec to the parts, processes and customers that use it, each with the type, class or grade it is called out at and the customer's own requirements. A customer link puts the spec on every job for that customer when "Every job for this customer" is ticked, the default for the customer's own spec. Unticked, it only adds the customer's requirements where a part or process brings the spec in. A new link can go on the open jobs it reaches at once; otherwise only jobs received from then on get it.

The spec and revision on every job

When a job is received it keeps a copy of its specs at the revision in effect: from its part, its process, its steps and the customer's links. A rework job copies its original's, and a split lot its parent's. Later changes to the library do not change the copy.

  • Receive job lists the specs the job will get, with a revision picker for a PO that calls for an older revision. An older revision asks why it is kept.
  • The job page has a Specs card: each spec with its revision, type or class, the customer's requirements and the flow-down notes. The office can add a spec or take one off.
  • The traveler prints the same lines.
  • The certificate of compliance prints the spec and revision from the job's copy (see Certs, shipping and packaging).

A new revision

New revision on a spec's page shows, before it is saved, who will be told and which open jobs will still be on the older revision.

  • Dated today or earlier, it replaces the current revision at once. The spec's owner, whoever received the open jobs on the older revision, the sales reps of the customers who use it, and administrators, managers and QC are told, with the open jobs still on the older revision listed.
  • Dated later, it waits as upcoming, and the notice goes on the morning it takes effect.

Open jobs keep their revision until someone acts. A job on a replaced revision shows a warning on its page with Move to rev 23 and Keep rev 19; Keep asks why (for example, the customer's PO calls for it). Receiving a new job to a replaced revision warns, or is refused without a reason, as the shop chooses. The spec list counts the open jobs on an old revision.

Specs typed as text

A process whose Specification field is plain text keeps working as before. The spec list shows it under Not in the library, and so does the Specs card of a job on that process. Add to library creates the spec, or finds it when it is already there, reads the revision and class from the text, links the process, and puts the spec on that process's open jobs.

Customer deviations and waivers

When work cannot meet a requirement, ask the customer before it ships. Quality > Deviations holds each request. A deviation is asked before the work is done; a waiver after, when the work is done and does not meet the requirement. A request names:

  • The customer, and a title they will recognise.
  • What deviates: the spec (from the library, or as written), the clause, the characteristic, what is required and what is proposed or was made.
  • Why you ask.
  • What it covers: jobs, lots, or a part when no job or lot is named; a quantity limit and an expiry date, both optional.
  • The customer's reference, the NCR it comes from, internal notes the customer never sees, and photos and files.

The job page's Deviations card lists the job's open NCRs, each with Ask the customer for a deviation. That fills in a waiver from the NCR: the customer, the job, the part, the quantity and the description. A row on the Ship page held back by an open NCR has Ask for a deviation too, filled in from the job.

A new request is a draft. Email sends it with Email this: a PDF of the request and an approve or decline link that needs no sign-in. Sending the email marks it as waiting for the customer. Send to the portal shows it to their portal users. The customer approves with their name, title and date, or declines with their name and a note, on the linked page or in the portal. Their answer, the time and how it came are kept, and the office is told. An answer given by phone or on paper goes in with Record the answer. New link stops the old link working, and so does cancelling the request.

An approved request covers its named jobs (and jobs split from them), its lots, or its part, until its expiry date and while pieces are left under its quantity limit. A shipment under it prints a line on the certificate of compliance, "Shipped under waiver D-1, approved by Dana Buyer (Quality Manager) on Oct 15, 2026", and counts its pieces. It expires when its quantity has shipped, or on its date (checked each night); voiding a shipment gives its pieces back. The list has chips for drafts, waiting for the customer, approved, declined, expired, closed and cancelled, and each request keeps its emails and its history. Close ends one that is no longer needed.

Shipping a job that has an open NCR, with no approved deviation covering the pieces, warns on the Ship page. When the shop blocks it, only an administrator or a manager can ship it, with a reason that is kept on the shipment.

Training matrix

Training & documents opens on the training matrix: people against courses. Each cell shows the level (trainee, qualified or trainer) with the expiry date, or Missing, Expired or Expiring, and is blank where the course is not needed. A course is needed by the roles named on it, and by anyone marked as needing it. Counts across the top give missing, expired, expiring soon and trainees, and whether the check at step start is off, warn or block. Chips switch to Courses, Due (expiring and expired) and, for the office, Check log (the warnings and overrides at the start of work).

A course has a code and title, a renewal period in months, the days before expiry to remind, the roles that need it, and files such as the slides or the work instruction it teaches. It also says what it qualifies someone for: processes, tanks, tank groups, lab methods and polishing operations. A tank group covers every tank in it. Checked at step start makes the course count in the check below. On the job means a trainer signs each person off.

Tapping a cell opens what can be done there:

  • Record training: the level, the date, the expiry (from the course's renewal when left blank), the trainer, a score and notes. On an on-the-job course, a trainee is moved up with Sign off.
  • Mark as needed or Not needed for that person.
  • Withdraw a qualification, with a reason. The record stays, marked withdrawn.
  • Allow for the shift (below).

The office and QC record training. A current trainer on a course can sign others off on it, but not themselves. Making someone a trainer is for administrators, managers and QC. Each person has a page with their courses and history, and My training shows your own. Each person is reminded once when a qualification is coming due (30 days before, unless changed) and once when it expires, and administrators, managers and QC get a summary.

Training checked when work starts

When someone starts a job step, a polishing run or a load, or enters a lab result, the server checks that they hold every course linked to that work (its process, tank or tank group, polishing operation or lab method) as qualified or trainer, and not expired. The shop chooses what happens when they do not:

  • Warn (the default): the work starts and the person sees what is missing. The warning is logged, and the matrix marks them as needing the course.
  • Block: the start is refused, with what is missing. An administrator, manager or QC, or a trainer on that course, can start it with a reason, which is logged.
  • Off: not checked.

A course can also be linked to an instrument (one gauge, such as G-XRF-1) or an instrument type (every thickness gauge, every pH meter). Then anyone who enters a thickness reading, a QA result or a lab result taken on that instrument is checked the same way, and the warning or refusal names the course; a standardization weighed on a balance is checked for the balance.

Allow for the shift, on a matrix cell, lets a supervisor or a trainer on the course allow a person to work without it for a few hours (up to 72), with the reason; for example, while they work beside a trainer. Each start in that time is logged with the name and the reason, and Check log shows who is allowed now, with End now.

Controlled documents

The Documents tab holds procedures, work instructions, forms, specifications, policies, the quality manual and drawings, each with a number, a revision starting at A, an owner and a review date. A new document is a draft. Approve records the approver and the effective date and sets the next review a year out; a document is approved by a manager, administrator or QC other than its owner. Revise on an approved document archives the approved text into the revision history, requires a change summary and opens the next revision as a draft. Make obsolete withdraws a document while keeping it for the record. Chips list the approved documents, those due for review, drafts, obsolete ones, or all.

Calibration

Thickness gauges, XRF testers, thermometers, pH meters and the instruments on tanks, rectifiers and ovens are calibrated under Maintenance > Calibration. Each record keeps the values as found and as left at each point, the standard used and its certificate, the lab and its ISO/IEC 17025 accreditation number, and the lab's certificate. When an instrument is found out of tolerance, its impact list shows every reading, test, lab result, load, bake and cert that used it since its last good calibration, with an NCR and a customer notice one click away (see Maintenance). The certificate of compliance quotes each gauge with its calibration dates.

Quality checks: off, warn or block

Settings > Quality, for administrators and managers, sets six checks. Each is Off, Warn or Block:

  • Warn is the default, and suits a general, decorative or chrome shop. The work goes ahead and says so, and the warning is logged.
  • Block stops the work until it is fixed, or until someone allowed to go ahead gives a reason, which is logged.
  • Off does not check.
Training at step start
Someone starts a job step, a polishing run or a load, or enters a lab result, without the training for it. On Block, an administrator, manager or QC, or a trainer on that course, can go ahead.
Calibration on readings
A thickness reading, QA result or lab result is entered with an instrument that is overdue or failed its last calibration. On Block, administrators, managers and QC can go ahead.
Calibration at load, step and bake start
A load, a step or a bake starts on a tank, rectifier or oven whose instrument is overdue or failed. On Block, administrators, managers and QC can go ahead.
Receiving to a replaced spec revision
A job is received to a spec revision that has been superseded or withdrawn. On Block, whoever receives it gives the reason the job stays on it.
Shipping with an open NCR
A job with an open NCR ships without an approved deviation that covers it. On Block, only administrators and managers can ship it.
Discrepancy at incoming inspection
The count differs from the packing list, or parts arrive (or get) damaged or contaminated. On Block, the job goes on hold; administrators, managers and QC can let it in without a hold.

The same page also sets the Hydrogen relief bake record at bake steps check: a hydrogen embrittlement relief bake step is completed without a finished bake record of the hours the step needs. It is Block unless changed, and on Block administrators, managers and QC can go ahead with a reason.

The same page sets the hardness from which steel counts as high-strength (HRC 31 unless changed), the days before expiry or due date that training and calibration reminders go out (30 and 14 unless changed), and lists the recent warnings, overrides, holds and kept revisions with who and why.

One dialog answers every check, on the shop floor terminal, the job page, loads, polishing, the lab, QA tests and the Ship page. It says what is missing or overdue. For someone allowed to go ahead it asks "Why is it OK to start?" (or to use the instrument, or to ship) and sends the request again with the reason; anyone else is told who can go ahead. On a held job, QC and the office can release the hold there, with the reason, and carry on.

Customer returns

When a customer sends parts back, open the return from the shipped job's page with Customer return (RMA). It asks how many pieces, the reason code, what the customer reported, their own reference number, and the disposition: rework at no charge, replace, credit, scrap, or evaluate first. The return gets its own number (RMA1, RMA2 and so on, with the prefix you choose), is linked to the original job, and is recorded as a customer reject so the reject statistics show it.

With the rework disposition a new job opens at once at priority 1 and no charge, carrying the original routing, part and specification, marked with the return number and the original job. If the parts have not arrived yet, untick "The parts are already here" and the rework job waits on hold; Parts received releases it and sets its quantity to what actually came back. Shipping the rework job closes the return by itself. Credit, replacement, scrap and evaluation returns are closed by hand with a line on how they were resolved and, for credits, the amount.

The Returns (RMA) tab of Rejects & returns lists all open returns, those in rework, closed ones, or all; each has a printable return authorization to send the customer and to travel with the parts, and a link to open an NCR for the complaint. The Quality page counts open returns.

Audit trail and record history

QC reads the shop's audit trail as administrators, managers and the office do: Audit trail on the Quality page opens it (it is also under Setup). It lists changes newest first, 100 to a page with the total, and filters by kind of record and record number, with the record's own lines such as a tank's parameters or a job's operations, by person, by kind of change, by words and by dates. Download CSV gives every row the filters match, and each row links to the record it changed. Changes to Settings, to appearance, fields and terms, and to a process's routing show the old and new values.

Part, process, tank, customer and job pages end with a History card of the record's latest changes, with a link to its full history. Job, customer, quote and invoice pages have Add task, which links the task to the record, and the Tasks page names the linked record and opens it. Deleting a task asks first; a thickness reading is never deleted, only voided with a reason.

Open NCR on a job fills in the job's customer, part and quantity, and an NCR saved with only the job number takes them from the job. NCR and CAPA owners, and the people tasks and action items are assigned to, are chosen from the shop's staff, never a customer's portal login. The NCR page has Trace a chemical lot for a complaint that may come from the chemistry.

Certs, shipping and packaging

One screen takes a customer's finished pieces, whole jobs or the finished part of a job still in process, records the shipment, prints the packing slip and carton labels, issues the certificate of compliance and, if you want, raises the invoice for the pieces on it.

Ship finished pieces

Open Shipping > Ship. The Ship Jobs page lists every Complete job and every job in process that already has finished pieces (good pieces through the last step), with a tab per customer and a count of what can ship on each tab. The table shows job, part number, process, customer PO, then quantity ordered, finished, shipped so far, ready (finished and not yet shipped), still in process and rejected, then three cells you can edit per line: Ship qty, Cartons and Weight (lb).

  • Ship qty starts at the ready pieces and cannot go above them: pieces still in the shop, rejected or lost never ship. Rework pieces ship on their own rework job.
  • Complete jobs start ticked. A job still in process is marked Partial and starts unticked: tick it to ship its finished pieces now while the rest are worked (a partial shipment). A job can ship in as many shipments as needed.
  • Cartons is proposed from the part's Pieces per Carton / Bag and recalculates as you change the quantity.
  • Weight is prorated from the part weight on file.

Above the lines, a highlighted panel shows the customer's shipping instructions from the customer record (carrier account, dock hours, labelling, ASN or portal links, who to call; pasted links are clickable), their default packing rule, phone and primary contact, with a link to edit the customer. The same panel is on the shipment page and the job page, receiving sees it as soon as the customer is chosen, and the packing slip prints the instructions in a box under the ship-to block.

Below the lines you enter Ship date, Carrier (a pick list of common carriers, or type your own), Tracking / PRO and Notes. The button is Ship and print packing slip. Untick a line to leave that job for a later shipment.

The Weight box follows the Ship qty: the part's weight each times the pieces on the line, so 200 of a job's 296 pieces at 0.6 lb weigh 120 lb, and the packing slip and the carton labels print that weight. A weight you type from the scale stays when the quantity changes; clear the box and it follows the quantity again. Carrier starts with the carrier of the customer's last shipment, or with Ship via on the customer record before the customer's first shipment, and the line under the box says which.

A job keeps its status while pieces are still to come; the job page reads "200 pcs · shipped 60 · ready to ship 40 · in process 100". The job moves to Shipped when every step is done and every finished piece has shipped. A complete job whose every piece was rejected has nothing to ship: its row offers Close job, which records a shipment line of 0 pieces (carrying the rejected pieces back to the customer if they go) and marks it Shipped, with no certificate or invoice. A job on hold ships nothing, not even its finished pieces. A job with an open NCR and no approved customer deviation covering the pieces says so in amber on its row, with the NCR and Ask for a deviation. Shipping it warns; when the shop blocks it under Settings > Quality, the row is red and only an administrator or a manager can ship it, answering "Why ship anyway?", and the reason is kept on the shipment (see Quality). Shipping needs an Office, QC, Manager or Administrator login; "Create the invoice now" is shown to Office, Manager and Administrator.

Customers who take complete jobs only

Partial shipments are allowed unless the customer record says otherwise. Tick No partial shipments on a customer who wants each job in one delivery. For that customer a job ships only when it is complete, with all its finished pieces together: their jobs still in process are listed on Ship Jobs but cannot be ticked, with the reason ("Acme Aero takes complete jobs only: 100 of 200 pieces are still in process"), and a complete job's ship quantity is fixed at its ready pieces. A job split from such an order ships only with the rest of the order, once none of it is still in process.

Shipments

Shipping > Shipments lists each shipment with customer, ship date, carrier, tracking, pieces, invoice number (or a "not invoiced" badge) and status. A shipment page shows the contents, carrier, tracking, ship-to address, who shipped it, notes and the certificates issued with it. From here you print the packing slip or carton labels, open or create the invoice, and void the shipment.

On a shipment that is part of a job shipped in parts, the contents show "Partial 2" or "Final 3" and how many pieces are still to follow. Void returns the shipped pieces to the jobs (a complete job goes back to Complete with them ready again, a job still in process stays in process) and removes the certs issued for that shipment. A shipment that has been invoiced cannot be voided until the invoice is voided first, and the voids go in reverse order: a shipment whose job was invoiced again on a later shipment waits until that later invoice is voided. A shipment cannot be voided below the pieces the customer has already sent back on returns.

Edit on a shipment changes its carrier, tracking number and notes after the slip is printed, for example when the tracking number comes from the carrier's software later; the packing slip, the carton labels and an emailed slip show the change. A UPS, FedEx or USPS tracking number is a link to the carrier's tracking page. Email sends the packing slip to the customer as a PDF, with the carrier and the tracking link in the message and, when the customer uses the portal, a link to the shipment there; the shipment lists the emails sent. Email on a customer return (RMA) sends the RMA form the same way, with the rework job number and its due date.

Packing slip and carton labels

The packing slip (form PO-PKS-01) prints with the shipment number as a Code 39 barcode and a QR code, ship date, carrier, tracking, carton count, gross weight, terms from the customer record, sold-to and ship-to blocks, and a line per job: our job, customer PO, part number and revision, description with lot number, finish and specification, quantity and cartons. A line of a job shipped in parts adds "Partial shipment 2 · 100 of 200 shipped to date · 100 to follow", or "Final shipment 3 · 200 of 200 shipped" on the last one. Packing instructions and notes print under the lines, and the slip ends with sign-off cells. The ship-to address is the customer's Ship-To Address, or the billing address when that is blank.

Carton labels print one per carton at 4 by 3 inches: ship-to, carton n of N, part number and revision, quantity in this carton, customer PO, our job, finish code, description, lot number and the shipment barcode. Every carton of a partial shipment is marked PARTIAL with "Shipment 2 of job 50008 · balance to follow 100"; the last shipment's cartons are marked FINAL.

When the shipment line has a weight, each label also prints its carton's weight: the line's weight shared out by the pieces in that carton.

Packaging spec on the part

Packaging lives on the part record.

Pieces per Carton / Bag
Sets the carton count that Ship Jobs proposes and the label quantities.
Packaging Type
Carton, bag, bag in carton, tray, tote, skid, customer container or bulk.
Packing Instructions
Free text, for example layer counts, VCI paper, no staples, label format. It prints in the Packing block of the traveler with the carton count for the full lot, on the job page and on the packing slip. Blank uses the customer's Default Packing Instructions.

Certificate of compliance

When a customer has Cert of Compliance Required ticked, shipping issues a cert per job on the shipment, for the pieces on that shipment: a job shipped three times has three certs, each for its own quantity. The cert is a snapshot taken at that moment, so a later edit to the part or process does not change a cert already issued. The document (form PO-COC-01) states:

  • Customer, customer PO, our job number, shipment number, lot or heat number.
  • Part number, revision, the drawing revision the job was received at (when the part has one), description, base material, quantity shipped and ordered, and on a partial shipment "Partial shipment 2: 100 of 200 shipped to date; 100 to follow" (or "Final shipment 3").
  • Process code and name, and the specification with its revision and type or class, from the specs the job kept when it was received ("ASTM B633 rev 19, Type II SC2"), so a later revision in the spec library does not change it. A job with no spec in the library prints the specification on the process, as before.
  • The thickness requirement with the count, minimum, maximum and average of the readings on the job, and a result of CONFORMS, NONCONFORMING or NOT MEASURED. The table prints when readings were taken or the job requires them; a job that needs no readings and has none prints none. Readings are the job's as of the cert, so a later shipment's cert includes readings taken since the earlier one. With "Readings per QC portion" on, each shipment's cert lists the readings of the pieces it carries, first in, first out.
  • Each gauge the readings were taken with, its serial number, last calibration and calibration due date.
  • The QA tests that passed and are marked to print on the cert, on the job or on its lot: test number, name, spec and revision, the result, the date, the specimens and the equipment. Passed hydrogen embrittlement relief bakes print in their own table: the oven, set point and temperatures, when plating ended and the bake started (and the time between, against the window), the hours baked against the hours required, and CONFORMS (see Quality).
  • The operations performed, with the completion date of each. The tank, time, temperature, amps and volts logged on each run, and everyone who worked the step's pieces, print only when the shop turns them on (see Review and sign below).
  • The certification statement, from Settings > Company or the Cert Statement Override on the process, a note when the parts were stripped and refinished under a rework job, and a signature block that reads Not yet signed until QC signs the cert.
  • Each approved customer deviation or waiver the pieces shipped under, one line each: "Shipped under waiver D-1, approved by Dana Buyer (Quality Manager) on Oct 15, 2026". The pieces are counted against the deviation's quantity limit.

Quality > Certs lists every cert with job, customer, part number, customer PO, quantity, shipment and issue date, and opens each one for printing. Email on a cert sends it to the customer's contacts as a PDF, with an editable message and, when the customer uses the portal, a link to it there; the cert keeps a list of the emails sent. On a job in Complete or Shipped status, or one that has shipped part of its pieces, the Issue cert button issues a fresh copy for a customer who asks for one with updated readings; it covers at most the job's finished pieces. Cert numbers come from Document numbering under Settings > Company.

Review and sign

A cert is issued unsigned. Review and sign on the cert is for QC, managers and administrators: the person checks the cert against the job's records and signs it with their name, their title (their own from Settings > Team, else the signer title in the certificate settings, and they can change it) and the date. The signature box then prints the name, the title and the date, the emailed and downloaded PDF ends with "Signed:" and the same, and Quality > Certs shows who signed each cert and when. A signed cert cannot be changed; issue a new one to correct it. The signature is kept in the audit trail.

A cert that QC has not signed yet says so on its PDF too: the PDF that is emailed or downloaded ends with "Not yet signed", as the signature box on its page does, so a copy saved before QC signs it is never taken for a signed one.

Settings on Quality > Certs holds the certificate settings, which QC, managers and administrators change:

  • Email certs only when signed. Email on a cert that is not signed yet is refused with the reason, and the cert page says so above the document. The shipped email then attaches only the shipment's signed certs; email the others from the cert once they are signed.
  • Print who did each step and Print the step parameters, both off unless the shop turns them on. Off, the cert, the customer portal and the PDF show the step names and dates only, so operator names, tanks, times, temperatures, amps and volts stay inside the shop. They apply to certs issued from then on; a cert already issued keeps what it printed. A cert issued before these settings existed shows the step names and dates only, as the settings start off.
  • Signer title, suggested when someone signs who has no title of their own.

The invoice per shipment

"Create the invoice now" raises the invoice from the shipment, and each invoice bills the pieces on its shipment. Charges that belong to the order are billed once, so a job shipped in parts never totals more than the same job shipped whole:

  • The minimum lot charge is a floor on the order's total across its shipment invoices, not on each one. 40 pieces at $2 against a $150 minimum bill $150; the next 160 pieces ($320) bill $250, for $400 in all.
  • A lot price is billed on the first shipment's invoice; later shipments of the job carry the line at 0 with a note naming that invoice.
  • A job split into two counts as one order for both rules.
  • Prices by the pound or by area are billed on the running total, so three partial shipments add up to the whole job without rounding drift.
  • The precious-metal surcharge is charged on each shipment's billed quantity at its own ship date's price. Rework jobs bill nothing and carry no surcharge.

Once a job has a shipment invoice, its unit price, price unit and minimum charge are locked; void the invoice first to change them.

What the customer gets

If Email When Jobs Ship is on for the customer, the customer's contacts get an email per job with the shipment number, carrier and tracking, "(partial; 140 to follow)" when more pieces are coming, and a link to the shipment in the customer portal. Portal users see the shipment, print the packing slip and open their certificates under Certificates.

The shipped email names each job with the customer's PO, gives the ship date as a date ("Oct 23, 2026"), links the tracking number to the carrier's tracking page and attaches the shipment's certificates of compliance as PDFs, so a receiving dock without a portal login has the paperwork. Replies go to the shop.

Customers, parts, quotes and pricing

Sales in Amp-Hour is two screens: Customers, with their parts under them, and Quotes. The part record holds the price, the finish and the thickness tolerance, so a quote, a job and an invoice all start from the same numbers.

Customers

Sales > Customers lists every customer with code, name, city, state, phone, terms and active flag; its Parts tab lists every part, with chips for All and Samples and, for the office, Needs rebuild (parts still on an old process line) and Needs pay (parts with a polishing step that has no pay), each with the reason and a link to the part. The customer record carries billing address, a separate Ship-To Address, phone and email, Terms (days), Credit Limit, Tax Exempt, Industry and Sales Rep, plus the switches that drive the rest of the system:

Cert of Compliance Required
On by default. Shipping issues a cert per job for this customer.
No partial shipments
Off by default, so the finished pieces of a job can ship while the rest is still being worked. Ticked, the customer's jobs ship only when complete, all their finished pieces in one shipment.
Default Packing Instructions
Used on the traveler and packing slip when a part has none of its own.
Shipping instructions
Carrier account, dock hours, labelling, ASN or portal links, who to call. Shown wherever shipping and receiving happens: the Ship page, the shipment, the packing slip, the job and the receive form. Pasted links become clickable; the customer page shows the text under its own heading.
Customer Portal Access
Lets invited contacts sign in to see their jobs, certs, invoices and quotes.
Email When Jobs Ship, Email Invoices
Send the shipment notice and the invoice to the customer's contacts.

Custom fields added under Settings > Fields appear on the customer form as Additional fields.

The customer page opens with one line for the record itself: code, name, phone and email. The record is set up once and rarely changed, so its fields stay folded until you click Edit details; the page remembers whether you left them open. Below are a strip showing open balance and sales year to date (for administrators, managers and office staff), open jobs and parts on file, and buttons for Receive job, New quote and, for finance roles, Statement. A customer over its credit limit or with invoices more than 60 days past due shows a warning here. The customer's parts come next ("12 parts · 1 sample"), with part number, revision, description, process and, for those who see prices, price, a Sample badge on samples, a filter, New part and New sample, and the first ten shown (Show all lists the rest). Then Contacts (name, title, phone, email, primary flag), the Activity and follow-ups log, recent jobs with due date and status, and either invoices or quotes depending on your role. The accounting roles also get a Sales tax card: the customer's usual tax code, Tax exempt, and their exemption certificates with Add certificate (see Sales tax).

An activity is a note, call, email, visit, follow-up or complaint with a subject, notes, a follow-up date and a done flag. When a portal user submits a quote request it lands here as a follow-up activity, and everyone with an Office, Manager or Administrator role gets a notification.

Parts

Parts sit under Customers: the Parts tab of Sales > Customers lists every part with its customer, and each customer's page lists theirs. A part belongs to one customer and carries Part Number and Revision, Description, Material (from the materials master, which selects material-specific routing variants) and a material description such as 6061-T6, the Process / finish (the price, the specification and the certificate wording; the steps jobs get come from the part's own traveler, or from this process when the part has none), Customer Price, Price Unit and Minimum Lot Charge, thickness min, max and unit, Thickness Readings Required, surface area (in² per piece, which gives travelers and loads their ft² and amps) and weight per piece, drawing revision, masking and special instructions, pieces per rack, a Barrel Plated flag, the packaging fields, a Precious Metal Factor and a part image.

Thickness readings required decides whether the QC steps of the part's jobs need thickness readings before sign-off; some jobs do not. The form ticks it when a thickness range is typed on the part (untick it if readings are not needed), and choosing a process that carries a range does not tick it. A job copies the box when it is received, so changing the part later leaves jobs already in the shop as they were; the job's own box can be changed from its Edit form.

On the part page the part's own fields fold under one line (part number, revision, description, process and price) as they do on a customer; the traveler and Save stay in view. The page shows the image, a Racks card (below), a Documents card and a job history for that part number with customer PO, quantity, received and due dates and status. Customers and parts import from CSV under Settings > Data; the parts file can name each part's rack in a rack_code column, and the part is linked to that rack (as its usual rack when it has none). A rack code that is not found, or a retired rack, is an error for that row, and nothing in the row is written. A customer cannot have the same part number and revision twice: saving a second one is refused with "Part 1234 rev A already exists for this customer". A part number belongs to one customer: the part form checks the number as it is typed and says "Part number 7740-201 already belongs to AERO – AeroDyn Components. Part numbers can't be shared between customers." under the field, with a link to that part, and Save is refused the same way (also for Convert to part, a quote line that would add the part, and a CSV import row). Shops that already had a number under two customers keep both parts; either can still be edited as long as its number and customer stay the same.

Every customer and part field in the app is typed into: a few letters of the code, name, part number or description narrow the list under it (arrow keys and Enter, or a tap on a phone), and a long parts list shows the first 50 until you type more. Each part in the list names its customer ("7740-201 rev A · AERO"), and a number typed without its dashes still finds it. Text that matches nothing stays as typed with a note under the field, and Save stops there until it is corrected; on a quote line, a part number that is not a part yet goes to the line's New P/N instead.

Documents holds a part's prints and drawings, photos of the part, specs and anything else, as many files as needed. Upload several at once or drop them on the card; each is a Print/drawing, Photo, Spec or Other (picked under Upload as, or worked out from the file: pictures are photos, PDFs and DWG or DXF files are prints) and can be renamed or retyped from its menu. Pictures show as thumbnails and open in place, PDFs open in a new tab, and chips filter by type. Everyone who may open the part sees and downloads its documents, the floor included; the office adds, renames and deletes them. They count against the shop's storage like the Library's files (Library).

The racks a part runs on

The Racks card on the part page lists the racks, barrels and fixtures the part runs on, its usual rack first. Each one shows:

  • the rack's photo, its code (a link to the rack's page) and description, a "usual rack" badge, "retired" when the rack has been retired, and a badge when it needs recoat or repair;
  • the pieces of this part on that rack: "24 pcs on this rack" ("in this barrel" for a barrel), or the part's pieces per rack, marked "(part's pieces per rack)", when the link has no count of its own; then what the rack holds and its type;
  • the racking notes: which way up, where the contacts go, what to mask;
  • How it goes on: the racking photos, which open full size when tapped.

Administrators, managers, office and QC link racks. Link a rack asks for the rack, typed by its code (racks already on the part and retired racks are not listed, and New… adds a rack there and then), the pieces on that rack (blank uses the part's pieces per rack), the racking notes and Usual rack for this part. The first rack linked is always the usual one, and receiving fills in the usual rack. Make usual moves it to another rack, Edit changes the pieces, notes or usual rack, and Unlink takes the rack off the part and deletes its racking photos with it: "Unlink rack RK-AN-02? It comes off part 7740-201 rev A, and its 2 racking photos are deleted with it. The rack and its own photos stay." When the part's jobs used racks that are not linked yet, the card lists them, "Used on this part's jobs: RK-AN-01 (5 jobs)", each with Link. A rack can also be linked from its own page, with Link a part.

Racking photos are taken where the part is racked. On a phone, Take photo opens the camera and Choose photo picks a picture already on the phone; a computer has Add photo. Operators add them too, on this card or on the shop floor job card, and can remove the photos they added; administrators, managers, office and QC can remove any. The job page, the printed traveler and the shop floor show the job's rack with its racking notes and photo (see Jobs, travelers and routings). A role without Production sees the card without the racks' own photos, and the rack codes are not links.

Samples

A customer often sends a few pieces to try a finish before the order comes. New sample, beside New part on the Parts tab and on the customer's page, makes a part marked Sample with every field a part has: its traveler, documents, price and packing. The part number can be left blank until the customer gives one; the sample is then numbered SMP-1, SMP-2. Sales > Quotes has Quote sample, which makes the sample and opens a quote with it on the first line.

The sample's page says where it stands: "Sample · Quoted. When the customer approves it, use Convert to part." (New, Quoted, Running, Shipped, Now a part or Closed), with Quote, Receive sample job and Convert to part at the top. A sample job is an ordinary job with a Sample badge on the job list, the job page and the traveler. Convert to part asks for the customer's part number and revision (required while it is still an SMP number) and turns the same record into a production part: its traveler, pay, documents, quotes and jobs stay with it, and the jobs already run keep their Sample badge. Customers with portal access can follow their samples there.

Pricing

Prices are per unit, and the unit is one of each, lb, sqft, sqin, lot, rack, barrel or hour. Each line also has a minimum lot charge; the extended amount is the greater of quantity times price and the minimum. Prices are seen and set by administrators, managers and office staff; anyone else who can open quotes and parts sees them without prices, and a quote QC edits keeps its prices. The lookup order is the same everywhere a price is needed:

ValueTaken fromFalls back to
Unit priceCustomer Price on the partDefault Price on the process
Price unitPrice Unit on the partPrice Unit on the process
Minimum lot chargePartProcess
Thickness min, max, unitPartProcess
Thickness readings requiredThe part's boxNo part: required when the job has a thickness range

Picking a part on a quote line or on Receive job fills these in; you can still type over them for that quote or job. For finishes on a precious metal, the part's metal factor and the daily metal price add a surcharge line at invoicing. That is covered under Precious metals.

Quotes

Sales > Quotes lists quotes with customer, date, valid-until date, line count, total and status, with tabs for All, Draft, Sent, Accepted, Converted and Lost. New quote asks for the customer, an Attention name and a Valid until date, which defaults to 30 days out. Each line has:

  • Part: an existing part number for that customer, or New P/N with a typed part number and description.
  • Process, quantity, price, the per unit, minimum charge and lead time in days (default 5). A part with its own traveler needs no process; its line prints "Per part traveler". A sample's line carries a Sample badge.
  • Extended, computed as you type, with the quote total at the bottom.

Choosing an existing part fills the process, price, unit, minimum charge and description from the part. On a new-part line, choosing the process fills the process defaults. Notes and terms print on the quote. Status is set by hand to Draft, Sent, Accepted or Lost, or by the customer's answer in the portal. When the customer's place has sales tax, the quote shows the estimated tax and the total with tax to the roles that see prices (see Sales tax).

Print produces the Quotation (form PO-QTE-01) with quote number, dates, customer address and the line table with process and specification, price per unit, minimum lot charge, lead days and extended amount. A standing note says that precious-metal prices are based on the metal price on the quote date and that a surcharge applies when the market price exceeds the base.

Email (for the roles that see prices) sends the quote to the customer's contacts: To and Cc, a subject and a message you can change, the quote as a PDF attached (with a See it preview) and, when the customer uses the portal, a link to it there. The quote lists the emails sent from it. A customer with portal access can accept or decline a sent quote there (see Customer portal); the office is notified, and an Answered in the portal card on the quote shows who answered, when, their PO and their note.

Emailing a Draft quote marks it Sent: the send shows in the quote's Emails sent list, and the customer's portal users are told in the portal, without a second email to anyone the quote just went to. A send that fails leaves the quote a Draft.

Settings > Email wording sets the subject and the opening paragraph of every email the shop sends, from the quote, invoice and certificate emailed by hand to the automatic statements, receiving and shipment notices and payment reminders. Placeholders such as {number}, {total}, {due}, {customer} and {po} are filled in from the document; a preview shows the email before you save, an unknown placeholder is refused, and Reset to default brings back the built-in words.

Convert a quote to jobs

Convert to jobs opens a dialog where you enter the customer PO (filled in from the customer's acceptance in the portal, when there is one), tick the lines the customer ordered and set the quantity received for each. Every ticked line becomes a job at the quoted price, unit, minimum charge and lead time, with the line description carried into the job notes. A customer over its credit limit, or with invoices more than 60 days past due, gets a warning after converting; the jobs are still made. A line quoted for a new part number creates the part on the customer's part master with the quoted process and price, so the next order for that part is already priced.

While some lines are still unconverted the quote shows Accepted; once every line has a job it becomes Converted, is read-only and can only be printed. Converted quotes cannot be deleted; any other quote can be deleted from its page.

Reports

Analysis > Reports has Sales by customer, Sales by process, Job profitability and On-time delivery, each with a date range and CSV export.

Customer-owned stock

Some customers send bulk parts to be held at the shop and then release a quantity at a time with a purchase order. Tick Customer stock held here on the part. The part page then shows a Customer stock card with the pieces on hand, a Receive stock button for each shipment from the customer (quantity, their packing list or PO number, a note) and an Adjust button for count corrections and pieces returned to them, with the history of every movement, who recorded it and which job drew it.

Sales > Customer stock lists every stocked part with customer, pieces on hand, open job quantity and the date of the last receipt, with a Receive button on each row.

On Receive job, choosing a stocked part shows the balance on hand and a Draw from customer stock box, ticked by default. Saving the job takes its quantity out of the balance and the job page shows Drawn from customer stock. If the quantity is more than is on hand the job is refused with the shortfall; you can receive the missing stock first, untick the box, or confirm and let the balance go negative until the next shipment arrives. Editing the job quantity moves the draw with it, splitting a lot divides it between the two jobs, and cancelling the job puts the pieces back.

Chasing, copying and answering quote requests

The Quotes list says how long each Sent quote has waited ("Sent 9 days ago") and marks an open quote past its Valid until date Expired. The dashboard's Needs attention has a Quotes group: quotes Sent and not answered for seven days or more, and quotes whose Valid until date is within the next seven days (a Sent one stays listed once it has expired). Chase opens the quote, which says how long it has waited and offers Email again and Mark lost. Show all under the group opens the Quotes list's To chase tab, which lists every one of those quotes with the soonest to expire first.

Copy to new quote, on any quote including a converted one, makes a Draft dated today and valid 30 days, with the same customer, Attention, lines at their quoted prices and notes. The print view of a Draft quote has Mark as sent for a quote that went out on paper or by your own email; it sets the quote to Sent and tells the customer once, as choosing Sent on the quote does, and the print view asks again after printing while the quote is still a Draft. Convert to jobs opens the new jobs' travelers ready to print.

A quote request a customer sends from the portal appears under the customer's Activity and follow-ups with Quote this. It opens New quote with Attention set to the person who asked and the request's subject and details in Notes; saving the quote marks the request done.

The customer page shows Open quotes (Draft, Sent and Accepted, with the total, when each was sent and whether it has expired) beside Invoices for the roles that see prices. Print price list on the customer's Parts card prints every active production part with its revision, description, process, price per unit and minimum charge, dated today; a part with no price of its own shows its process's price, marked. On a part's own form, once a process is chosen the empty price, minimum and thickness boxes show the process's values in grey and a line under the process says them ("From process: $4.50 / each · min $150.00 · 50–100 µin"), so a blank is a deliberate fallback.

Outside processing

Polishing, heat treat, NDT, paint: some steps leave the building. In Amp-Hour an outside step is an operation on the routing like any other, with a vendor, a lead time and a cost. Sending pieces out writes the PO and prints the packing list; receiving them back counts the pieces in. A step can go out in several trips, as pieces reach it.

Mark a step as outside processing

On a process routing under Setup > Processes, each step has an Outside processing checkbox. Ticking it exposes three more fields:

Outside vendor
The vendor from the Vendors master who normally does this step.
Vendor lead time (days)
Sets the expected return date when the lot is sent out.
Vendor cost per piece
Goes on the purchase order the send-out creates. Seen and set by administrators, managers and office staff only.

When a job is received the routing is copied onto it, so the step shows an "outside" badge with the vendor name on the job page, and the printed traveler marks it (OUTSIDE: vendor) with the lead time and the standing instruction to print the vendor slip, count out, record the PO, count in on return and send rejects to NCR. Vendors are kept under Shop setup > Vendors with address, phone, terms and a default expense account.

Send the lot out

On the job page an outside step has a Send out button in place of Start and Complete, shown while pieces are waiting at the step. The dialog asks for:

  • Vendor, preset from the routing.
  • Quantity sent, preset to the pieces waiting at the step: those the step before has passed on and no earlier trip has taken. Send fewer and the rest go on a later trip.
  • Expected back (days), preset from the vendor lead time.
  • Vendor cost per piece, for administrators, managers and office staff; a send-out by QC uses the step's stored cost.
  • Instructions to vendor, which print on the vendor slip.
  • Create a purchase order for this work, ticked by default.

Send and create PO records a trip (the date, quantity and expected return), stops the sender's labor on the step, and creates an open PO on the vendor with one line for the work, the quantity, the unit cost and the vendor's expense account. The PO is linked to the job and is listed under Accounting > Payables > POs like any other. The step lists each trip under it: sent, PO, pieces back, rejected, short, and how many are still out, with Slip and Receive buttons per open trip and "N not sent yet" for the pieces still waiting. The job header shows an "at vendor" badge, and on the Schedule board the step sits in the At vendor lane with the vendor name and the return date while all its pieces are out. A job on hold, cancelled or shipped cannot be sent out.

Vendor packing list

After the send-out the Outside processing packing list (form PO-OSP-01) opens for printing; it is also available from the Vendor slip button on the step and the Slip button on the Outside processing page. It carries the job number as a Code 39 barcode and a QR code, a ship-to block with the vendor's address and phone, a return-to block with your company name, job number and PO number, the date sent and expected back, your customer and their PO, lot or heat number, then one line with part number and revision, description, material, the work required (the operation name, its routing instructions and your instructions to the vendor), the quantity sent on this trip (with the lot size when it is part of it) and a blank Qty back cell. Each trip prints its own slip. A handling block repeats the part's masking requirements and the material's processing notes, says not to mix with other lots and to return every piece including rejects tagged, and names the next operation on return. Sign-off cells are Counted out by, Carrier / driver, Received at vendor, Counted in by and Date back.

Track what is out

Production > Outside processing lists every trip at a vendor, oldest expected return first, with the job and priority, customer, part number, operation and your instructions, vendor, PO number, quantity sent, how many are still out, date sent, due back and the job's own due date. The subtitle counts the trips and pieces out and how many are overdue; an overdue return is flagged in red. Each row has Slip and Receive buttons; Receive opens the job with that trip's receipt. The History tab shows every trip, with the quantity returned.

The same lots appear on the Dashboard under Outside processing and maintenance with how many days late they are, and in the At vendor lane on the Schedule board.

Receive the lot back

Receive on a trip opens a dialog that states what is out, with whom and since when, and asks for Quantity returned (preset to what is still out), Rejected at receipt (no more than were returned), a reject reason code, a disposition (Rework, Scrap, Return to vendor, Use as is), More to come, and notes such as the vendor's packing list number. Receive then:

  • Records the good pieces (returned less rejects), which wait at the next step at once.
  • Adds the returned count to the PO line. Without More to come the trip closes and the PO is marked Received, so Payables can enter the vendor's bill against it; with it the trip stays open for the rest.
  • Writes any rejects to the reject log against this step with the reason and disposition.
  • Warns you if a closing receipt is short of what was sent: the shortfall is written off as lost, and the step can finish.

The step is done once every piece that can reach it has come back (good, rejected or lost) and the step before it is done. Office roles can undo a receipt from the step's portions list: the trip reopens with those pieces out again.

Cost

The vendor's bill, entered from the PO under Payables, carries the job number on its lines. Job costing on the job page shows it as Outside processing next to labor, overhead and chemicals, and the Job profitability report has an Outside column.

Maintenance

Maintenance tracks what is broken, what is down and what is due. Anyone can report a problem against a piece of equipment or a tank; the work order carries the downtime, the labor and the parts, and a PM raises its work order once it comes due by the calendar or by a meter, checked every hour and again the next time anyone opens Maintenance. Calibration keeps the gauges and the process instruments in tolerance, and shows what an out-of-tolerance instrument touched.

Report a problem

Maintenance > Work orders has a Report a problem button, and the same form is on every equipment page and tank page under Maintenance history. It asks for one line on what is wrong, the Equipment or the Tank, a type (repair, PM, inspection, safety, improvement), a priority (low, normal, high, urgent), who to assign it to, a Needed by date and details. The last checkbox, "The asset is down now", marks the equipment or tank out of service and starts the downtime clock as the order is created.

Any login can report a problem. An urgent order gets a due date of today and a notification to every manager and administrator; a high priority order is due in two days. Assigning the order notifies the person it went to.

Work orders

The Maintenance page opens with a strip of counts: Open, Urgent, Down now, PMs due in 30 days and Downtime hours in the last 30 days. If anything is down, a red banner names the asset and the order, with the time it went down. Tabs split the list into Open, Mine (assigned to or reported by you), Waiting on parts and Done. Each row shows the WO number, priority, the problem with its type, reporter and date, the asset, who it is assigned to, due date and status. A side card lists the most worked assets over 90 days with the number of orders, downtime hours and parts cost.

StatusMeaning
OpenReported, nobody assigned.
AssignedSomeone is named on it. Set when a person is assigned.
In progressStart work was pressed; the start time is recorded.
Waiting on partsSet by hand from Edit.
DoneCompleted with a resolution.
CancelledStays in the history as cancelled.

Work the order

The work order page shows the problem and details, assignment, Needed by, the PM template it came from, start and completion times, the resolution, labor minutes and downtime. Buttons along the top:

Start work
Sets In progress and assigns the order to you if nobody else is on it.
Mark down / Back in service
Runs the downtime clock. Down sets the equipment or tank status to out of service; back in service returns it and adds the elapsed minutes to the order. An out-of-service tank blocks operators from starting a run in it.
Issue parts
Issues a stock item and quantity from Inventory to the order at weighted-average cost; the parts are listed on the order, with their cost for administrators, managers and office staff. In the books they post to Repairs & maintenance.
Edit
Title, type, priority, assignment, due date, status, labor minutes so far, details and the checklist.
Complete
Asks what was done and the labor minutes. A repair needs a resolution. Completing while the asset is down ends the downtime and puts it back in service.
Cancel
Office roles only. An order with parts issued cannot be deleted, only cancelled.

A checklist is one item per line. Ticks save as you go, so a technician can work through it over a shift. Completing a PM with unticked items is refused unless you tick "Complete anyway", in which case the skipped items are noted in the resolution. The reporter is notified when the order is done.

Every completed order on a piece of equipment writes an entry to that equipment's Analysis and maintenance log, and a completed PM sets the equipment's Last Maintained and Next Maintenance Due from its maintenance interval.

PMs

Maintenance > PMs holds the PM templates, with tabs for PMs, Late and Plan. A template names the task (rectifier cooling fan and filter, anode basket inspection, heater and thermostat check), the Equipment or Tank, Every (days), Next Due, estimated minutes, who to assign it to, a checklist and notes. Due by sets how it comes due: by the calendar, by a meter, or whichever comes first. A tank's meters are its own amp-hours and hours run; equipment meters (run hours, cycles, amp-hours) are typed with Read the meter on the equipment page, which also shows the readings. A meter PM has its step ("every 50,000 amp-hours") and the reading it counts from.

When a PM comes due, by date or by meter, it becomes a work order of type PM, titled with the task and the asset code, carrying the checklist with every item unticked, assigned to the named person and due on the template date. The server checks every hour, and opening Maintenance checks too, so the order appears the next time anyone opens Maintenance if the hourly check has not raised it yet; Raise due PMs now does it at once. A template that is already overdue creates its order at high priority. Only one open order exists per template at a time. The person it is assigned to (administrators and managers when nobody is named) is told once when it is raised and once if it goes late. Completing the order moves Next Due forward by the interval and starts the meter count again from the reading at that moment.

Late lists the open PM orders past their due date and the PMs due with no order yet. Plan shows the calendar PMs of the next 30, 60 or 90 days by week, with the estimated minutes per week, and where each meter PM stands.

Equipment and tank pages show the PM schedule for that asset, its work order history and downtime over 90 days. Maintenance > Equipment is the asset list, with the calibration and maintenance due dates of each gauge, rectifier and oven.

Calibration

Maintenance > Calibration is the register of every instrument followed for calibration: overdue and failed first, then due soon, then by due date. Chips pick Overdue, Due, Failed, Process instruments, Standards, or Gauges and meters. Counts across the top give the instruments overdue or failed, due within the reminder window, the process instruments, the out-of-tolerance reviews still open, and what the calibration checks are set to. Work orders says when any instrument is overdue. Print labels prints a small label for each ticked instrument, or for all of them: the ID, the calibration date, the due date and who calibrated it, on 2.4 × 1 in label stock or plain paper. The Calibration card on an equipment page, and each calibration record, have a Label button too.

Setting up an instrument

Open the gauge, meter or controller under Equipment; its Calibration card has Set up:

Kind of instrument
A measuring instrument (thickness gauge, XRF tester, micrometer, thermometer, pH or conductivity meter, balance, hardness tester, surface tension meter, salt spray or humidity chamber), a process instrument (tank temperature controller, thermocouple or RTD, rectifier ammeter or voltmeter, shunt, amp-hour meter, process timer, oven controller or chart recorder), or a reference standard (foils, weights, buffers, a reference thermometer).
Sits on
Nothing for a hand instrument, a tank, or a rectifier or oven entered as equipment.
Calibrate every, next due
The interval in days, and the first due date. Each calibration sets the next one after that.
Tolerance and points
The tolerance in words ("±2 °F") and the points checked each time, each with its nominal value and its tolerance below and above, in the point's unit.
Outside lab
The lab that calibrates it, as a vendor if you like, and its ISO/IEC 17025 accreditation number.
Owner, reminder
Who gets the reminders, and how many days before the due date (14 unless changed under Settings > Quality).

Recording a calibration

Record calibration takes:

  • The date, and who did it: in house, or the lab with its accreditation number and certificate number.
  • The reading at each point as found and as left. A blank as left means it was not adjusted. Each point says at once whether it is in or out of tolerance.
  • The standard used, from the register or typed, with its certificate (its latest certificate when left blank).
  • The next due date (the date plus the interval, unless changed), the conditions and notes.

Attach the lab's certificate to the record after saving. Saving warns, without refusing, when the standard was itself overdue on that day, when an outside lab gave no certificate or accreditation number, or when there is no next due date.

Left in tolerance, the instrument's dates move on, and one taken out of use by a failed calibration goes back in service. Left out of tolerance, it is taken out of service and counts as overdue until it passes. Only the latest record moves the dates; one typed in late for an earlier date is kept but changes nothing. A record entered by mistake can be voided with a reason: it stays on file, and the dates go back to what they were. The old Log entry on the equipment page still records tank analyses, maintenance and repairs.

Process instruments

Temperature controllers and thermocouples on a tank, ammeters, voltmeters, shunts and amp-hour meters on a rectifier, process timers, and oven controllers and chart recorders sit in the same register, each linked to its tank, rectifier or oven. A rectifier or oven followed for calibration counts too. When a load, a step or a bake starts on a tank, rectifier or oven whose instrument is overdue or failed, the shop's setting decides what happens: warn (the default), block, or off. A load's page lists the overdue instruments on its tanks.

Out of tolerance: the impact list

When a calibration finds an instrument out of tolerance as found, administrators, managers and QC are told, and the record shows the impact list: everything that used the instrument since its last good calibration.

  • Thickness readings, QA tests, lab results and chrome surface-tension readings taken with it.
  • Loads and steps run in the tank, rectifier or oven it controls, and bakes in its oven.
  • Instruments it calibrated as a standard.
  • The jobs, and the certs issued after it was first used.
  • Each customer, with their jobs, certs and shipped jobs.

Open NCR opens one NCR for the event, or one per customer, naming the job when there is only one. Draft notice opens Email this to that customer: the message lists their jobs, POs, shipped quantities and certs, with a PDF. Mark reviewed records what the review found and closes it on the counts; it can be reopened.

Checks and reminders

A thickness reading, a QA result or a lab result entered with an instrument that is overdue or failed its last calibration warns (the default), or is refused when the shop blocks it under Settings > Quality; then an administrator, manager or QC can go ahead with a reason, which is logged. Each morning the server tells an instrument's owner (when it has none: administrators, managers, QC and roles with Maintenance) about the instruments coming due and those overdue, once per instrument and stage.

Where it surfaces

Urgent and overdue work orders and anything down are on the Dashboard under Outside processing and maintenance. Notifications for assignments, urgent orders, PMs due, calibrations due and completed orders go to the bell in the top bar and the Notifications page. The module can be switched off under Settings if your shop does not use it.

Environmental compliance

A plating shop answers to a wastewater permit, the hazardous waste rules and whoever inspects the SDS binder; a chrome shop also answers to the chromium electroplating air rule and OSHA's hexavalent chromium standard. Amp-Hour keeps those records next to the production records they come from, and flags the ones that are about to be late.

Compliance dashboard

Environmental > Compliance opens with six counts: wastewater samples in the last 30 days (with the last sample's date and point), open exceedances (and their tasks that are late), containers on the accumulation clock (with the oldest in days), manifests awaiting the signed copy, permit deadlines in the next 90 days and chemicals without an SDS. Each count links to its page. A Chrome card follows for chrome shops: the tanks overdue, due a re-test or due soon for a surface-tension reading and, for administrators and managers, Cr(VI) monitoring and exams due in the next 30 days; the same reminders lead the Quality and compliance list on the main dashboard. Record a sample is at the top, and a banner says so while no wastewater limit set is turned on. Below are the effluent pH of the last 30 days with the minimum and maximum read, the permit and report deadlines table, the containers on the clock with their days, and the chemicals missing an SDS.

Wastewater

Environmental > Wastewater keeps the self-monitoring the permit asks for, with tabs for Overview, Samples, Limits, Reports, Plant log, Sample points and Settings. The old discharge log's entries were copied in, and its old link opens this page.

Sample points are where samples are taken (final effluent, a clarifier outlet, a pretreatment step), each with its permit and whether it is a combined wastestream. Record a sample takes the point, the date and time, grab or composite (by flow or by time), who took it, the chain of custody number, the lab ("In-house" for your own screening), when it was shipped and received, the temperature on arrival, whether the preservation was right, the flow that day and notes. The lab's results go in a grid, then or when they come back: one row per analyte (pH, total chromium, hexavalent chromium, nickel, zinc, copper, cadmium, lead, silver, total and amenable cyanide, TSS, oil and grease, TTO, flow, temperature, or any other the shop names) with the value and unit, a qualifier (< below the reporting limit, ND not detected, J estimated, E above the calibration range), the detection and reporting limits and the method. A result analyzed after its holding time is flagged; the holding times are defaults to check against 40 CFR 136 Table II (verify), and they never block a result.

Limits holds limit sets from your permit: a daily maximum, a daily minimum (for pH), a monthly or 4-day average, and how a non-detect counts in an average. A set of the federal 40 CFR 433 numbers for existing metal finishers ships turned off, marked "check every number against your own permit" (local limits are often stricter; verify every number), and a banner says so until a set is on. Ticking Checked against our permit turns a set on in that person's name; changing any of its numbers turns it off again until someone checks it. Limits a shop had typed for the old discharge log became a set of their own, left on. Where several sets apply to a point, the stricter limit wins.

A result over a limit that is on is an exceedance: administrators, managers and QC are notified, and two tasks are made for the permit's responsible person, "Tell the Control Authority" due in 24 hours and "Resample and send the results" due in 30 days (both settings). A monthly average is a warning while the month is still running, and an exceedance once it is over. The Overview lists the open exceedances with Write what was done and Close. Every morning the server reminds people of exceedance tasks due or late, and of samples sent to the lab more than 14 days ago with no results. The pages flag results over a limit; they never say a shop is compliant.

Reports builds the month or the half year for one point or all: every result with its qualifier, the maximum and minimum, each month's average against its limit, the flow, and the exceedances, as CSV or as a PDF with the TTO certification statement and a signature block (Settings holds the statement, the signer's name and title). The PDF says it was prepared from the shop's records, to check against the permit before signing.

The Plant log is the treatment plant's own record: pH and ORP for each stage of the plant (the stages are a setting), the filter cake, the chemicals used, issued from Chemical inventory to the waste treatment account, and notes. Voiding an entry puts the chemicals back.

Hazardous waste

Environmental > Hazardous waste has two tabs, Containers and Manifests.

Container
Label or ID, waste stream (F006 WWT sludge, spent plating bath, spent acid, spent caustic, cyanide waste, chromium waste, filter cartridges, contaminated PPE and rags, used oil, universal waste, other), contents, EPA waste codes such as F006, D002, D007, container size (55 or 30 gal drum, 5 gal pail, 275 gal tote, roll-off), Accumulation Start Date, storage location and status.
Status
Accumulating, full or shipped. The days on the clock count from the accumulation start; a container shows amber past 60 days and red past 75.
Manifest
Manifest tracking number, ship date, transporter, designated facility (TSDF), waste description and codes, quantity and unit, disposal cost, and whether the signed copy has come back.

Ship on a manifest opens a form for the manifest details and lists every container on site with the full ones pre-ticked. Recording it marks the ticked containers shipped and links them to the manifest. The Manifests tab shows each manifest's signed-copy state: Awaiting, or Overdue with the day count once 35 days have passed without the facility's copy, with a Mark received button that stamps today's date.

Permits

Environmental > Permits holds permits and registrations: wastewater discharge, air, hazardous waste (EPA ID), storm water, fire and hazmat, business license, Nadcap, ISO / AS9100, ITAR or other, with the issuing agency or registrar, permit number, issued and expiry dates, how many days before expiry to start renewal (default 90; a note for the person responsible, since the dashboard flags every permit 90 days out), reporting frequency (monthly, quarterly, semiannual, annual), the next report due date, the responsible person and the permit conditions. A permit expiring within 90 days or a report due within 30 days appears on the dashboard. Permits import from CSV under Settings > Data.

Safety data sheets

Environmental > SDS lists every inventory item in the chemical, precious metal and anode categories with its location and SDS. An SDS can be a link to the supplier's sheet (the SDS Link field on the item) or a PDF or image uploaded on this page, up to 10 MB. Items with neither show a red "missing" badge and are counted on the dashboard.

Chrome tanks: the surface-tension log

Environmental > Chrome surface tension keeps the log the chromium electroplating NESHAP (40 CFR 63 subpart N) asks of hard and decorative chrome and chromic acid anodizing tanks that meet it with a fume suppressant; tanks on a control device only are not tested this way. Every limit and schedule below ships as a setting, set from the rule as we read it, which is not legal advice. The page shows a Verify banner until an administrator or manager ticks that they checked the numbers against the shop's permit and the current rule; changing a number clears the tick.

Tanks on the log
Add each chrome tank that uses a fume suppressant, with how it meets the rule (fume suppressant, control device or both), the permit and the permit condition, its own limits where the permit sets different ones, the instrument usually used, where its hours of operation come from and the date monitoring started. Untick On the log for a tank taken out of service for good; a tank not in service gets no reminders.
Readings
In dynes/cm, by stalagmometer or tensiometer, with the time, the temperature, the instrument and a note. A stalagmometer reading can be worked out from the drops of DI water and of the sample and the bath's specific gravity. The limits ship as 40 dynes/cm by stalagmometer and 33 by tensiometer (verify against your permit); a reading at the limit passes. A reading over the limit asks for the corrective action, sends the tank back to the first monitoring step, makes a re-test due at once and tells administrators, managers and QC-level people (the Lab technician included). Until a passing re-test, starting a job step or a load in that tank is refused; an administrator or manager can start it anyway with a reason, which is recorded.
When a reading is due
By hours of tank operation, not calendar days. The steps ship as every 4 hours, then every 8 hours after 40 hours without a reading over the limit, then every 40 hours after 40 more (verify against 63.343(c)(5) and your permit). A new bath goes back to the first step, as does a reading over the limit, and the hours until a passing re-test do not count. A reading taken later than its interval starts the count of clean hours again at the same step, which is the cautious reading of the rule (verify).
Hours of operation
One of three sources per tank: its weekly schedule in shop time, with the days it ran other hours or did not run (a shift past midnight included); an hour meter, read on its own or with a reading; or the runs and loads recorded in the tank. A tank's page shows the hours since the last reading and when the next one is due.
Missed readings
Checked every 10 minutes: a warning in the hour before a reading is due, an alert at the due time, and again every 24 hours (a setting) while it is still missing, to administrators, managers and QC-level people; operators are not told. Each notice goes out once.
The record
A reading is never deleted: a wrong one is voided with a reason by an administrator or manager and stays on the log marked void. Corrective-action notes and changes keep who and when. Records are kept 5 years by default (a setting; verify). The log, a summary for a period (readings, readings over the limit, late readings, hours and corrective actions) and the fume-suppressant additions download as CSV in shop time; each fume suppressant can be marked PFOS-free or not.

Anyone with Environmental compliance records readings. The Lab technician, who has Tanks but not Environmental compliance, records them from the tank's own surface-tension page. Setting up tanks, the settings and voids are for administrators and managers.

Hexavalent chromium: exposure and medical records

Environmental > Cr(VI) exposure keeps the exposure monitoring and medical surveillance records of OSHA's hexavalent chromium standard (29 CFR 1910.1026). It is for administrators, managers and the EHS coordinator role only, and the server refuses everyone else. The EHS coordinator role is added once, the first time the page is used: manager level, with Environmental compliance and the time clock. Like the surface-tension log, every figure here is a setting with a Verify banner until someone ticks that they checked it against the current standard.

Exposure results
Per employee and task: sample date, area, kind of sample (personal, area or objective data), minutes sampled, the result as an 8-hour TWA in µg/m³ (or below the reporting limit, or not detected), method, lab, why it was taken and whether a respirator was worn. Each result is shown against the action level of 2.5 µg/m³ and the PEL of 5 (verify). The next monitoring date is worked out: 6 months on at or above the action level, 3 months above the PEL, and none after two results below the action level at least 7 days apart (verify); a date typed in wins. The date the employee must be told is worked out as 15 working days after the result comes back (verify), and the date they were told is recorded.
Medical exams
Exam date and kind (initial, periodic, emergency, termination, symptoms or other), the physician or clinic, when the written opinion was received and when it was given to the employee, where the medical file is kept, and the next exam, 12 months on (verify). The opinion is due 30 days after the exam and to the employee within 14 days of receipt (verify). Keep only dates and the written opinion here; test results and diagnoses stay with the clinic. A person with a result at or above the action level in the last 12 months and no exam on file shows "Offer an exam".
Reminders and records
A daily check tells administrators and managers about monitoring and exams due within 30 days or overdue, and results the employee has not been told yet. Records are voided with a reason, never deleted. Lab reports and written opinions can be attached as files. Both lists download as CSV. Exposure records are kept 30 years and medical records for the length of employment plus 30 years (29 CFR 1910.1020; verify).

Retention and roles

The hazardous waste page states the three-year retention that applies to its records. Wastewater records stay in the shop's database with everything else; how long they must be kept is in your permit (often three years; verify). The chrome records' retention is above. Samples, results and the plant log can be recorded by any staff login with the module; limit sets and the wastewater settings are for administrators and managers; recording manifests, marking copies received, voiding samples and results and uploading SDS files need an Office, QC, Manager or Administrator role. Every action is in the audit trail under Setup. Shops that do not need the module can switch it off under Settings, which removes the Environmental group from the menu.

Inventory and purchasing

Inventory is what is on the shelf: chemicals, anodes, salts, masking, packaging and supplies, each at a weighted-average cost. Purchasing is the POs that bring stock in, the receipts against them and the vendor bills that follow.

Items

Chemical inventory, under Lab, lists every item (chemicals, and the anodes, masking and supplies too) with its on-hand quantity, what it comes in, the reorder point, unit cost and location. Costs and values are shown to administrators, managers and office staff only; for QC, operators and lab technicians the server leaves them out. Open one for the fields below and its transaction history.

SKU and name
The SKU prints on PO lines and tank addition records.
Category
Chemical, anode, masking, rack/fixture, packaging, supply or precious metal.
Unit of measure
The unit stock is counted and costed in: gal, lb, kg, L, ea, tr oz. Every quantity on the item is in this unit; tank makeups and additions convert into it.
Comes in
The container it arrives in, such as 55 gal drum or 50 lb bag, shown beside the unit ("comes in 55 gal drum"). Quantities and cost stay in the unit of measure.
Weight per gallon
For liquids, in lb/gal from the label or SDS (sulfuric acid 93% is about 15.3). It lets a tank makeup or addition written by weight take stock counted in gallons, and the other way round. Without it, such a line is refused rather than taken out in the wrong unit.
Qty on hand
Entered once as an opening balance, which posts to the books (inventory against opening balance equity). After that it changes only through transactions; a CSV import that updates an item leaves its quantity alone.
Reorder point and reorder qty
Drive the reorder report and the quantity on an automatic PO.
Unit cost
The weighted average, recomputed on every receipt.
Preferred vendor, location, SDS link
The vendor is who the reorder report buys from. Chemicals and precious metals without an SDS link are flagged on the Compliance page.

Receiving, issuing and adjusting

The item page shows On hand, Average cost and Value, then the transactions: date, type, quantity, cost, the job or PO referenced, notes and who posted it. Three buttons post transactions, and each posts its journal entry.

  • Receive takes a quantity, a unit cost and who will bill it, and recomputes the average: (on hand × old cost + received × new cost) ÷ new total. It posts inventory against goods received not invoiced, which the vendor's bill clears. Administrators, managers and office staff receive, since it changes what the stock is worth in the books.
  • Issue takes a quantity and an optional open job. Issued to a job, the value lands in that job's materials cost; left as "Shop use / tank add", it is expensed without one. Any staff login can issue. Each issue posts a journal entry: debit chemicals and supplies expense, credit inventory.
  • Adjust takes a signed quantity for a count correction and posts the matching entry. Administrators, managers and office staff only.

Tank additions issue stock without a visit to this page: post an addition on a tank, or mark an add request done, and the quantity is issued with a note naming the tank and the reason. An addition that takes stock below zero still posts, and says so ("2 gal on hand, 3 gal added; stock is now -1 gal"). A tank's makeup chemicals are picked from this list too: Make up new bath checks there is enough of each for a full tank and issues them. See Tank chemistry.

Reorder report

The Reorder report lists every active item at or below its reorder point, grouped by preferred vendor, with on hand, reorder point, quantity already on open POs and an order quantity (the reorder quantity, or twice the reorder point minus on hand when none is set); the Dashboard shows the same low-stock list. Every row is ticked except those already on order; change the quantities, and Create purchase orders raises one open PO per vendor with the ticked rows at the current cost. Items with no preferred vendor sit in a last group with a vendor pick per row (New… adds a vendor on the spot); the vendor chosen there is kept as the item's preferred vendor.

Ordering per vendor

Three places order from one vendor. The reorder report, above. The vendor page (Shop setup > Vendors > a vendor) shows what the vendor supplies with rows below the reorder point highlighted and a button that orders those at once, its open purchase orders, its open bills, the outside-processing steps routed to it and a Documents card for the W-9, certificate of insurance, contracts and price lists; New purchase order opens the PO form with the vendor set. On the PO form the stock-item list puts that vendor's supplies first under their own heading, and Add items below reorder point adds its low items with their reorder quantities.

Purchase orders

POs live under Payables with tabs for Open, Received, Closed, Cancelled and All. New PO asks for the vendor, an expected date, an optional open job when the PO is for outside processing, and lines. A line is a stock item, which fills in the description, cost and reorder quantity, or a non-stock description with its own quantity, cost and GL account. Sending a routing step to a vendor from the job creates its PO automatically; see Outside processing.

The PO prints as form PO-PUR-01 with the PO number as a barcode, order and required-by dates, vendor and ship-to addresses, the lines with quantities received so far, a total and an Authorized by signature line. It can be edited only while open with nothing received. The buttons on it:

ButtonWhat it does
ReceiveA line-by-line form with the outstanding quantity filled in. Stock lines go into inventory at the PO cost, posted against goods received not invoiced. The PO becomes Partial or Received.
Enter billShown when something is received and not yet billed. Takes the vendor's invoice number and date, and the vendor's amount for each received line (filled in at the PO cost). The bill clears goods received not invoiced at the value received; a different amount goes to purchase price variance. A fully received PO closes when billed.
CloseEnds an open or partial PO you will not receive more against.
Cancel POOnly while nothing has been received. A PO with receipts is closed instead.

Bills and payments

A bill is anything the shop owes: chemicals and outside processing, but also gas, water and sewer, rent, insurance, phone, waste hauling, repairs and services. Bills and A/P aging are for administrators, managers and office staff, and the payee is always a vendor record; a utility company is simply a vendor with no items, added from the Payee field's New… button. The Bills page has tabs for Purchases (bills against purchase orders or supplier invoices), General (everything else), Drafts, To approve, Paid, Void, All and Payments, with an Overdue filter on the open tabs and a paperclip on rows that carry a receipt.

Enter purchase bill takes the payee, one of its received purchase orders (the received, unbilled lines are billed, each with the vendor's amount: stock against goods received not invoiced, with any price difference to purchase price variance, and non-stock to the line's GL account or the vendor's default expense account), stock received without a PO and still waiting for a bill (ticked from a list) or typed lines with a GL account, an optional job for outside processing charges and the amount, the vendor's invoice number and dates; a due date left blank uses the payee's terms. Enter bill (a general bill, from the Bills page) takes the payee, an optional bill number (blank uses the date), the dates and lines of account, description and amount; the account is the category, so the list shows expense accounts first, grouped by type (Utilities, Rent, Insurance, Repairs & Maintenance, Office & Admin, Outside Processing…). Same as last bill from this payee copies the previous bill's lines for a recurring water or rent bill. Both forms take photos of the receipt or invoice before posting (the phone camera opens on a handset) and attach them to the new bill; the bill page shows them as thumbnails and accepts more. The same invoice number cannot be entered twice for one payee, and a line cannot be negative: money a vendor owes back is a vendor credit. When the shop has lines (QuickBooks classes), each bill line can name its line; left blank, it takes the job's line or the vendor's default line. A bill debits the line accounts and credits accounts payable.

Paying happens on the bill: Pay bill on its page, or Pay selected after ticking open bills from one payee. The payment takes the payee, date, the bank account it is paid from, the method (check, ACH, wire, card or cash), a reference number and the amount to apply to each open bill, debits A/P and credits that bank account. Paid by check, the check is either printed (it waits in the check register, numbered when printed) or was written by hand, with its number. Pay bills in the page head lists every open bill, or those due by a date, with the amount to pay on each (all or part of a bill); tick what to pay, pick the account and the method (or each vendor's own way), and it makes one payment per payee, using the vendor's credits and early-pay discounts, with Print the checks next for checks. Drafts, bill approvals, vendor credits, discounts, recurring bills, use tax and 1099s are on Payables, vendor credits and 1099s. Printing, reprinting and voiding checks are on Banking, checks and expenses. The bill page lists the payments applied to it; the Payments tab lists every payment with the bills it paid, takes a scanned check or remittance against each, and voids one. Voiding a payment asks why, reopens its bills, voids its check and posts a reversing entry (the payment stays listed as void, with the date, who and why); voiding an unpaid bill does the same. A/P aging buckets open bills by payee into Current, 1 to 30, 31 to 60, 61 to 90 and over 90 days past due, with a subtotal per kind, as of today or any past date; unused vendor credits show as negative rows in Current.

Vendors and reports

Vendors are set up under Shop setup with a code, name, address, phone, email, terms in days and a default expense account; the vendor page then shows what it supplies, its open purchase orders and bills, outside-processing steps and documents (see Ordering per vendor above). Vendors and inventory items import from CSV under Settings > Data. Two reports cover this area: Inventory valuation (on hand, average cost, value and quantity used in the period; for finance roles) and Chemical usage by tank (quantity and, for finance roles, cost per chemical and tank, by reason). Both print and download as CSV.

Chemical lots and certificates of analysis

Receive on an item, and Receive on a purchase order for each chemical or precious-metal line, take the Supplier lot from the label or packing slip and the Certificate of analysis, a PDF or a photo. The COA is kept with the receipt, and the transactions show the lot (linked to its page) and a COA link. A receipt posted without them shows Add lot or Add COA to the office, since the certificate often comes a day later; a new COA replaces the one on file, which comes off the receipt, so the receipt and the Library keep one current certificate. Once additions name a lot, its spelling stays as received. The same lot typed again in other capitals is the same lot.

A chemical's page lists its Lots on hand, oldest first, with what is left of each and the next to use marked. Additions and issues that name a lot take from that lot; stock used without a lot (an issue with no lot named, an adjustment, a tank's Add chemical) comes off the oldest lots first, so the lots never add up to more than is on hand. Issue can name the lot too.

Lots, at the top of Chemical inventory, finds a lot by its number, SKU or name. A lot's page is its trace for an NCR, an audit or a supplier's recall: what was received, when, from whom and on which PO, with the COA; how much is still on hand; every tank it went into, with the first and last addition and the total; and every addition from it, with the tank, date, quantity and who added it. An addition never takes more from a lot than the lot has left: the rest comes from the next lots, oldest first. If someone says it all came from the lot anyway, the page says more was added than received, so the office can check the receipts and the stock count. It prints.

Invoicing, receivables, ledger and time

The invoice is raised from the shipment, so what was shipped is what gets billed. Customer payments, bank deposits, credits and refunds, aging, statements and reminders, a double-entry ledger with a profit and loss for each line of the shop, the time clock and the reports are in the same system, so nothing is retyped into a second one. Bank accounts, checks and expenses have their own page (Banking, checks and expenses), as do payables and 1099s, sales tax, the payroll hand-off, reports, budgets and the month-end close and switching from QuickBooks.

Invoices from shipments

On the Ship page, ticking the invoice option raises the invoice with the packing slip and the cert. A shipment shipped without one shows a "not invoiced" badge in the Shipments list and an Invoice button on its page; the Invoices page has an Uninvoiced shipments button. Each shipped job becomes one line: job number, part number and revision, process and spec, pieces shipped, the billing quantity in the part's price unit, the unit price, and the minimum lot charge the first time a job is billed. A job priced per rack or barrel bills its racks (barrel loads) used, and one priced per hour the labor time recorded on it, shared over the pieces shipped. A job priced per lb, ft², rack or hour with nothing to measure (no weight, area, racks or time) is not invoiced at $0.00: the shipment goes, and the Ship page says what to enter before invoicing it. A rework job prints "REWORK, no charge". When the process carries a precious metal, a surcharge is computed from the price on the ship date; see Precious metals.

The due date is the invoice date plus the customer's terms. Sales tax is added for the place the parts go, or at the one shop-wide rate, unless the customer is exempt (see Sales tax). Each line's revenue goes to the process's revenue account. With Email Invoices on, the customer's contacts get the invoice itself in the email, in your invoice design, with a link to it in the portal; replies go to your billing email.

Amounts are in US dollars only. Invoices, payments, bills and the ledger all keep one currency, and multi-currency (billing a customer in euros or Canadian dollars, say) is not offered.

New manual invoice is for charges that are not a shipment: expedite fees, tooling, strip-only work, engineering time. It takes a customer, date, customer PO and lines with description, quantity, unit price and revenue account. When the shop charges sales tax, each line also has a charge type and a Taxable tick, the form can pick the tax place (otherwise it comes from the customer's address), and an administrator can leave tax off the invoice with a reason. Amounts can't be negative: money given back on an invoice is a credit memo (below). The same page lists the customer's billable expenses not yet invoiced (rush freight, special packaging) to tick and add; see Banking, checks and expenses.

The invoice page

Form PO-INV-01 prints with your business block, remit-to, bill-to and ship-to blocks, the invoice date, due date, terms and customer PO, the shipment with its date and carrier, the customer's packing list and your job numbers, the lines, subtotal, surcharge, tax (with the tax place and rate, each jurisdiction's share when there are several, and an exempt customer's certificate number), total, amount paid and balance due, then payment instructions, notes and your thank-you line. Above the document: Print / PDF (the print dialog also saves a PDF), Email (the invoice as a PDF and a portal link, with a message you can change and a list of what was sent), Add notes for notes to this customer on this invoice (and its customer PO), Receive payment while the invoice is open, Credit memo… and Write off… (below), Void while nothing has been paid, credited or written off against it, and the journal entry it posted as. Voiding posts a reversing entry and frees the shipment to be invoiced again. A Payments and credits card lists each payment, credit and write-off on the invoice (a credit or write-off can be undone there) and any check the customer says is in the mail, whose Record payment opens Receive payment filled in from it. The invoice tells the customer who checks are payable to, from Settings > Getting paid.

Your invoice design

Settings > Invoices sets how every invoice looks, for administrators. Pick a template (Classic, the boxed printed form; Modern, a colour band and an open layout; Compact, small type that fits long invoices), one of eight colour palettes or your brand colour from Settings > Appearance, and whether the logo prints. Then fill in the standard fields: business name and address (blank prints the company details from Settings > Company), phone, billing email, website, tax ID, a remit-to address for a lockbox or PO box, how payment terms print ("Net {days}", with the customer's own days), payment instructions for checks, ACH or cards, a late-fee note, notes and footer text for every invoice, and the thank-you line. Column switches turn off part number and revision, customer PO, quantity, unit, unit price and line notes; two more turn off job numbers and shipment and packing list numbers. Description and amount always print.

The preview beside the form changes as you type, on a sample invoice or any recent real one, as the printed page or as the email the customer gets. Save, and the invoice page, its PDF, the portal copy and the emailed invoice all use the new design. Colour prints on a colour printer and in the PDF.

Getting paid

Accounting > Receivables > Payments has four tabs: Payments, Deposits, Credits & refunds, and Reminders & statements. Along the top: what is waiting to be deposited, checks customers say are in the mail, credit on customers' accounts and what came in over the last 30 days.

Receive payment takes the customer, the date, how they paid (check, cash, ACH, wire, card or other), the check number or reference, the amount, where the money goes and how much goes on each open invoice. The amount fills the invoices oldest first, the invoice it was opened from first. A check, cash or a card slip goes to Undeposited funds until it is taken to the bank; an ACH or a wire goes straight to the bank account. An amount left over is refused unless Keep the rest as a credit is ticked; the rest then sits on the customer's account as a credit. The same check number for the same amount from the same customer within 120 days asks "Record this check again?" before it is saved. When a customer has said in the portal that a check is in the mail, Receive payment offers that notice and fills in from it, and recording the payment closes it.

A payment's status says where the money is: Waiting to be deposited, In the bank, Returned unpaid or Void. Its page shows the invoices it paid, any credit left from it with Use the credit on an invoice… and Refund the credit…, a card for a photo of the check, and two actions. Void… asks why; the payment stays in the list marked void with the date, who did it and the reason, its invoices reopen and the entry is reversed. A payment already on a bank deposit is voided by voiding the deposit first. Returned… is for a check that bounced or an ACH the bank pulled back, once the money was in the bank: the invoices it paid open again, the bank's fee can be booked to Bank fees, and a fee to the customer goes on a new invoice of its own (the default amount is set under Settings > Getting paid; check your state's limit). The aging as of a date before the return still counts the payment.

Bank deposits

The Deposits tab lists the checks and cash waiting in Undeposited funds. Tick the ones going to the bank, add any other money on the same slip (a refund from a vendor, cash from scrap metal) with its account, pick the bank account and make the deposit: one entry, which matches the one deposit line on the bank statement. Each deposit prints a deposit slip listing every check by customer and number, the cash and the total. Voiding a deposit puts its payments back to waiting.

Credits, credit memos, refunds and write-offs

Credit memo… on an invoice gives money back on it: a price adjustment, rejected or reworked parts, a short shipment, parts damaged in your care, goodwill or another reason, with lines and any sales tax. It is spread over the invoice's lines, so it lands on the same lines of the shop, and is applied to the invoice at once. New credit memo on the Credits & refunds tab makes one on its own, for a customer, to use later. Each credit memo prints. A credit memo can be voided while none of it has been used or refunded.

Credit on a customer's account comes from credit memos and from overpayments. The Credits & refunds tab lists it by customer: Use on invoices… applies it to open invoices, and each use can be undone. Refund… pays it back by check or by an ACH already sent from the bank. A refund check written by hand is entered with its number; otherwise it waits in the check register and the app offers to print it at once. Refunds can be voided.

Write off… on an invoice clears what is left of it, as bad debt (to Bad debt expense) or as a small balance not worth chasing (to Sales returns and allowances). In the portal it reads "Adjustment". A write-off can be undone.

The accounts these post to are found or added the first time they are needed, at numbers set under Settings > Company: Undeposited funds 1050, Customer credits 2150, Returned check fees 4950, Sales returns and allowances 4990, Bank fees 6410 and Bad debt 6450. A shop that already uses one of those numbers for something else (6410 for rent, say) keeps it; the new account takes the next free number.

Aging, statements and reminders

A/R aging groups open invoices by customer into Current, 1 to 30, 31 to 60, 61 to 90 and over 90 days past due, as of today in the shop's time zone or as of any past date picked under As of (the balances owed on that day, ignoring later payments), with each customer's credit on account and checks in the mail beside it. Clicking a customer opens their Statement of account (form PO-STM-01): the aging row, an opening balance, every invoice, payment, credit memo, refund, write-off and returned payment in the period with a running balance, and the open invoices. It covers the last 90 days by default, prints, and goes to the customer with Email statement. Customers with portal access see their own statement in the portal.

The Reminders & statements tab emails statements to everyone who owes money in one click, keeps a log of what was sent, and lists the checks customers say are in the mail. Payment reminders are off until switched on under Settings > Getting paid. The steps are in days from the due date: 3 days before, on the due date, and 7 and 30 days after unless changed. Each customer gets one email listing every invoice that has reached a step, sent once a day at the shop's reminder time (8:00 AM unless changed). After a day the server was down, only the latest step reached is sent, never a pile of old ones. Customers marked "no reminders", customers without an email address and invoices with a check in the mail are left out. The tab shows what would go out today, even while reminders are off, with Send now. Monthly statements can go out on a day of the month the same way.

Long lists, statement dates and printing in bulk

Every list has Download CSV above it, beside the Filter box when the list has one: the rows as they are shown (filtered, sorted and on the tab that is open, every page of them) with the columns on screen, in a file named for the list, the tab and the day, such as invoices-overdue_2026-10-24.csv.

The Invoices list has Open, Overdue (open and past the due date), Paid, Void and All tabs, and beside Filter a From and To date range on the invoice date and a customer. The server filters, sorts and counts, so a date range or the Overdue tab covers every invoice in the books, not only the ones on screen: the list shows 100 at a time with Previous and Next and says where you are, as in "1–100 of 1,412". Tick invoices to Print selected (one document, one invoice to a page) or Email selected (each one to the customer's invoice contacts with its PDF); a void invoice, or a customer with no email address, is listed as not sent.

A statement ends on its Statement date, the last day of last month unless you pick another. A statement dated September 30 shows the balance on September 30, the activity up to that day and the invoices still open on it, and nothing after it. The Reminders & statements tab takes one statement date for the whole run: Email statements to everyone who owes money sends statements ending on it, and Print all statements prints everyone who owed money on that date as one document, one statement to a page. The customers who owed money are listed below, to tick a few and print or email just those. When emailing skips customers with no email address, the message that says so offers to print their statements at once.

The outside accountant reads; the office changes things. A view-only role, such as the Accountant (outside) template, opens Invoices, Payments, Bills, Pay bills and the journal without the buttons that create, receive, pay, post or void, and the server refuses those changes from it anyway. It still posts adjusting entries: its journal button is New adjusting entry. It reads the payroll registers and the labor burden under Finance > Payroll register without taking a paid seat, and Download for accountant has a Payroll registers choice, ticked to start with (see Payroll hand-off).

Recurring invoices and entries, finance charges, and shipments invoiced together

Recurring invoices (from the Invoices page) and Recurring entries (a tab of the General ledger) work like recurring bills. A template holds the customer and lines, or the journal lines, and repeats every so many months, weeks, quarters or years until an end date or a count; the server makes each one at 5:30 in the morning. Post it raises the invoice, emailed to customers who take invoices by email, or posts the entry. Save it for review keeps it out of the books and tells the office, and its review page lets the date and lines change for that one time before it posts, or skips it. Pause, Resume and Run now work as they do for bills, and a date is made only once however often the run repeats. Rack and barrel rental or a monthly minimum fits a recurring invoice; depreciation and accruals fit a recurring entry, which must balance and can reverse itself on the 1st of the next month. A document dated in a closed period waits for review with the reason instead of posting. An entry posts only for a role that may post journal entries, as a typed entry does.

Finance charges (from the Invoices page) previews the customers with balances past due on a date, with the charge at the shop's monthly rate, a least charge and grace days. Leave out keeps a customer out of finance charges. Raise finance charges posts one invoice per ticked customer on the finance-charge charge type to a Finance charges revenue account; a customer is charged once a month, and a finance charge is never charged again.

Uninvoiced shipments has a tick on each row and Invoice selected: one invoice per shipment, or one per customer combining its shipments, so a customer shipped every day can get one invoice a week. A combined invoice takes the customer's tax and terms, is dated the last ship date and lists every shipment on it; each shipment is invoiced once. On the statements Sent list, each row opens the statement that went out, with its own dates.

Settings > Getting paid

For administrators. How customers pay you: who checks are payable to, the remit-to address (the same one as Settings > Invoices), a lockbox address if checks go there, the ACH and wire instructions and a note to customers. The bank details are shown only to customers signed in to the portal and are never put in an email; when they change, every administrator is told, because criminals send fake "our bank details changed" emails. Then the reminder steps and time, monthly statements, how long a "check in the mail" is expected (its invoices get no reminders meanwhile), the returned-check fee, the receipt rule for spending, and the accounts used. Payment is not taken online through the portal; see Customer portal for what the customer sees.

General ledger

Every invoice, payment, deposit, credit, bill, vendor payment, expense and stock movement posts a balanced journal entry on its own; there is no month-end batch. The chart of accounts is under General ledger > Chart of accounts and Shop setup, and the accounts the system posts to are set under Settings > Company; an account that is missing (Goods received not invoiced, Purchase price variance, Opening balance equity, Undeposited funds) is added the first time it is needed. Once an account has postings its number and type are locked; it can still be renamed.

EventDebitCredit
InvoiceAccounts receivableRevenue per process, metal surcharge, and sales tax on each agency's account
Customer paymentUndeposited funds for a check, cash or a card slip; the bank account for an ACH or a wireAccounts receivable, and Customer credits for any amount kept as a credit
Bank depositThe bank accountUndeposited funds, and the account of any other money on the slip
Returned checkAccounts receivable for the invoices it paid (Customer credits for any credit it left), and Bank fees for the bank's chargeThe bank account
Credit memoSales returns and allowances (or each line's own account), and sales tax on the accounts of the agencies the invoice chargedCustomer credits
Credit used on an invoiceCustomer creditsAccounts receivable
RefundCustomer creditsThe bank account
Write-offBad debt, or Sales returns and allowances for a small balanceAccounts receivable
Stock received, on a PO or with Receive on the itemInventoryGoods received not invoiced
A new item's opening quantityInventoryOpening balance equity
Vendor bill for stock receivedGoods received not invoiced, at the value received; a different price on the bill goes to Purchase price varianceAccounts payable
Other vendor billThe line's expense accountAccounts payable
Vendor paymentAccounts payableThe bank account it is paid from (the cash account unless another is picked)
Stock issued: to a job, a tank addition, a makeup or a treatmentChemicals and supplies expenseInventory
Parts issued to a maintenance work orderRepairs & maintenanceInventory
Stock count adjustmentInventory against chemicals and supplies expense, up or down
Void of any of theseA reversing entry linked to the original, dated the same day as the original while that day is open, otherwise the first open day after the closing date (and after a reconciled bank statement it touches)

Expenses, bank lines added to an account and transfers post as shown on Banking, checks and expenses; vendor credits, early-pay discounts and use tax on Payables, vendor credits and 1099s; sales tax returns on Sales tax; the payroll register on Payroll hand-off; and opening balances on Switching from QuickBooks. Stock that was on the shelf or received before these postings existed is not posted after the fact. Financials > Inventory vs ledger shows the inventory account beside the value of the stock, item by item, with any difference; it shows the difference and posts nothing, so you or your accountant decide on the entry.

The General ledger page has three tabs. Journal shows the entries for a date range, 100 a page with Newer and Older, filtered by source (every kind of posting, grouped: sales and customer payments, deposits, credits, refunds, write-offs and returned payments; bills, vendor payments, vendor credits and expenses; bank lines and transfers; stock; payroll; manual entries and their reversals; and the voids of each) and by line, with an Open link back to the document behind each entry. A manual entry opens on a page of its own with its lines, and, for the roles that may void, Reverse…: pick a date and say why, and a reversing entry posts with every line mirrored. The two entries link to each other, an entry is reversed once, and documents are reversed by voiding them instead. New journal entry takes a date, memo and lines with running totals and a line for each sales, cost or expense row; the server refuses an entry that does not balance. Reverse on (optional) reverses the entry on that later date, the usual way to post an accrual: the daily job posts the reversal once, early that morning, and the date can be moved or cleared until then. Like Reverse…, it is there for the roles that may void. An entry ticked Adjusting entry (an accountant's year-end adjustment, say) can be listed on its own with Adjusting only. Any account opens as a ledger with opening balance, each entry and closing balance, for one line or all; it prints and downloads as CSV. Chart of accounts lists the accounts as a tree with each one's detail type, balance and what the system uses it for. Changes is below.

Lines (classes)

A line is a part of the shop you want a profit and loss for: the plating line, anodizing, polishing, precious metals. QuickBooks calls them classes. Every area (Setup > Areas) gets a line of its own with its code and name, and an area's Line in the books can point at another line so several areas share one. Lines are kept under Shop setup > Lines (classes), and a vendor can have a default line. Postings find their line on their own: sales on the line of each job's plating area (the area of its first plating, anodize, strike, conversion or passivate step, else the area most of its steps run in), the metal surcharge the same way; chemicals issued to a job on the job's line, and tank additions on the tank's area; a bill on the line picked on the bill line, else its job's, else the vendor's default line; an expense or a bank line on the line picked, else its job's or tank's, else the vendor's; a manual entry on the line picked on each row; a void on the lines of what it reverses. Rent and other shop-wide costs stay on No line. When lines were added, older sales, cost and expense postings were put on their lines once where that could be done without splitting a posting; no amount changed.

Detail types and sub-accounts

Each account has a detail type within its type: bank, credit card, undeposited funds, clearing, accounts receivable, inventory, other current asset, fixed asset, accounts payable, sales tax payable, payroll liabilities, other current or long-term liability, equity, retained earnings, income, other income, cost of goods sold, expense, other expense or other. Existing accounts got one from what the system uses them for, then their name. Banking works with the bank, credit card and clearing accounts. An account can be a sub-account of another of the same type, up to five levels; the statements show sub-accounts under their parent with a Total line.

Changes, and nothing deleted

General ledger > Changes (administrators, managers and office staff) lists the changes to finance records (accounts, lines, journal entries, the closing date, invoices, payments, deposits, credit memos, refunds, bills, expenses, bank accounts and lines, reconciliations, checks) with who made each change and when and, for most, the values before and after; Setup > Audit trail shows the same for every record. Finance records are voided or marked inactive, never deleted: an account with postings, one the system posts to, or one with sub-accounts cannot be deleted, nor can a line on any posting or used by an area or a vendor. The refusal says why and offers to mark it inactive instead.

Financials has six tabs: the income statement for a date range, from the start of the fiscal year unless you pick other dates (revenue, cost of sales, gross profit, operating expenses, net income), for the whole shop, one line or No line; P&L by line, the same statement with a column for each line that had activity, No line and the total, which equals the income statement, and a net margin per line; the balance sheet as of a date (assets, liabilities, and equity with retained earnings from earlier years and this year's net income on lines of their own, and a line that says Balanced or by how much it is not); the statement of cash flows; the trial balance; and Inventory vs ledger. Sub-accounts sit under their parent with a total. Each tab prints and downloads as CSV, the rows as shown (the A/R and A/P agings, the Cost reports tabs and the reports have the same CSV button). The income statement and the balance sheet compare with an earlier period, last year or the budget, and the income statement can be shown on cash basis; these, budgets, the month-end close checklist and Download for accountant are on Financial reports, budgets and month-end close. Finance is for administrators, managers and office staff.

Fiscal year and closing date. Settings > Shop > Books, for administrators, sets the month the fiscal year starts (January unless changed) and shows Books closed through with every change to it (who, when and why) and a link to Month-end close. Nothing can be posted on or before that date: an invoice, payment, deposit, credit memo, bill, expense, receipt or journal entry dated then is refused with a message that says so, and a void of an older document posts on the first open day. A month closes on Finance > Month-end close once its checklist is signed off, which moves the date to the month's last day; reopening is there too, for administrators, with a reason. An administrator can also let adjusting entries into a closed month for a while without reopening it (see Month-end close).

Financial records as a ZIP. Settings > Data > Export and backup writes the books for a date range (at most 366 days; quick picks for this month, last month, this year and last year) as one archive, and Download for accountant on Financials and Month-end close gives the same documents and attachments next to the statements and ledger detail: a README naming the shop and the range, the chart of accounts, journal entries and lines with a trial balance as of the end date, invoices and customer payments (with their status, check number and bank deposit) with the A/R aging, credit memos, refunds and bank deposits, purchase orders, bills of both kinds, vendor payments, expenses and the A/P aging, inventory transactions with values, the payroll files (timecards in the shop's local time with paid minutes, piecework, each person's workweeks with the pay breakdown, and the pay periods, approved pay, time off, adjustments, imported payroll registers and labor by line; only for people who can see everyone's timecards: administrators, managers and the roles ticked under Settings > Team > Time & pay; the README says when they are left out), and every receipt, remittance scan and vendor document attached in the range under attachments/ with a manifest listing each file's record, upload time, size and checksum. Plain CSVs with ISO dates and decimal money, readable without the app: the owner's offline copy to keep next to the full backup. The journal lines carry each posting's line (QuickBooks class) and the chart of accounts its detail types and parent accounts. Bank lines, checks and reconciliations have no files of their own; what they matched or posted is in the journal. Each download is logged under Settings > Security.

Time clock and timesheets

The Time clock page has your own Clock in / Clock out button and a badge punch box for a kiosk: scan or type a badge number and the screen shows who clocked in or out. A badge read again (a scanner reading twice, a second scan to be sure), or a Clock in / Clock out button pressed, within 2 minutes of that person's last punch asks first: "You just clocked in at 7:02 AM. Clock out now?", or "You just clocked out at 3:30 PM. Clock back in?", with No and Yes. No is picked to start with, and the question closes by itself as No after 10 seconds so the kiosk is never left waiting; nothing changes unless someone presses Yes (at the kiosk, No shows "Ana Lopez is still clocked in."). While the question is open, the same badge read again is ignored, and a different badge answers No for the first person and punches the second. Yes punches the way the question asked, so a person clocked out somewhere else in those seconds is not clocked back in. The buttons on the Time clock page, the Shop floor terminal and the clock-in question at sign-in ask the same way. The 2 minutes are fixed. A traveler barcode scanned there (the job's *J50001*, or a step's) opens the job or step as on the shop floor and is never punched as a badge; a plain J50001 that is nobody's badge opens the job too. Clocking out also stops any job labor the person still has running. The page lists everyone clocked in and the operation they are on, and follows punches made elsewhere without reloading; your own shift for the day shows under the button when you have a schedule.

Schedules and pay. Each person can have a weekly schedule, set by an administrator or a manager under Settings > Team > Edit member: a start and an end for each day, paid break minutes, and a lunch in minutes that is unpaid unless it is ticked paid. Copy Monday to weekdays fills a regular week in one click, and a day with no times is not scheduled. Pay is hourly or salary: the hourly rate or the annual salary sits on the same form and on the Employees master under Shop setup, visible to administrators only.

Clocking in at sign-in. With Ask staff to clock in at sign-in switched on (Settings > Team > Time & pay), a person who has not punched in today is asked "Clock in now?" with their scheduled start as the app opens; Not now is remembered for the day on that device; portal users are never asked, and a shared kiosk login is asked like any staff login until it has punched, so switch the prompt off for a kiosk-only shop. Schedules are read in the shop's time zone (Settings > Company), or in each browser's own zone while that is blank. A punch more than the grace minutes before the scheduled start asks why and records an Early flag with the note; a clock-out past the scheduled end plus the grace asks for a note and records a Late flag, on the Time clock page and on the Shop floor terminal alike. An early or late punch is never refused; a Clock in or Clock out button left on screen after the person punched elsewhere is refused rather than punching the other way. The schedule in force is frozen on the punch, so a later change to the schedule does not rewrite history.

Timesheets covers a date range, two weeks by default, with a person picker for timecard roles and a Flagged only filter. The summary per employee shows scheduled hours with the variance against them, worked hours, paid hours (worked less the unpaid lunch, which comes off automatically, once a shift, from a punch longer than the threshold under Time & pay, and not at all when the person clocked out for a break at least as long as the lunch), overtime over the weekly threshold (40 hours in a workweek that starts on Monday unless Time & pay says otherwise; a shift across the start of a workweek counts its hours in the week they were worked), hours on jobs, utilization, the count of early and late punches, and the pay (below): finance roles see everyone's, and each person sees their own, or the weekly salary (the annual salary over 52) for salaried staff. Below it are the punches with their Early and Late badges, the minutes and the person's note; timecard roles can add, edit or delete a punch and change its flags and notes (a punch that overlaps another of the person's is refused, so no hour is paid twice), and everyone else sees only their own.

Overtime and the minimum wage. Pay is worked out one workweek at a time, in the shop's time zone, the same way for every pay mode. The week's regular rate is all its straight-time pay (hourly pay plus piece pay) divided by all the hours worked, and each hour over the threshold adds half that rate as an overtime premium. Paid by the hour, that comes to time and a half: 45 hours at $20 is $900 plus a $50 premium. Paid by the piece, the premium comes on top of the pieces: 50 hours that earned $600 in pieces is $12 an hour, and the 10 hours over 40 add $60. A week that pays less than the minimum wage for its hours is topped up to it, and the premium is worked out on the topped-up rate: 45 hours that earned $270 gets a $56.25 top-up and an $18.13 premium, $344.38 in all. The minimum wage and the day the workweek starts are set under Settings > Team > Time & pay ($7.25 by default, the federal and Wisconsin rate; 0 turns the top-up off).

Timesheets has a Pay breakdown card (everyone's for finance roles, your own for everyone else): per person, straight time (hourly and piece), the OT premium, the min-wage top-up and the pay, with totals. A workweek that runs past the end of the range has its premium and top-up paid with the range that holds its last day, and the card says so. Pay periods, approval and lock, the files for your payroll provider and the provider's payroll register brought back into the books are on Payroll hand-off; Amp-Hour itself works out no taxes or net pay.

Who sees everyone's timecards is a list of roles, built-in or custom, under Time & pay; administrators are always on it and managers are by default. Timecard, from the Timesheets page or from a name in the summary, prints one person's week: each day with its schedule, the punches, worked and paid hours and the notes, the totals and, for those who see pay, the pay for the timecard with a table of each workweek it touches (hours, overtime, straight time, regular rate, premium, top-up and the week's pay); then signature lines for the employee and the supervisor. Badge numbers, rates, salaries and schedules are set under Settings > Team.

Reports

The Reports page runs one report for a date range, prints it and downloads it as CSV. The finance ones: Sales by customer and Sales by process (processing and metal surcharge separately), Job profitability (the figures of Cost reports > Job cost and margin for the jobs received in the range: the price, what is invoiced so far, labor, overhead, chemistry, materials, outside processing and the margin on the price, so a job has the same margin in both places), Labor by employee and Labor by work center. Analysis > Cost reports adds chemistry cost per tank and per square foot, metal margin, and job cost and margin (see Financial reports, budgets and month-end close). The Dashboard shows the finance roles open and overdue A/R, open A/P and sales this month.

Banking, checks and expenses

The shop's bank and card accounts are kept in the books. Download the statement from the bank's website and import it: each line is matched to what the books already have, or added to an account. Once a month the reconciliation ties the books to the statement to the cent. Checks print on pre-printed voucher stock, the positive pay file goes to the bank, spending paid on the spot is an expense, and anyone on the team can snap a receipt with a phone.

Banking, checks and expenses are for administrators, managers and office staff, and custom roles built on those levels with Finance (banking) or Payables (checks and expenses). The receipt inbox is for everyone. There is no live bank feed: the statement file is how the bank's side comes in.

Bank and card accounts

Accounting > Banking > Bank accounts lists every account the shop keeps money in or owes on: checking, savings, petty cash, a credit card, a clearing account (a card processor, money in transit) or a line of credit or loan. Each one is an account in the chart of accounts, set to the matching detail type; the cash account (1000) is set up as the first one the first time Banking is opened. Add account picks an account already in the chart or makes a new one, with the bank's name, the last 4 digits of the account number and the opening balance and date, which it can post as the opening entry. Along the top: cash in the bank and what is owed on cards and loans, as the books stand today; checks and cash waiting to be deposited; bank lines to review; and checks to print.

An account's page has four tabs. Register lists everything posted to the account with a running balance, marked C once it is matched to a statement line and R once it is reconciled; a card or a loan shows what is owed. Reconciliations lists the finished ones with their reports. Statement files lists the files imported. Settings holds the name, kind, bank, last 4 digits, opening balance and date (entries on or before it are left out of reconciliations) and, for an account that writes checks, the check printing settings below.

Transfers moves money between the shop's own accounts, from checking to savings or from checking to petty cash. Paying the credit card bill is a transfer from checking to the card. A transfer can be voided with a reason.

Importing the statement

Import statement takes the file from the bank's website: a CSV from any bank, or an OFX, QFX or QBO file (the Quicken and QuickBooks downloads), for a bank account or a card. For a CSV the columns are guessed (the date, one amount column or separate money-out and money-in columns, the description, the check number, the balance, and any lines above the headings) and can be changed; the choice is remembered for that account, so next month's file goes straight through. A preview lists every line before anything is saved. Lines imported before are marked Already in and skipped; a line that looks like one from another file (same date and amount, same words or check number) is marked Maybe the same and can be left out. The file itself is kept with the import. An import can be undone while none of its lines has been matched or added.

Bank lines

Accounting > Banking > Bank lines is the list of statement lines still to review, with a suggestion for each. Opening a line shows what it might be, best first:

  • An entry already in the books for the same amount on that account: a deposit, a customer payment that went straight to the bank, a vendor payment, a check (its number counts for a lot), an expense or a transfer. Several entries can add up to one line, such as a deposit of several checks.
  • Open bills from one vendor for that amount: Pay bills records the payment from this account and matches it.
  • An open invoice for that amount: Receive payment records the customer's payment into this account and matches it.
  • The other half of a transfer on another of the shop's accounts.
  • A rule, or the account chosen for lines that started with the same words before.

Anything else is added by hand: Add it to an account (usually an expense: what the money paid for), with a line, a vendor and a memo, split across several accounts if needed, and Make a rule from this for the next one. Find it in the books lists the entries on the account not yet matched, to tick by hand. Exclude is for a line the books should not have, such as a duplicate or a bank correction that reverses itself. Each line takes a receipt, from a file or from the receipt inbox when a receipt for the same amount is waiting there, and a note. A match, an add or an exclude can be undone until the month is reconciled. On the list, the lines with a sure suggestion can be ticked and confirmed together.

Rules say what a regular line is: words the description or payee contains (or starts with), money in or out, an amount range, and the account, line and vendor it goes to. A rule either suggests, so the line is added when someone confirms it, or adds without review as soon as the statement is imported, unless something already in the books matches the line. The first rule that fits wins. Three examples come switched off (the electric and gas utility, the waste hauler, the payroll provider); pick an account and switch one on, or press Test to see which lines it would catch.

Reconciling

Accounting > Banking > Reconcile takes the statement's ending date and ending balance; the beginning balance is the last reconciliation's ending balance (the opening balance the first time). Entries matched to statement lines arrive ticked; tick the rest that are on the statement. The difference must be $0.00 to finish. A finished reconciliation is locked: the entries in it cannot be changed, and a void of one of them posts the day after the statement date, so a reconciled month never moves. It keeps a printable report (the cleared deposits and payments, and what was still outstanding at the date) and the statement PDF can be attached to it. A credit card is reconciled the same way, in the amount owed. An administrator can undo the last reconciliation of an account, with a reason. The Reconciliations tab also lists entries dated inside a reconciled month that were entered after it was finished, so a late change does not go unnoticed.

Checks

Accounting > Payables > Checks is the check register: every check with its number, date, payee, what it paid and its status (To print, Printed, Written by hand, Cleared, Void). Checks come from paying bills by check (see Inventory and purchasing), from refunds to customers and from expenses paid by check. A check written by hand is entered with its number; one without a number waits under To print.

Print checks asks for the first check number (the account's next number unless changed), numbers the checks in order and opens the print page, sized for Letter paper, for the browser's print dialog. The checks print on pre-printed voucher check stock, which already carries the bank's details and the MICR line; blank stock is not supported. Three layouts: voucher (the check on top with two stubs), one check per page with stubs (at the top, middle or bottom), and three checks per page. Each check has the amount in figures and in words, the payee, the date and the memo; the stubs list what it paid. The account's settings choose whether the payee's address prints (for a window envelope), whether the shop's name and address and the bank's name print (only when the stock is blank there), and a larger print size.

Line up the stock prints a test page on plain paper with a ruler grid and a sample check marked "TEST PAGE — NOT A CHECK": hold it over a sheet of check stock against the light and move the print right or down, in hundredths of an inch, until the boxes sit in the spaces. The offsets are saved per account.

A check's page shows the check face, the stub, its history and its files (a photo of the signed check, or the bank's image of it). Reprint prints it again on the same number, or on a new number when the first sheet was spoiled: the spoiled number stays in the register as void, so every number is accounted for. Void voids the check and the payment it made, so its bills open again. The register lists any numbers missing from the sequence.

Positive pay

Positive pay is the file of checks the shop has written that the bank uses to refuse anything else. Checks > Positive pay lists the checks not yet sent; Make the file downloads them as a CSV in the bank's layout and marks them sent, so each check goes once, and voided checks follow in a later file when the bank wants them. The layout is set once per account from the bank's positive pay guide: the columns in the bank's order (account number, check number, issue date, amount, payee, the issue or void code, void date, memo, fixed text), the separator, the date and amount formats, the codes and whether a headings row comes first. The bank account number is typed each time a file is made and is never stored.

Expenses

Accounting > Payables > Expenses is spending paid on the spot from a bank account, a credit card or petty cash; a bill paid later stays under Bills. New expense takes where it was paid from and how (debit card or bank transfer, a check written by hand, cash; on a card account a charge or a refund back on the card), the date, a reference, the vendor (or a payee who is not a vendor), the lines and the receipt. Each line has a category, an amount and what it was. A check without a number waits in the check register to be printed.

Categories say which account the spending goes to. A new shop has 17 for a plating shop, from process chemicals that are not stocked, lab reagents, anodes, bags and filters, masking, rack wire and PPE to waste hauling, permits and generator fees, outside lab testing and freight; an account a category needs is added to the chart the first time it is used. Some categories ask which tank, job, piece of equipment or waste manifest the spending was for, and the line (class) follows from the job, else the tank's area, else the vendor's default line. A line can be billed to a customer: New manual invoice for that customer then lists it under billable expenses, ticked and added with Add to the invoice; voiding that invoice frees it again. Sales tax included in the amounts can be noted for the records. Expenses can be voided with a reason.

Settings > Getting paid sets the receipt rule: an amount over which a receipt is needed, and whether an expense without one is saved and flagged "needs receipt" or refused. The Expenses page counts the ones missing a receipt.

The receipt inbox

Receipts, under Overview, is for everyone on the team. Snap a receipt opens the phone's camera (or takes a photo or a PDF on a computer) and sends it with the vendor, date and total if the person wants to type them. The picture is shrunk on the phone before it is sent (unless the shop's Photo size is Original), which also drops its location data. Sending the same picture again (a double tap, a retry) does not make a second receipt. Until it is filed, a receipt is seen only by the person who sent it and the office.

The office works the inbox: Make an expense from it, file it on a bill, an expense or a bank line (the inbox suggests the likely ones by amount, date and payee), or discard it with a reason; a discarded receipt is kept for seven years. A filed receipt can be reopened, and the sender can delete one still in the inbox.

How they post

EventDebitCredit
Bank line added to an account (money out)The account picked, usually an expenseThe bank or card account
Bank line added to an account (money in)The bank accountThe account picked
Transfer, or a card paymentThe account the money went to (or the card)The account it came from
Expense, paid by debit card, check or cashEach line's category accountThe bank or petty cash account
Card chargeEach line's category accountThe credit card account
Vendor payment by checkAccounts payableThe bank account it is written on
Void of any of theseA reversing entry linked to the original, never in a closed or reconciled period

Matching a bank line to an entry already in the books posts nothing; it only marks both as the same money. Customer payments, deposits and refunds are on Invoicing, receivables, ledger and time.

Payables, vendor credits and 1099s

What the shop owes and how it pays: bills that wait for approval, credits from vendors, bills that come every month, a pay-bills run that pays each vendor its own way and takes the early-pay discount, use tax on untaxed purchases, and the 1099s at the end of the year.

Payables is for administrators, managers and office staff, and custom roles built on those levels with Payables. Accounting > Payables has POs, Bills, Vendor credits, Recurring bills, Expenses, Checks, A/P aging and 1099s. Entering a bill, receiving against a PO and the payment on a single bill are on Inventory and purchasing; printing checks is on Banking, checks and expenses.

The Bills list

Bills opens on All open: purchase bills and general bills together, with a Kind column, Kind chips (All kinds, Purchase, General) and an Overdue chip, so its total is what the A/P aging shows as owed. All is every bill, drafts and bills waiting for approval included, each with its status, and the line above the list counts each status, so nothing is left out without saying so. A link to an old Purchase or General tab opens All open for that kind.

One Enter bill button starts every bill. Once the payee is picked, a payee with purchase orders received and not billed yet, or stock received without a PO and waiting for a bill, is offered Bill from a PO, which bills the received lines at the vendor's price instead of typed lines; From a PO or a receipt on the form opens that bill straight away. A view-only role (the outside accountant) sees the bills, the payments and what is due on Pay bills, without Enter bill, Pay, Post, Void or Attach.

Bills that are not in the books yet

The Bills page has two tabs for bills that have not posted. Drafts holds bills saved without posting: a recurring bill set to "save to review", a bill sent back by an approver, or a bill whose date falls in a closed month. A draft can be edited, posted (on a later date when its own day is closed) or deleted. To approve holds bills waiting for an approver. Neither kind is owed in the A/P aging until it posts, and the totals at the top of the page count posted bills only. A draft still holds the PO receipts on it, so they cannot be billed twice.

Bill approvals

Approvals are off until an administrator turns them on under Settings > Payables. The rule: a bill at or over an amount ($2,500 unless changed), and by default only a bill with no PO behind it, waits under To approve and is not posted. The approvers are the roles ticked there (administrators and managers unless changed); they are notified when a bill waits. Approve posts it on its own date, or on a date you pick when that day is closed. Send back asks why and returns it as a draft; whoever entered it is told either way.

By default the approver must be a different person from whoever entered the bill. When nobody else can approve, the person who entered it may, and the audit log says so, so a one-person office is never stuck. Once more than one person enters bills, Settings > Payables suggests turning approvals on.

Vendor credits

A vendor credit is money a vendor owes back: chemicals or drums sent back, a drum deposit returned, a short shipment, a price correction. New vendor credit takes the vendor, the vendor's credit memo number, the date, a reason and lines: an account and an amount, or a stock item and the quantity sent back. It lowers what you owe the vendor and lowers the cost or expense account. Stock sent back leaves inventory at its average cost, and any difference from the credit's amount goes to purchase price variance.

A credit is used on the vendor's open bills, from the credit's page or with Use a vendor credit on a bill; Take off removes it from a bill again and the bill reopens by that much. Refund records the vendor paying it back into a bank account. Void asks why, and only works while nothing has been used or refunded. Unused credits show in the A/P aging as negative rows in the Current column, linked to the credit. A bill line still cannot be negative; the form points to vendor credits instead.

Early-pay discounts

A vendor's terms can carry a discount, such as 2/10 net 30: 2% off when paid within 10 days. Set it on the vendor's Payables and 1099 card; each new bill from that vendor gets the discount date, and a bill can carry its own. The Pay bills run takes the discount while it is still on for the payment date. The discount posts to 5195 Purchase discounts (added the first time it is used).

Pay bills

Pay bills lists the open bills by vendor, all of them or those due by a date; overdue bills and bills due in the next 7 days start ticked. Pick the account to pay from, the payment date and the method:

  • Each vendor's own way: the "Usually paid by" set on the vendor (a check when none is set), changeable per vendor in the list. A check goes to the check register to print, an ACH payment is recorded as sent, and a card payment comes off the card account (the shop's only card account when there is just one).
  • Or one method for everyone: check, ACH, wire, card or cash.

With Use vendor credits first and Take early-pay discounts ticked (both are, unless unticked), a bill left blank is paid in full: the vendor's open credits are used first, then the discount is taken. A typed amount pays that part of the bill, with no credit or discount. Each vendor gets one payment; a vendor whose bills the credits cover in full gets none. Email remittance advice sends each paid vendor that has an email address the list of bills paid. Every run is recorded with its totals of cash, discounts and credits.

Recurring bills

Rent, equipment leases, waste hauling, alarm monitoring: bills that come every month for the same amount. A recurring bill has a name, the vendor, how often (every so many weeks, months, quarters or years, on a day), the first date, an end date or a number of bills, and the lines. Post it puts each bill straight in the books, under the approval rule; Save to review leaves a draft under Bills > Drafts and tells the accounting staff.

The server makes the bills each morning at 5:30 shop time and catches up on dates it missed, up to 24 at a time per recurring bill. A bill dated in a closed month is saved as a draft with the reason. Each recurring bill can be paused, resumed, run now (the next bill at once) or deleted; bills it already made stay.

Use tax on bills

When a vendor charges no sales tax on something the shop uses up (supplies, equipment from out of state), the shop usually owes use tax on it instead; check your state's rules. Each bill line has a Use tax tick. It starts ticked for a vendor marked "Charges no sales tax" on its Payables and 1099 card, and unticked when the shop has given that vendor an exemption certificate (Sales tax > Vendor certificates). Stock received on a PO is not ticked.

When the bill posts, the use tax goes in its own entry at the shop's sales tax rate for its own place: the line's account is debited and Use tax payable (2210, or the agency's own account) credited. Voiding the bill takes it back. It is reported and paid with sales tax (see Sales tax).

1099s

Each vendor's page has a Payables and 1099 card, also opened from 1099s: terms and the early-pay discount, how it is usually paid, whether it charges sales tax, and for 1099s:

  • Gets a 1099, the form and box: 1099-NEC box 1, or 1099-MISC box 1 (rents), 2 (royalties), 3 (other income), 6 (medical) or 10 (gross proceeds paid to an attorney).
  • The W-9 details: legal name, tax classification, whether it is an attorney, the TIN, the date the W-9 arrived, the signed W-9 itself as a file (seen only by the accounting roles) and backup withholding.
  • The TIN is stored encrypted. Only its last 4 digits are ever shown again.

Accounting > Payables > 1099s adds up each 1099 vendor's payments for a year: vendor payments by check, ACH or cash, expenses, and bank lines added to an account with that vendor. Card payments, payments through a card or clearing account and voided payments are left out, since card companies report card payments on their own form. Corporations are left out too, except for attorney and medical payments. A vendor needs a form once its total reaches the threshold for its box. The thresholds are settings, to be checked each year (verify with the IRS or your accountant): $2,000 for payments made in 2026 and later, $600 through 2025, $600 for gross proceeds paid to an attorney and $10 for royalties.

The page flags a missing W-9, a missing or unreadable TIN, an LLC with no tax classification, and backup withholding. A second list shows vendors not marked 1099 who were paid at least the threshold by check, ACH or cash and are not corporations, with Mark as 1099. A vendor's detail lists every payment counted and every one left out with the reason; Add adjustment adds or takes off an amount with a reason, for example payments made in QuickBooks earlier in the year.

IRIS file makes the CSV for the IRS's Information Returns Intake System, one file per form with up to 100 vendors each. Paste the first row of the CSV template you downloaded from IRIS so the columns match it exactly; left blank, the built-in column order is used, which has not been checked against a real IRIS upload. Full TINs appear only in this file, and every download is logged. Summary prints the year with the TINs masked. The shop's own tax ID and the thresholds are under Settings > Payables.

Not done in Amp-Hour: filing (the shop uploads the file in IRIS), the copies that go to vendors (Copy B), and emailing vendors for a W-9.

Paying vendors by ACH

A vendor's Payables and 1099 card has a Bank account for ACH payments: the routing number, the account number, checking or savings, the entry class (CCD for a business account, PPD for a person's own account; Automatic follows the W-9) and the name on the account. The numbers are stored encrypted with the same key as the TIN. Once saved, only their last 4 digits are shown again; they are kept out of the audit log and out of every export and import file, and they leave the server only inside an ACH file.

A payment made by ACH, on one bill or in a Pay bills run, waits for an ACH file, and Pay bills says which vendors have no bank account on file. Bills > ACH files lists the ACH payments from a bank account that are waiting, each vendor's account shown by its last 4 digits, and Make the ACH file downloads a NACHA file for the pay date picked: one batch for business accounts (CCD) and one for personal accounts (PPD), each payment a credit to the vendor's account, with the batch and file totals and the entry hash the format asks for. Upload it on your bank's ACH page. After a Pay bills run with ACH payments, the page opens on that run's payments; when the run also has checks to print, a message offers it once the checks are on their way.

The bank's ACH details are set on the same page: its routing number, the immediate origin and company ID it gave you, the names in the file and the entry description. Left blank, the immediate origin and company ID use 1 and the shop's EIN from Settings > Payables. A bank that wants a balanced file gets one: the file also takes the total from the shop's own account, whose number is typed each time and not stored.

Every file is logged with who made it, the pay date, the number of payments and the total, and each payment keeps its trace number; no account number is kept in the log. Make again makes a file again from the same payments, with a warning to upload only one of the two. Voiding a payment that went into a file warns that the bank still pays it unless you ask the bank to stop or return it. A vendor with no bank account on file is left out of the file and named. Not done in Amp-Hour: sending the file to the bank, and prenotes. The file follows the NACHA layout and has not yet been checked against a real bank upload. Making an ACH file, or making one again, needs the Export data permission, because the file carries the vendors' bank numbers; a view-only role such as the outside Accountant sees the page but makes no file.

Long lists of bills

The All open, Paid, Void and All tabs of Bills come 100 bills at a time, with Previous and Next under the list and the count of every bill the tab holds. The Filter box, the column sorts, the Kind and Overdue chips and Download CSV ask the server, so they cover every bill, not only the page shown. Ticked bills stay ticked from page to page for Pay selected.

Settings > Payables

For administrators, with managers able to read it: the bill approval rule (administrators change it), the 1099 thresholds with the year they were last checked and the shop's own tax ID (administrators and managers), and the accounts payables posts to.

How they post

EventDebitCredit
Vendor creditAccounts payableThe lines' accounts; for stock sent back, Inventory at its average cost, with any difference to Purchase price variance
Credit used on a bill, or taken offNothing posts: both are in accounts payable
Vendor refunds a creditThe bank accountAccounts payable
Payment with an early-pay discountAccounts payable, for the cash and the discountThe bank account for the cash, and 5195 Purchase discounts for the discount
Use tax on a billThe bill line's accountUse tax payable (2210, or the agency's account)
A bill waiting for approval, or a draftNothing posts until it is approved or posted

Sales tax

Sales tax worked out by where the parts go, posted to each tax agency's own account, with the customers' exemption certificates kept on file, a liability report by agency and period, and the returns recorded as they are paid. A shop that charges one rate keeps working as it always has.

Sales tax is for administrators, managers and office staff, and custom roles built on those levels with Receivables. Accounting > Receivables > Sales tax has six tabs: Report, Returns, Certificates, Vendor certificates, Rates and places, and What is taxable. Every rate, and whether a kind of work is taxable at all, is the shop's to check with its state and its accountant: Amp-Hour applies what is entered, and does not look rates up from an outside service.

One rate, or rates by place

A shop that has not set up any places charges one shop-wide rate on taxable work, set on Rates and places, and posts it to 2200 Sales tax payable, as before. Setting up agencies, rates and tax codes switches it to rates by place. Switching never changes an invoice already posted.

Agencies, rates and places

An agency is who the tax is paid to: its state, how often you file (monthly, quarterly, twice a year or yearly), how many days after the period the return is due, the vendor you pay and the account its tax is owed on. The first agency uses 2200 Sales tax payable; each one after it gets a sub-account of its own under 2200.

A rate belongs to an agency and a jurisdiction (state, county, city or a special district), with the date it starts and, once it changes, the date it ends. Change rate takes the new rate and the day it starts: the old rate ends the day before and every place that used it gets the new one, so invoices dated before the change keep the old rate. A tax code is a place: the rates that add up there, such as state + county + city. A code marked "No tax here" is for places the shop does not collect for.

Places are found by ZIP: a five-digit ZIP, a ZIP prefix such as 532*, or a whole state. An invoice takes, in order: a code picked for it, the shop's own code when the customer picks the parts up, the customer's usual code (on the customer's Sales tax card), the code for the ship-to ZIP or state, and otherwise the shop's own code. Rates can be typed in, or imported from a CSV file (agency, type, name, rate, dates, code and area); every row is checked first, and one bad row stops the file with nothing saved.

Start from a state offers every US state. In one step it sets up the state's agency, its state rate and a tax code for the shop's place, plus your county and city when you give their rates. Wisconsin is the built-in example, with county figures. The figures were checked in October 2026: state 5%, most counties 0.5%, Milwaukee County 0.9% and the City of Milwaukee 2.0% (verify every rate with the Wisconsin Department of Revenue before you file).

For Ohio (5.75%), Michigan (6%), Illinois (6.25%), Indiana (7%), Pennsylvania (6%), California (7.25%, the statewide base) and Texas (6.25%), the starter sets up the state's revenue department as the agency and its state base rate only. Each rate shows the date it was checked (October 23, 2026) and the department it was checked against, and is marked "verify with the state". No county, city or district rates come with them, because they change often and differ from one address to the next: you add your own with Add a local rate, from the state's own rate lookup, and the starter's agency starts monthly, due 20 days after the period, until you set it from your registration. For any other state you type the agency and the state rate yourself. Alaska, Delaware, Montana, New Hampshire and Oregon have no statewide sales tax, so the starter has nothing to set up there. Rates can also be entered by hand or from a CSV.

What is taxable

Whether finishing work is taxable differs by state and by what the customer does with the parts; set the defaults with your accountant. Rates and places has the shop's default ("Work is taxable unless marked otherwise", on unless changed). What is taxable sets each process and each part to taxable, not taxable or the default; a part with no setting follows its process. Rates and places also lists the charge types for manual invoice lines, such as freight, certifications and testing, chemicals sold and engineering, each marked taxable or not. On each invoice line the order is: the line's own tick, its charge type, the part, the process, then the default.

Exemption certificates

The Certificates tab, and the Sales tax card on each customer's page, keep the certificates customers give you: the reason (resale, manufacturing, government, nonprofit or other), the form (Wisconsin S-211, the Streamlined F0003, the MTC uniform certificate, a state resale certificate or another), the states it covers (blank for every state), the certificate number, the dates it was issued and expires (blank for no expiry), whether it covers everything or a single PO, and the signed copy as a file. A certificate is pending until someone accepts it, then valid; it can be revoked with a reason, and shows as expired once its date passes.

An invoice for a customer with a valid certificate covering the invoice's date, state and PO is not taxed, and prints the certificate under the tax line, such as "Exempt from sales tax: resale certificate #S211-4471 (Wisconsin S-211)", on the invoice, its PDF and the emailed copy. A customer ticked Tax exempt with no certificate on file is not charged unless an administrator changes the rule to charge tax until a certificate arrives; either way the invoice carries a warning that only the office sees. Every morning the server warns the accounting staff about certificates expiring within 30 days (a setting), customers marked exempt with no certificate, and returns due within 7 days or late.

Vendor certificates are the ones the shop gave its suppliers. Purchases from a vendor holding one accrue no use tax (see Payables, vendor credits and 1099s).

Invoices, credit memos and quotes

The invoice shows the tax place and rate, and each jurisdiction's share when there are several. On a manual invoice each line has a charge type and a Taxable tick (left alone, the charge type and the shop's default decide), the tax place can be picked, and an administrator can leave tax off one invoice with a reason. The tax on an invoice is split by agency and posted to each agency's account. A credit memo gives the tax back to the agencies the invoice charged, and a void reverses it. Each of these also writes a tax record in the same step, which the report reads. A quote shows the estimated tax and the total with tax to the roles that see prices.

The liability report

The Report tab covers a period (this month, last month, this quarter, last quarter, this year or any dates) and gives, for each agency: gross sales, sales not taxable, exempt sales by reason, taxable sales, tax collected, tax given back on credits, use tax on purchases, what is owed and what was paid, with a breakdown by jurisdiction and the documents behind each figure. It prints and downloads as CSV. A card below compares each tax account in the books with the tax records; they should always agree, and the page says so loudly if they do not.

Returns and payments

Record return takes the agency and period, the sales tax and use tax being paid, the vendor's compensation (the discount some states give for filing on time), any penalty and interest, the dates filed and paid, the confirmation number and how it was paid: ACH, check, card or other, from which account. A check goes to the check register to print. The return clears the agency's account, posts the discount to 4960 Sales tax discount and penalties to 6470 Tax penalties and interest. A second return for the same agency and period is refused unless marked amended. A return can be voided with a reason. The Returns tab lists the recent filing periods with their due dates and what is owed.

Payroll hand-off

Amp-Hour works out each person's gross pay from the time clock and piece pay, has each timesheet approved, locks the pay period and sends the hours to your payroll provider. The provider works out the taxes and net pay, pays your people and files the returns. Its payroll register then comes back into the books as one journal entry.

Time > Payroll has tabs for Pay periods, Time off, People, Labor by line, Payroll register, Burden and Settings. Administrators and managers see pay, lock and reopen periods, send files and import the register. The roles that see everyone's timecards (Settings > Team > Time & pay) approve timesheets and enter time off, and see hours but not pay. The overtime and minimum-wage arithmetic is the same as on the timesheets (see Invoicing, receivables, ledger and time).

Pay schedule and periods

A pay schedule is weekly, every two weeks, twice a month (the 1st to the 15th and the 16th to the end of the month) or monthly, from a first day, with payday a number of days after the period ends (5 unless changed). The first schedule is everyone's; People can put a person on another one. A move (or switching a schedule off) is refused while it would leave time in a period that is still open out of every register, because the new schedule has no open period over those days: lock that period first, or start the new schedule earlier. Periods are made as they are needed, up to the one after today's.

Review and approve

A period's page lists each person with their days, punches and pieces, their hours and pay by earnings code, and flags: a missed clock-out, an early or late punch, a shift over 12 hours, no pay rate, or no ID for the payroll provider. Approve all or Approve selected approves people, keeping a frozen copy of their hours and pay; Undo takes an approval back. If the hours or pay change after approval, the approval is marked out of date. A missed clock-out blocks approval until it is fixed, and nobody but an administrator approves their own timesheet.

Lock and reopen

Lock period needs the period over, everyone approved and nothing changed since. Once it is locked, punches, time off and adjustments dated in it are refused with a plain sentence, such as "Sep 19, 2026 is in a locked pay period (Sep 7, 2026 – Sep 20, 2026). A manager can reopen it, or enter an adjustment in the next open period." The timesheets show the locked days. Reopen asks why. Once the payroll register is in the books, a period can no longer be reopened; a correction goes in as an adjustment in the next open period.

Every morning the server makes the next periods, and once a period has ended without being locked it tells the administrators and managers once: "Pay period Oct 1 – Oct 15 ended: approve and lock timesheets before payday Oct 20."

Earnings codes

CodeWhat it is
REGRegular hours
OTOvertime hours, paid at 1.5 times the rate in the period they fall in
PIECEPiece pay
OTPREMThe rest of the overtime premium, from piece pay or a minimum-wage top-up
MWTOPUPMinimum-wage make-up
PTO, HOL, SICKPaid time off, holiday and sick hours, entered per day under Time off
SALARYSalary for the period (not sent: providers pay salaries from their own records)
ADJAdjustments, with a reason, usually a correction from an earlier period

A workweek can cross the end of a pay period. A shift that runs past the start of a workweek (a Sunday-night shift into Monday) counts its hours in the workweek they were worked. Overtime hours are paid in the period they fall in; the part of the premium that comes from piece pay or the top-up, and the top-up itself, go with the period that holds the workweek's last day. The time clock has no way to mark a punch as paid time off, so time off is entered per day on the Time off tab (Add a holiday gives everyone paid by the hour the same holiday). Paid time off is not hours worked and never counts toward overtime. Codes add up to gross pay.

Sending it to the payroll provider

Send to payroll makes the file for Gusto (a row per person per workweek), ADP Workforce Now (the EPI file), Paychex Flex, QuickBooks Payroll or a plain CSV. Preview shows it before the period is locked; the file itself comes once it is. Each file sent is logged, and a copy is kept on the period. Payroll > Settings picks the provider, holds the provider's own names for each earnings code and the company or client numbers it asks for; People holds each person's ID at the provider. Salaries are left out, and contractors are listed apart and left out: pay them through Bills. A provider prices hours itself, so an adjustment on an hours code with an amount other than its hours at the person's rate (back pay entered as an amount, time off at an old rate) goes in the file as its hours plus the difference as a correction amount (ADJ) with its reason, and the file adds up to the approved gross.

None of these layouts has been checked against a real import by the provider yet. Run a test payroll with your provider first, and compare it with the period's figures.

The payroll register back into the books

After payday, Import a payroll register takes the provider's payroll register as a CSV. The columns are guessed for each provider and can be changed; titles, totals rows and withholdings printed as negatives are handled, and a total column wins over its detail columns so nothing is counted twice. The preview shows each person, matched by their provider ID and then by name. Every row must balance to the cent (gross pay − employee taxes − deductions + reimbursements = net pay), or nothing posts. Post to the books makes one journal entry dated the pay date:

DebitCredit
Wages, split by the period's labor by line: 5000 direct labor for job time and 5010 piece pay, each on its line; 6010 indirect and office wages for the rest (the person's home line, if set). A person who is not matched goes to 6010, with a warning.2310 Payroll liabilities, for employee taxes, deductions, employer taxes and employer contributions
Employer taxes and contributions, split the same way: 5020 labor burden on direct wages, 6020 payroll taxes and benefits on the restNet pay: 2300 Accrued payroll, or the bank account it was paid from
6030 Reimbursements

The same payroll cannot be imported twice: a file with the same pay date, gross and net pay as one in the books is refused, even downloaded again or saved with other line endings. A check date that is not a month/day/year date (16/10/2026, written day first) is refused too: type the pay date. Void posts a reversing entry (not once its bank line is matched or reconciled). The bank register names the entry "Payroll 2026-10-30 (Paychex)". The pay period is marked as in the books, and the Month-end close checklist counts it. The account numbers are the posting keys under Settings > Company; a missing account is added the first time it is needed.

Labor by line and burden

Labor by line sets each person's attendance hours against the hours logged on jobs, by line and by job, with the rest shown as indirect. Burden shows employer taxes and contributions as a percentage of wages, by month and by line, from the registers imported.

The outside accountant and the payroll registers

The Accountant (outside) role reads the payroll registers without Time & pay and without taking a paid seat: Finance > Payroll register lists each register imported, opens one person by person, and shows the burden by month and by line. It changes nothing there: no import, no post and no void. Administrators and the roles that see Payroll keep their own pages.

On Download for accountant, the Payroll registers choice, ticked to start with, adds a payroll-registers folder to the ZIP: registers.csv (one row per register, with its pay date, provider, period, totals, journal entry and status), register-lines.csv (one row per person on each register) and burden-summary.csv (wages, employer costs and the burden percentage by month and by line). It carries no timecards and no pay rates. A role that cannot see the payroll registers gets the ZIP without them, and its README says so.

What Amp-Hour does not do

It works out no taxes and no net pay, files nothing, and keeps no Social Security numbers, birth dates or bank account numbers. It records whether the shop calls a person an employee or a contractor, and exempt or not, but never decides it. Paid time off balances and accruals, shift differentials and paying contractors by the piece through bills are not built. The financial records ZIP (Settings > Data) carries the pay periods, the approved hours and pay, time off, adjustments, the imported registers and labor by line, for people who can see everyone's timecards (an outside accountant without Time & pay gets the books without them).

Financial reports, budgets and month-end close

The statements compared with last month, last year or the budget, a cash-basis profit and loss beside the accrual one, a statement of cash flows, budgets by account and month, a month-end checklist that ends with closing the books, one ZIP for your accountant, and the plating cost reports: chemistry per tank and per square foot, metal margin, and what each job cost against its price.

All of these are for administrators, managers and office staff, and custom roles built on those levels with Finance (the cost reports with Reports). The Financials page and the ledger are described on Invoicing, receivables, ledger and time.

Comparing periods

On Financials, the income statement has Compare to: the previous period, the same period last year, the budget, or two of them together. The previous period is the same number of whole months just before (or the same number of days, for a range that is not whole months). Each column has its own totals, with the change from the current one in dollars and percent. The balance sheet compares with the end of last month (or quarter, or year) and the same day last year.

Cash or accrual

The income statement has an Accrual and a Cash button. On cash basis an invoice counts when it is paid and a bill when you pay it, on each payment's date and in proportion to the document; credits and write-offs count the same way, and a payment that is voided comes back off on the day it was voided. Everything else (expenses, journal entries, stock) counts when it posts. A budget column is never on cash basis.

Statement of cash flows

Financials > Cash flow starts from net income, adds back depreciation and other non-cash items, and shows the change in each account under operating, investing or financing. Cash is the bank accounts and undeposited funds. The statement checks that the net change equals the change in cash and says so when it does not. Administrators and managers can move an account to another section.

Adjusting entries

A manual journal entry can be ticked Adjusting entry, the kind an accountant posts at year end, and the journal can list adjusting entries only. The outside Accountant's entries are adjusting entries whether ticked or not.

Adjusting entries in a closed month. On a closed month's Month-end close page an administrator can Allow adjusting entries… through a date, with a reason. Until then adjusting entries can be dated in that month; invoices, bills, payments and every other posting are still refused, and an entry not ticked Adjusting is refused with a message that says to tick it. Each adjusting entry posted that way, the grant and its end are listed in the month's history and the close log. Stop withdraws the grant early; the entries already posted stay. Reopening the month ends its grant too, so once the month is closed again adjusting entries need a new grant.

A manual entry can be reversed with Reverse… (a date and a reason) or on its Reverse on date, and the reversal of an adjusting entry is an adjusting entry too (see General ledger). Both are for the roles that may void: the outside Accountant posts adjusting entries but reverses none and sets no Reverse on date.

Budgets

Finance > Budgets keeps one budget per fiscal year, by account and, if you like, by line, month by month, in a grid with the totals worked out as you type. Start from last year fills it from last year's actuals plus or minus a percentage, by line or not, as a preview first. A budget also imports from a CSV file (account, line, then the twelve months; one bad row stops the whole file) and downloads in the same layout. Budget vs actual shows each account for a month and the year to date: budget, actual, the difference in dollars and percent, and whether it is good or bad (income above budget, costs below). A budget column on the income statement counts part of a month by its days.

Month-end close

Finance > Month-end close lists the last twelve months with how far each one's checklist has got. Each month has eleven items, and each item checks itself every time the page opens and has a sign-off (who, when and a note):

  • Required: bank and card accounts reconciled, receivables reviewed, payables reviewed, inventory counted or checked, and payroll recorded (the payroll register imported for the pay periods paid that month).
  • The others: undeposited funds cleared, everything shipped invoiced, received but not billed reviewed, the sales tax return recorded, income and costs on a line, and receipts attached.

Sign off what looks done signs every item whose check came out clean. Close the month, for administrators, needs every required item signed and then sets Books closed through to the month's last day. It is the one way to move the closing date forward; Settings > Shop > Books shows the date and its history. Reopen, also for administrators, asks why and moves the closing date back a month. From the 3rd of each month, while last month is still open, the server reminds the accounting staff once, for shops that use the closing date or the checklist.

Download for accountant

Download for accountant, on Month-end close and on Financials, downloads one ZIP for a date range (the fiscal year through the closing date unless changed), with a tick for each part:

  • Statements: a printable page with the statements, the trial balance, the profit and loss (with last year) and by line, the balance sheet (with last year's), cash flow, receivables and payables agings, the 1099 summary with masked tax IDs, sales tax, and budget vs actual when there is a budget.
  • Ledger detail: general ledger detail with running balances, the journal, the adjusting entries, the reconciliations finished in the range and the close log.
  • Documents: the records of the range as CSVs (invoices, payments, deposits, credits and refunds, purchase orders, bills, vendor payments, expenses, stock, and the payroll files for those who see everyone's time).
  • Attachments: the receipts, remittances and vendor documents attached to them, with a manifest.
  • Payroll registers: the payroll registers imported in the range, person by person, and the labor burden summary, with no timecards and no pay rates (see Payroll hand-off).

Money is in US dollars. With documents or attachments ticked, one download covers 366 days at most. The dialog lists the files before the download, and every download is logged.

The shop's outside accountant can sign in with an Accountant (outside) role made from its template under Settings > Team: it sees the books and reports, posts adjusting entries and downloads exports, and does not count as a seat, up to two per shop (see Team, notifications, messages and security).

Plating cost reports

Analysis > Cost reports has three reports for a date range (two years at most), for the accounting roles only:

Chemistry cost
What went into each tank each month, from tank additions at their cost, with makeups shown apart, rolled up by line. Beside it the square feet plated (finished loads, plus steps run outside a load), the chemistry cost per square foot, and per 1,000 amp-hours for each tank.
Metal margin
The precious-metal surcharge billed against the metal used: the part's metal factor × the quantity invoiced × that month's average price, with the base price already in the piece price. A metal with no price on record for a month is listed, not guessed.
Job cost and margin
For each job: labor at the people's rates, overhead, a share of chemistry (the job's square feet × its line's cost per square foot that month), outside processing and materials, against the job's price, with the margin in dollars and percent, by job, by customer or by process. Invoiced beside the price shows what has been billed so far. Reports > Job profitability shows these same figures. A job's own cost sheet shows the working.

The figures are as good as what is recorded: tank additions with their stock costs, the area of each part, labor logged on the job and the metal prices.

Switching from QuickBooks

Moving the books over is a set of steps on one page: pick the day QuickBooks stops, set up the chart of accounts, bring in the lists and the opening balances from files QuickBooks already exports, check everything against QuickBooks' trial balance, and close the old period. Every file is previewed row by row before anything changes, and an import can be undone while nothing has used it.

Finance > Switch from QuickBooks is for administrators, managers and office staff to look at, preview and map; the steps that change the books (the cutover date, applying or undoing an import, the chart of accounts, Finish) are for administrators. It works from QuickBooks Online and QuickBooks Desktop exports. The steps can also be used for another program's figures typed into our CSV layouts, which each step offers to download.

The cutover date

The cutover date is the last day your books are in QuickBooks, usually a month end. Opening balances are as of the end of that day, and Amp-Hour's books start the next day. It cannot be changed while opening entries for it are posted (undo them first), and it must be at least two days after any closing date already set. The page lists the steps with where each stands (to do, done, look at it, or optional) and a count of the checks that pass, need a look or need fixing.

The plating chart of accounts

Amp-Hour has a chart of accounts made for a plating shop: about a hundred accounts, from Undeposited funds and Goods received not invoiced to direct labor, piece pay, chemicals, waste treatment, repairs and the payroll accounts, each with its detail type and the job it does in the books. Some are optional.

  • A new shop with nothing posted yet can take it as it is: the starter accounts are renamed and the rest added, and every account the system posts to is pointed at its account.
  • A shop that already has accounts gets a suggestion for each template account: use one of yours, create it (at its number, or the next free number when yours is taken; your numbers never change), or skip it. Nothing is forced, an account can only be matched with one of the same type, Preview changes shows the plan first, and the whole change can be undone while the new accounts are unused.

The chart downloads as a CSV.

Bring in the files

Bring them in in this order: accounts, then customers, vendors and items, then the trial balance, open invoices, unpaid bills and bank balances. Each step says where to find the file:

StepQuickBooks OnlineQuickBooks Desktop
AccountsReports > Account List, exported to ExcelFile > Utilities > Export > Lists to IIF Files > Chart of Accounts
CustomersReports > Customer Contact List, or Sales > Customers > ExportLists to IIF Files > Customer List
VendorsReports > Vendor Contact List, or Expenses > Vendors > ExportLists to IIF Files > Vendor List
Products and servicesSales > Products and services > ExportLists to IIF Files > Item List
Trial balanceReports > Trial Balance, dated the cutover dateReports > Accountant & Taxes > Trial Balance, as of the cutover date, saved as CSV
Open invoicesReports > Open Invoices, as of the cutover dateReports > Customers & Receivables > Open Invoices, as CSV (or the invoices exported to IIF)
Unpaid billsReports > Unpaid Bills, as of the cutover dateReports > Vendors & Payables > Unpaid Bills Detail, as CSV

A file can be IIF, CSV or tab-delimited text, or an Excel .xlsx (the first sheet). Reports are read as QuickBooks lays them out: the title rows, group rows and "Total for" rows are skipped, and the report's total is kept to check against. A file with none of what the step wants says so in plain words, such as "This IIF file has no customers. It holds trial balance, open invoices, unpaid bills."

Preview, apply and undo

Every file opens as a preview first. Each row is ok, warning, error or skipped, with the reason. Before applying you can change what happens to any row (match it to an existing record, create it or skip it), the options for the step, and the account map from QuickBooks' accounts to yours. Apply brings the whole file in at once. Rows in error stop it, unless you choose to apply without them (never for the trial balance); Discard throws a preview away. Undo asks why, then removes everything the import made and puts back what it changed. It refuses, with the reasons, once anything has been used since: a payment on an imported invoice, a job for an imported customer, a closed period, a matched bank line. The audit trail keeps the record.

What each step does

Accounts
Each QuickBooks account is matched with one of yours (by the account map, number and name, name, QuickBooks' own system accounts, your only bank or card account, or the template's words) or created. The matches are kept in the account map.
Customers and vendors
An existing customer or vendor is matched and its empty fields filled in; new ones are added with their terms, address and contact. QuickBooks jobs ("Customer:Job") are skipped. A customer marked not taxable or with a resale number gets a pending certificate in the Sales tax certificates. A 1099 vendor is marked for 1099 with its tax ID stored encrypted; a tax ID that does not look valid is left out with a warning.
Products and services
Services become processes with their price; inventory items become stock items whose quantity and cost post as opening inventory on the cutover date. Bring them in before the trial balance.
Trial balance
One entry on the cutover date brings each account to QuickBooks' balance, less what Amp-Hour already holds, so a shop that has already been invoicing in Amp-Hour is not counted twice, and a second import of the same file posts nothing. Income and expenses come in as the year to date, or into retained earnings if you choose. Receivables, payables, customer credits and goods received not invoiced are checked, not posted: the open invoices and bills carry them.
Open invoices and unpaid bills
Each becomes a real invoice or bill for its open balance, with its own number, dates and PO, posted on the cutover date against Opening balance equity, so payments, credits and voids work as usual. The line says what came in ("Opening balance – QuickBooks invoice 1045 of Aug 28, 2026 ($3,100.00; $1,500.00 paid before the cutover)"). Customer credits become open credit memos, and vendor credits open vendor credits.
Bank balances
For each bank and card account: the statement balance on the cutover date and the checks and deposits that had not cleared. They must add up to the book balance, or the row says by how much they do not. The register opens at the statement balance the day before, and each item not yet cleared posts on the cutover date as its own line, ready to be matched and reconciled.

Checks, and finishing

Checks compares everything with QuickBooks' trial balance: the trial balance is in balance and posted, the books balance, every account equals QuickBooks, receivables equal the open invoices, payables equal the unpaid bills, each bank account has its statement balance, undeposited funds, inventory against stock on hand, and opening balance equity. It also notes the sales tax, the profit to date and 1099s. The checks download as CSV. Finish is open once nothing is left to fix; it closes the books through the cutover date, so the opening balances stay as QuickBooks had them. Reopen puts the switch back in progress without touching the closing date.

Not brought in: QuickBooks transactions from before the cutover date, payroll history, attachments, and this year's 1099 payments made in QuickBooks (add them as 1099 adjustments on each vendor; see Payables, vendor credits and 1099s).

Sending the books to QuickBooks or Xero

When your accountant keeps the books in QuickBooks or Xero, Export for QuickBooks or Xero (linked from Bills, and a card on Settings > Integrations) makes a ZIP of import files for a date range of up to a year: QuickBooks Desktop (IIF), QuickBooks Online (CSV) or Xero (CSV). Tick what goes in: invoices, bills, payments, and the other journal entries.

  • The list files come first: the chart of accounts with each account's number, the classes (QuickBooks Desktop), and the customers and vendors with their addresses. Every customer and vendor the transaction files name is in them, and a name used by both a customer and a vendor gets its code added, since QuickBooks keeps one list of names.
  • Every entry posted in the range follows, with each line's account (by number and name), customer or vendor, class and memo. QuickBooks gets them as journal entries. Xero gets invoices and credit notes as sales invoices, bills and vendor credits as bills, payments as bank statement lines for each bank account (to match in Xero's reconciliation), and the rest as manual journals. An expense reaches Xero as a bill coded to its accounts and lines, which its statement line pays. An entry the other system can't take is left out and listed to enter by hand: a receivable line with no customer or a payable line with no vendor in QuickBooks, and in Xero a manual entry on a bank, card or retained earnings account.
  • A read-me in the ZIP gives the order to import the files in and where each goes. No tax IDs or bank account numbers are in any file, and every download is in the audit log.

Live sync with QuickBooks or Xero is not offered: these are files to import. The layouts follow the import templates QuickBooks and Xero publish and have not yet been checked against a live company file, so import one month first and compare the trial balance before importing more.

Precious metals

For shops plating gold, silver, palladium or rhodium: the daily price is entered once or taken from the live spot price, every invoice carries the surcharge the price list did not anticipate, and a reconciliation shows how much metal went into the tanks against how much went out on parts.

Setting up metals, processes and parts

A metal has a symbol, a name, a unit (troy oz) and a base price, the metal price your price list was built on. The starter kit creates AU Gold, AG Silver, PD Palladium and RH Rhodium with base prices you then edit under Shop setup, or from the Metals and base prices button on the Metal prices page. A process has a Precious Metal field; set it on your gold and silver finishes. A part has a Precious Metal Factor in troy ounces per pricing unit: the metal that goes onto one piece (or one pound, or one square foot, whatever the part is priced per). The surcharge needs both: a metal on the process and a factor on the part.

Entering prices

The Metal prices page shows each metal with its latest price, the change from the previous price, the date, a 90-day sparkline, the base price and the resulting surcharge per ounce. Office, manager and administrator roles enter prices in the form beside it: a price date and a price per metal. Entering a price for a date that already has one replaces it. Below is the 90-day price history. The Dashboard shows the current prices as well.

Someone types in the morning fix, or the price your refiner quotes, and that is the price used from that date until the next entry. When the server has a live price source, the form shows the live price beside each metal and a click on it enters it.

Live spot prices

Give a metal a live price ticker on its Shop setup record: XAU gold, XAG silver, XPT platinum, XPD palladium, XRH rhodium, HG copper or NI nickel. The Metal prices page then opens with a ticker strip: one tile per metal with the spot price in the metal's own unit (troy oz, oz, g, kg or lb; any other unit shows the price per troy oz), the change against the base price as a green or red percentage, and how long ago the price was fetched and from which source. The strip reads again every five minutes while the page is open. A metal the source does not carry says so on its tile.

Use live as base on a tile, for office, manager and administrator roles, sets that metal's base price to the live price in one click; the change is in the audit log. Tick Keep base price at the live price on a metal and its base follows every refresh on its own; the tile and the price form mark it auto, and today's row in the price history follows the live price too, so the reconciliation values metal at the live price. Entering a base price by hand works as before.

An administrator chooses what the surcharge uses, in the ticker strip: the daily price (the default) or the live price, which falls back to the daily price when no live price is on hand. Administrators also have a Refresh button that fetches at once; because the price source's quota is shared by every shop on the server, it works only once enough time has passed since the last fetch (five minutes for gold-api, thirty for metal-sentinel, the full refresh interval for the two sources with small free quotas). Live prices are indicative spot prices from a public data provider, not a dealer quote: shops that bill on their refiner's fix keep the daily price.

Who sets it up: the live feed is configured once for the whole server, not per shop. Amp-Hour fetches the prices for every shop in one call per interval and keeps them in memory, so free provider plans last, and it fetches nothing while no shop has looked at its metal prices for a day. The last prices are stored with each metal, so the page and the surcharge keep working while the provider is down; a failed refresh shows a notice in the strip. A self-hosted shop sets METALS_PROVIDER (gold-api, which needs no key; metals-dev, metalpriceapi or metal-sentinel with METALS_API_KEY) and optionally METALS_REFRESH_MINUTES in the server's .env file; the deployment guide lists each provider's free tier and the metals it covers. Rhodium needs a provider that lists it. When no source is configured, administrators see a note in place of the strip and nobody else sees anything. The platform console's Server page shows the source, the last fetch and the last error.

How the surcharge is computed

When a shipment is invoiced, each line whose process carries a metal gets a surcharge:

surcharge = metal factor × billed quantity × (price on ship date - base price)

The price on the ship date is the latest price entered on or before that date, or the live spot price when the shop has chosen it and one is on hand. When the price is at or below the base there is no surcharge. The line description names it, for example "AU surcharge @ $2465.14/oz (base $2350)", or "AU surcharge @ $2471.30/oz (live spot 2026-10-08 14:02 UTC, base $2350)" when the live price was used, and the invoice prints a separate Precious metal surcharge line and a Surcharge row in the totals. In the sample shop, 20,000 pins at a factor of 0.00008 troy ounces each with gold at $2,465.14 against a base of $2,350 add $184.22 to an $8,400 invoice. The surcharge posts to its own revenue account, 4900 by default, so it is separate from processing revenue in the ledger and in the Sales by customer and Sales by process reports. Manual invoices carry no surcharge. The quote form tells the customer that prices for precious-metal finishes are based on the metal price on the quote date and that a surcharge applies when the daily price exceeds the base (the spot market price when the shop's surcharge uses the live price).

Metal in inventory

Gold salts, silver anodes and the like are inventory items in the category precious metal or anode, in troy ounces, with an SDS link like any other chemical. The sample shop carries AU-PKCN, potassium gold cyanide at 68.3% Au, in the vault. Receive them against a PO like any other stock, and get them into the tank through a tank addition that names the item, so the issue is recorded against the tank. The reconciliation depends on both habits.

An add request line for a precious-metal item (the precious metal category) needs a witness, someone other than the person adding it. The witness types their lab PIN on the same phone, or confirms on their own login within the shop's window (15 minutes unless changed); until then nothing is taken from stock or posted. Lab settings can ask for a witness on every line instead. See Tank chemistry.

Metal reconciliation

The Metal reconciliation page, for administrators, managers and office staff, covers a date range (90 days by default) with one row per metal:

Purchased
Quantity received on inventory items in the precious metal or anode categories whose SKU or name contains the metal's symbol or name.
Added to tanks
Quantity of those items posted as tank additions in the period.
Plated out
Invoiced quantity times the part's metal factor, for every invoiced job whose process carries this metal.
Unaccounted
Added to tanks minus plated out, with the percentage. Shown in red when it exceeds 20% of what was added.
On hand
Quantity in stock and its value at the latest price.
Surcharge billed
Total surcharge invoiced for the metal in the period.

A large unaccounted balance is usually one of three things: drag-out to the rinse and recovery, a part factor that has not been checked against a stripped-sample assay, or an addition posted as a description instead of a stock item so it never counted. The page says as much under the table.

Reports

Metal price history lists every price entered with the base and the surcharge per ounce it produced, for a date range, as CSV or print. Sales by customer and Sales by process show processing and metal surcharge in separate columns. Shops that do no precious-metal work can switch the Precious metals module off under Settings > Modules, and the group leaves the sidebar.

Customer portal

A customer you invite signs in and sees their own jobs, shipments, certificates, invoices, statement, quotes and samples, and nothing of anyone else's. It answers "where is my order", "send me that cert again" and "where do I send the check" without a phone call, and a customer can accept a quote there with their PO, or approve a deviation you asked for.

Giving a customer access

Under Settings > Customer portal, press Invite on the customer's row and enter the person's email. The invitation is bound to that customer. The link is valid for 7 days. Portal users are free: they do not count toward the staff logins on your plan. A customer record has a Customer Portal Access switch, on by default; turn it off and every portal user of that customer is refused at sign-in. A portal user is bound to one customer, and every query the portal makes is filtered by that customer on the server. Portal users cannot open any staff page or call any staff route, and they do not take part in Messages.

What the customer sees

The portal sidebar has Jobs, Certificates, Invoices, How to pay, Statement, Quotes, Samples, Request a quote, Deviations and Account. Certificates, Invoices (with How to pay and Statement), Quotes, Samples and Request a quote appear only when the shop has them switched on under Settings > Customer portal. The home page carries your shop's name and phone, the note you wrote in settings if there is one, a line when a deviation request is waiting for their answer, a strip with jobs in process, shipments in the last 30 days and the open balance (and the credit on their account when there is any), then two tables.

Jobs in process
Job number, the customer's PO, part number and revision, the finish, quantity, date received, the promised date (and the new date when the shop gave one), a progress bar of the steps done with "Step 4 of 7" (and, once part of the job has shipped, how many pieces are still to ship), and where the job stands: Received, In process, Inspection or Ready to ship, with On hold and the note the shop wrote for the customer, and Late once the promised date has passed. On a phone the finish, the date received and the quantity are left out and the PO, the promised date and where the job stands sit under the job number, so the table fits the screen.
Recently shipped
The last 25 jobs with a shipment, with quantity shipped ("60 of 200" for a job still shipping in parts) and the promised date.

Recently shipped puts the last shipped first. Each job shows the date it last shipped with a link to that packing slip, the carrier of each shipment with its tracking number, and the job's certificates when the shop shows certificates. A UPS, FedEx or USPS tracking number is a link to the carrier's own tracking page; the carrier the shop typed decides, and with no carrier the number's own pattern does (a number that could belong to anyone else stays plain text). The job page shows the same links under Shipments and certificates.

Opening a job shows where it stands as a line of stages, Received, In process, Inspection, Ready to ship and Shipped, with "Step 4 of 7" and a bar of the steps done. The shop's own step names are behind Step details: a check and a completion time for each one done, "Partly done (60 of 100)" for a step worked in portions, "In progress" for one that has started. The customer sees the step names, how far each has got and when they finished; tanks, times, temperatures, readings, reasons and operator names stay inside the shop. The details card has their PO and packing list number, the quantity and what has shipped ("Partly shipped: 60 of 200 shipped · 40 ready · 100 in process" while the job ships in parts), received and promised dates (a promised date that has passed is marked Late, with the new promise date under it when the shop gave one), the lot number and the receiving note the shop wrote for the customer when the parts came in. Below it are the shipments for the job with date, pieces, "Partial 1" or "Final 3" and the pieces still to follow, carrier and tracking number, and the certificates, one per shipment.

Where a job stands, holds and late jobs

A job that waits says why. When the office places a job on hold it can write a note for the customer, such as what it needs from them, and give a new promise date; the hold's own reason stays inside the shop. The portal shows the note and the new date on the job and in the Jobs in process table while the job is on hold, and the office can add or change them later from the job page, also on a hold an incoming inspection placed. A job whose promised date has passed is marked Late until it ships; the new promise date shows beside the original one, which is not changed.

The job page also lists the deviation and waiver requests that cover the job, those waiting for an answer first, each with Answer (or Open once answered), and Ask about this job on a held job opens a message to the shop with the job number written in.

Certificates, shipments and invoices

Certificates lists every cert of compliance issued to the customer with job, their PO, part number, quantity, shipment and date issued. Opening one shows the same certificate document the shop printed, with a Print button, so a customer who lost the paper copy gets it themselves. A shipment opens as the packing slip, with a button to each cert on it.

Download PDF on a certificate, an invoice and a quote saves the same PDF the shop emails, for the customer's own documents only. A certificate shows the step names and the dates they were done; who did each step and the step parameters (tank, time, temperature, amps and volts) print only when the shop turns them on in its certificate settings, so by default they stay inside the shop, as on the job page. A certificate issued while they were on keeps them. Until the shop's QC has reviewed and signed a certificate, the signature box on its page reads "Not yet signed" and so does its PDF. A signed certificate carries the signer's name, title and date on its page, and its PDF ends with "Signed:" and the same. On a phone the certificate scrolls sideways inside the page instead of being cut off at the edge.

Invoices lists every invoice that is not void with the customer's PO, date, due date, total, balance and status. Each opens as the same invoice you print, in your invoice design (Settings > Invoices): your logo, colours, remit-to address, payment instructions and notes. It prints or saves as a PDF. An open invoice has How to pay and Tell us you paid above it, and a payment the customer has said is on the way shows there too.

Paying you

Payment is not taken online through the portal: there is no card or bank payment form. The portal tells the customer how to pay and lets them say a payment is on the way.

How to pay
The open invoices with the balance owed and any credit on the account, and Where to send payment: who checks are payable to, the address to mail them (the lockbox when the shop uses one), a reminder to write the invoice numbers on the memo line, and the shop's ACH and wire instructions when it gives them. The bank details are shown only to signed-in portal users and are never put in an email, with a warning that the shop never changes its bank details by email. The shop sets all of this under Settings > Getting paid.
Tell us you paid
On How to pay and on an open invoice, the customer says "I mailed a check" or that an ACH or a wire was sent: how they paid (a check by mail, an ACH or a wire transfer), the check number or reference, the amount, the date sent and which invoices it is for. No money moves. The office is notified, the invoices show the payment as on the way, and they get no payment reminders while it is expected (14 days unless the shop changes it). When the office records the payment, the notice closes; the customer can cancel one sent by mistake.
Statement
The same statement of account the office prints: the opening balance, every invoice, payment, credit and adjustment in the period with a running balance, and the open invoices, from any start date. It prints or saves as a PDF. Statement emails from the shop link here.
Payments received
Each payment the shop has recorded: date, how it was paid, the check number or reference, the invoices it paid, the amount and its status (a returned check shows as returned).

Quotes lists quotes once they are past draft, with date, valid-until date, total and status. Opening one shows its lines and total, and a sent quote that has not expired can be answered. Accept the quote takes the person's name and title (filled in from their sign-in), their PO number, their full name typed as a signature and a note; the name, the time and their sign-in are recorded with the order. Decline takes a name and, if they like, why. The shop's office is notified either way, the quote's status changes to Accepted or Lost, and the accepted PO fills in when the quote is converted to jobs. After accepting, the customer can change the PO or decline after all. A draft, expired, declined or converted quote cannot be answered.

Accepting can also attach the customer's PO document, a PDF, a picture or an Office document of up to 10 MB, which the shop keeps with the quote. The office's notice of the acceptance names it, and the quote's "Answered in the portal" card links it so the office opens it from the quote. The person who accepted gets an email confirming it, with the accepted quote attached as a PDF, the PO number, the PO document's name and the signature line as they typed it.

Samples lists the parts the customer sent to try a finish: each open sample, and each one approved in the last six months, with where it stands (New, Quoted, Running, Shipped, or "Approved – now a production part"), its quotes when quotes are shown, and its jobs, which open like any other job. A sample job carries a Sample badge in the job lists.

Deviation requests

When the shop asks the customer to accept work that departs from a requirement (see Quality), the request shows under Deviations once it is sent: what deviates (the spec and clause, the characteristic, what is required and what is proposed), why the shop asks, the jobs, lots or part it covers, the quantity limit and expiry, and the photos and files the shop attached. Drafts and the shop's internal notes are never shown.

  • Approve takes the person's name, title and the date, and a note such as their own concession number. The name, and the title when the shop has it on their login or their contact, start filled in from their sign-in.
  • Decline takes a name and a note on what they would accept instead, and asks to confirm.

The answer, the time and their sign-in are kept, the shop is told at once, and the request then shows who answered and when. A request can be answered once.

The same request can be emailed with an approve or decline link. The link opens a plain page with the shop's name and logo and the same Approve and Decline, with no sign-in, so a customer without portal users can answer too. Anyone who has the link can answer, so the page says to keep it to themselves. A link the shop has replaced or cancelled says it is no longer valid.

Requesting a quote

Request a quote is a subject line and a details box for part numbers, material, finish and spec, quantities, due date and whether drawings are available. Sending it creates a follow-up on the customer's record in your CRM, due today, with the details and the name of the person who asked, and every administrator, manager and office user gets a notification "Quote request from" that customer, linked to the request.

A request can carry up to five drawings, each up to 20 MB: PDFs, pictures, DWG or DXF drawings, Office documents or ZIP files. They are kept with the request, and the office opens them on the request's page, which also offers Quote this. The office's notice of the request opens that page, and so does the request's activity in Activity and follow-ups on the customer's record. My requests, under the form, lists every request the customer has sent with who sent it, its drawings, where it stands (Waiting for a quote, Being quoted, Quoted or Closed) and the quote it became, which opens in the portal once it is sent. Request this again on a job page, and next to a part found with the search box, opens the form with the part and revision, the finish and the quantity last ordered already written in the details, to change before sending.

Email to customers

Two switches on the customer record send mail without anyone doing anything, and the shop can send statements and payment reminders too (see Invoicing, receivables, ledger and time). Email When Jobs Ship sends a notice for each job shipped with the part, quantity (with "partial; 140 to follow" when more pieces are coming), carrier and tracking number and a link to the shipment in the portal. Email Invoices sends each invoice as it is raised: the invoice itself in your design, with its lines, totals and payment instructions, and a link to it in the portal. Replies go to the billing email set under Settings > Invoices. Both go to the customer's contacts with email addresses, the primary contact first.

Email when received, a column on Settings > Customer portal, sends a receiving notice: once it is ticked for a customer, each job received for that customer from then on is announced by email, once, within about five minutes: the job, part number and revision, the counted quantity, their PO and packing list, the promised date and the receiving note. Jobs received before it was ticked are not announced.

Who gets them. Each of these emails (the receiving notice, the shipment notice, the invoice, statements and payment reminders) goes to up to two of the customer's contacts, the primary one first, the email on the customer record and every portal user of that customer, once per address. A portal user can turn the receiving, shipment and invoice emails off for themselves on their Account page (they are on until they do); the customer's own switches still decide whether the customer gets that email at all. Replies go to your billing email under Settings > Invoices, or to the shop owner's email when there is none, so a customer who answers a notice reaches you rather than an unanswered mailbox.

Quotes and deviation requests. Moving a quote to Sent emails the same people its total, the date it is good until and its lines; portal users get a link to accept or decline it in the portal, and everyone else is asked to reply with their PO number. Sending a deviation request to the portal emails the customer's portal users a link to approve or decline it. Both also put a notification under each portal user's bell that opens the quote or the request. When the customer has nobody to tell (no portal users, and for a quote no contacts or email either), nothing is sent and the person who sent it gets a "No one to notify" notification. A quote saved again while it is Sent tells nobody twice, and the emails it sent are listed under Emails sent on the quote.

The portal user's own account

Account lets a portal user change their name and password. Security gives them the same two-factor authentication, signed-in device list and security activity as staff. A portal user who also belongs to another shop switches between them under Account. A shop that does not want the portal switches it off under Settings > Customer portal. The pricing page is plain about it: every plan has the customer portal, and portal users are free.

Account also has Emails from your shop: one switch each for the receiving, shipment and invoice emails, saved as it is ticked, and a note on any your shop does not send that customer at the moment. Where staff have Report a problem, a portal user has a Message link with your shop's name, in the sidebar and the menu under their name. It opens a box for their message with your phone number for anything urgent; the message goes to your administrators and office staff under the bell and by email (reply to the email to answer), is kept as a follow-up on the customer's record, and never goes to Amp-Hour support. A portal page that fails to load says so and offers Report this, which is different: it sends the error, with the page and the browser, to Amp-Hour support so it can be fixed, and does not go to your office.

Setting it up

Settings > Customer portal is one screen for administrators and managers. The top card holds the shop-wide switches: whether the portal is on at all, whether customers can request a quote, and whether invoices, quotes, certificates and samples are shown. Below them is a note of up to 500 characters that appears at the top of every portal user's home page; shops use it for office hours or the name and number of the person to call about an order. An administrator changes the switches and the note and presses Save. Switching the portal off refuses every portal user on their next request. Switching one feature off removes its page from the portal sidebar and refuses the matching routes on the server, so a bookmarked link does not get around it.

Under the switches is a table with one row per active customer. The Portal access, Email when jobs ship and Email invoices columns are the same three switches as on the customer record, and Email when received turns on the receiving notice; each is saved as soon as it is ticked. The Portal users column lists each person who has accepted an invitation, with their email and a Remove button, and each pending invitation with its expiry date and a Cancel button. Invite on the row opens the invitation form with the customer already chosen, so the only thing to type is the email address. The Team tab keeps staff; it links here for portal users.

Library

The Library is where a shop keeps its own files: process data sheets, SOPs, drawings, customer specifications, certificates, photos of fixtures, anything worth finding again. Folders inside folders, uploads by drag and drop, previews, a ZIP of any folder, and storage that comes with the plan. It sits under Overview in the sidebar, apart from the controlled documents under Quality, which keep their revisions and approvals.

The Library page

On a desktop the page has two panes: the folder tree on the left, the contents of the chosen folder on the right. On a phone it is one column with a breadcrumb. Each row shows an icon by type, the name, the size, who uploaded it and when. Folders show how many files they hold. Clicking an image or a PDF opens a preview (images in a dialog, PDFs in a new tab); any other file downloads. The top bar has a search box that matches names and descriptions across the whole Library, and the storage bar: how much of the allowance is used, with a link to add more once four fifths are taken.

The toolbar has New folder, Upload and Download as ZIP. Every row has a menu: Rename (with a description line for files), Move (a folder picker showing the tree), Replace (new content, same record), Download and Delete. Ticking several rows shows Move and Delete for the lot. An office, QC, manager or administrator role adds to the Library; every staff role reads it.

Folders and restricted folders

Folders nest as deep as needed and names are unique within a folder. A folder's properties hold its name and the Restricted switch: only administrators and managers can open a restricted folder, and everything under it is hidden from everyone else, in the tree, in search and in downloads. Proprietary bath formulations, pricing sheets and personnel paperwork go there. Deleting a folder that still holds something asks a second time and then removes everything inside; moving a folder into one of its own subfolders is refused.

Uploads

Choose files with Upload or drop them anywhere on the contents pane; several at once is fine. Each file shows its own progress row and a reason if it is refused (a name already used in that folder, a file over the 200 MB per-file limit, or storage full). Files go up as they are, without being re-encoded, so a 150 MB drawing package takes as long as the connection allows and no longer. Replace on a file's menu uploads new content onto the same record, so links and the description stay.

Downloads and ZIPs

Download as ZIP on a folder packs the folder and everything under it with the folder structure kept. One archive holds up to 2 GB; a larger folder is downloaded subfolder by subfolder. Settings > Data has Library (ZIP) for the whole Library next to the database backup, under the same 2 GB rule. The service's own backups copy the Library's files, the documents on parts and the files on records alongside each shop's database and keep them for the same retention.

Files on records

Apart from the Library, files belong on the record they are about: the receipt on a bill, an expense or a bank line, photos on a job or an NCR, the lab's PDF on an outside lab report, a Hull cell panel's photo, the signed check, a reconciliation's bank statement, the COA of a reagent bottle, the written opinion on a Cr(VI) exam. A Files card on those pages shows each file as a thumbnail or a type tile; tapping one opens it in place (a picture) or in a new tab (a PDF), with Download, Rename and Remove. Add file takes several at once, a computer can drop them on the card, and on a phone Take photo opens the back camera. Each file shows its own progress and, if refused, why.

Photos are shrunk on the phone or computer before they go up, as the shop's Photo size says (Settings > Billing, under Storage; an administrator chooses): Standard, the default, keeps 1,600 pixels on the long side, about 0.3 to 0.5 MB for a phone photo; High keeps 2,400 pixels, about 0.6 to 1.2 MB, for photos of paperwork, scans, stamps and small markings; Original keeps the photo exactly as taken, about 3 to 6 MB from a phone, including any location the phone stored in it, and an emailed report then carries fewer photos. Shrinking drops that location, and a small thumbnail goes up after. Every picture added to a record follows the setting, screenshots and scans saved as JPG or PNG included; PDFs and other documents, and anything in the Library or a part's Documents, are kept exactly as uploaded, so prints belong there. A change applies to the next photo added on every phone and computer, without reloading; photos already added stay as they are, and a part's Part image, stored with the part, stays at most 2,400 pixels.

Files go up to 25 MB each: pictures, PDFs, text and CSV files, Office documents, drawings (DWG, DXF), ZIP archives and short videos. The kind of file is read from the file itself, not from its name, and its name is made safe; a file that is none of these is refused with "This kind of file can't be added". The same file added twice is stored once, and adding it again says where it already is when the person may see that record. Who may add or remove files follows the record: finance files for the office and managers, for example, while anyone who can open a job can add a photo to it.

Removing a file from a record, or deleting it, keeps it for 30 days in case it was a mistake (receipts and other finance files for seven years), out of the storage count. Administrators and managers find them under Settings > Data > Recently deleted files with Restore. Settings > Data also has Files on records (ZIP) for administrators: every file on a record, in a folder per record, with a list of what is where. Attachments added before files moved to their own store keep their links.

Storage by plan

Storage counts every file the shop keeps: the Library's files, the documents on parts (prints, photos, specs), the files on records (receipts, photos, lab reports, SDS sheets, equipment manuals), part images and the shop logo. A file on several records counts once, deleted files do not count, and the database itself is not counted.

PlanStorage
Starter2 GB
Professional (and the trial)10 GB
Business50 GB

When an upload would go past the allowance it is refused with the figures ("Storage is full: 9.8 of 10 GB used") and nothing is lost, wherever the file was going: the Library, a part's documents, a file on a record, a part image or the logo. Saving a record whose picture is unchanged or smaller always works, so a full shop keeps working while it makes room. Settings > Billing shows the plan allowance and any add-on, and Request storage sends us the gigabytes wanted and a note. We reply by email with the price; once agreed, the extra gigabytes are added to the shop and the bar shows them. An add-on can be added to any plan.

What is using the space

For administrators and managers, the Storage card under Settings > Billing splits the bar by kind of file, each in its own colour, with a legend of sizes: Library documents, Images and photos, Videos, Prints and drawings (part documents typed as prints, and PDF, DWG and DXF files on parts), Receipts and bills (files on bills, vendor payments and vendors), Part documents (specs and other files on parts), Job and NCR attachments, and Other (SDS sheets, files on equipment and customers). The rest of the bar is what is still available. Clicking a kind lists its largest files, each with a link to open it and a link to where it lives (the folder, the part, the bill, the job), so the files worth deleting are one click away. Files in areas a custom role does not include are counted but not named.

Team, notifications, messages and security

Each person has one of six built-in roles, or a custom role the shop defines or adds from a template, and the server checks it on every request, not just in the menu. Notifications tell people what needs them, in the app or by email, messages let them talk about a job without leaving it, and Settings > Security shows every device and every sign-in on the account.

Roles

RoleCan do
AdministratorEverything, including team, billing, appearance, fields, data and settings.
ManagerProduction, quality and accounting. Team and billing too.
OfficeSales, shipping and accounting: quotes, receiving jobs, shipping, invoices and payments, bills, expenses and checks, banking, the ledger and reports.
QCProduction, quality and shipping. Receives jobs, signs off inspections and certs. No receivables, payables or ledger, and no prices or costs.
OperatorShop floor and time clock: scan, log runs, complete steps, record tank tests, do add requests, post tank additions, issue stock. No prices or costs.
Customer portalTheir own jobs, certs, shipments, invoices and quotes, and nothing else. See Customer portal.

The sidebar hides what a role cannot use, and the API refuses it anyway. Receivables, Bills (with the payments made on them), Expenses, Checks, Banking, Finance and Reports are for administrators, managers and office staff. Receipts, the inbox for snapping a receipt with a phone, is for everyone. Receive job, Capacity, Ship and Processes are for those three plus QC; anyone with Maintenance sees the PMs, and those four set them up.

Prices and costs are for administrators, managers and office staff, and for custom roles built on the manager or office level. For QC, operators and every custom role built on those levels (Lab technician, Polisher, Polishing inspector), the server leaves them out of what it sends: part, job and quote prices, stock costs and values, purchase order amounts, tank addition costs, labor and piece-pay rates, job costing, NCR and return costs, and the invoices and balances on a customer's page. The screens hide those columns rather than show them blank, and a form such a person saves keeps the prices already stored; they cannot set a price they cannot see. Precious-metal market prices stay visible to anyone with that module.

Custom roles

When the built-in roles do not fit, an administrator defines a role of their own under Settings > Team, for example "Maintenance tech" or "Lab". A custom role has a name, a level and a list of modules. The level is one of the built-in staff roles (manager, office, QC or operator, never administrator) and sets what the person may do inside the modules they have: approve, edit and delete at manager level, create and edit records and see prices at office level, production and quality work without prices at QC level, shop-floor work and the time clock at operator level. The modules are the areas the role may open: Sales, Production, Polishing team, Tanks, Quality, Environmental, Maintenance, Shipping, Receivables, Payables, Inventory, Time, Finance, Precious metals, Reports, Library and Shop setup. A custom role can never do more than its level could.

The dashboard, tasks, messages, notifications, the account pages and clocking in and out are always available. Everything else is hidden from the sidebar and refused by the server with a message naming the module. Members and invitations show the role's name wherever a role is shown; renaming a role keeps its members, and a role cannot be deleted while anyone holds it or an invitation for it is pending. Managers can assign custom roles when inviting people, except roles built on the manager level, which only an administrator may grant.

A shop that uses Tanks gets a Lab technician role, added once and editable like any other: QC level, with Tanks, Quality, Inventory and the time clock. A lab technician records tank tests, sends and does add requests, edits test methods and each tank's test set-up, and sees chemical stock without prices or costs (see Tank chemistry).

A chrome shop that opens Environmental > Cr(VI) exposure gets an EHS coordinator role, added once: manager level, with Environmental compliance and the time clock. The Cr(VI) exposure and medical records are for administrators, managers and roles on the manager level only (see Environmental compliance).

The Polishing module adds two custom roles the first time it is used, Polisher and Polishing inspector (see Polishing team). An inspector records inspections and deletes only their own records. Moving owed rework (reassign or write off) and finishing or cancelling someone else's polishing run is for administrators, managers, office staff and anyone ticked Polishing supervisor, a flag set per person under Settings > Team.

Roles from a template

Settings > Team has Add a role from a template, for administrators: each template shows its level, the modules it sees and what it may do, and adding one makes an ordinary custom role that can be renamed and changed like any other.

TemplateWhat it is for
BookkeeperOffice level: invoices, bills, payments, banking, inventory, time and journal entries; does not approve bills or close a month.
Accountant (outside)Office level, view only: the books, receivables, payables, inventory and reports; posts adjusting entries and downloads exports. Free: not counted as a seat, up to two per shop.
Quality managerQC level: NCRs, returns, certs, QA tests, documents and training; sees production, the tanks, shipping, compliance and maintenance; no prices.
Shipping and receivingQC level: receives jobs and ships them, with packing slips, certs and labels; no prices.
Maintenance techOperator level: work orders, PMs and equipment; sees the tanks.
Floor supervisorQC level: jobs, the board, polishing, tanks, quality, maintenance and shipping; no prices.

What each role may do

Six actions go beyond opening a module: post journal entries, close a month and set the closing date, approve bills, void documents, import data and export data. The What each role may do grid on Settings > Team shows them for every role, with a View only tick for custom roles. An administrator may always do all six and changes the grid; everyone else can read it. Unless changed, managers have all six, office staff post journal entries, void, import and export, and QC and operators have none. A custom role follows its level until its actions are changed, and Reset puts it back, so no existing role does anything different until someone changes it. The server refuses an action to a role without it, with a message naming the action, and a role ticked View only changes nothing beyond the actions it is given.

Adding people

Settings > Team shows how many team members the plan allows and how many are used (pending invitations included), the members with their sign-in, role and last sign-in, pending invitations, and the role list. Invite by email takes an address and a role; the link is valid 7 days and an invitation can be cancelled before it is accepted. Add shop-floor login is for operators without email: a name, username and password, and they sign in with the shop ID, the username and the password. Either way a person gets a badge or clock number for the time clock and scanner, a pay type with an hourly rate or an annual salary (administrators only), a job title and, for the time clock, a weekly schedule with lunch and break minutes. The Time & pay card under Settings > Time clock & pay sets the sign-in clock-in prompt, the grace minutes, the lunch and overtime thresholds and the roles that see everyone's timecards; the Accounting chapter describes the timesheets. Administrators can reset the password of a shop-floor login; someone who signs in with an email address resets their own with Forgot password? on the sign-in page, since that one password also opens any other shop they belong to. Removing a member ends their access to the shop at once; their labor and sign-off history stays on the jobs.

The shop-floor terminal and the time clock kiosk run under one login, and customer-portal users are free, so the staff count is the people who sign in from the office and the line. The shop owner can transfer ownership to another administrator or delete the shop under Settings > Shop.

When the team is full. Each plan includes a number of team members: Starter 5, Professional 25, Business unlimited. A pending invitation holds a seat until it is accepted, cancelled or expires. Adding one more person than the plan holds opens a short dialog instead: "Your Professional plan includes 25 team members." From there the owner can upgrade to the next plan under Settings > Billing, or anyone who adds people can ask about custom pricing: the team size needed and a message go to support, and the reply comes by email. Once a price is agreed, support sets a custom plan on the shop with its own team-member and storage limits, and Settings > Billing shows it. Removing a member or cancelling an invitation frees a seat. A shop that is already over its limit keeps working; it just cannot add more people until a seat is free. Members of a role made from the Accountant (outside) template, and kept within that template, take no seat, up to two per shop; the Team page says how many of those free places are used ("1 of 2 free accountant places used"), and moving such a member to another role needs a seat.

Settings in one place. The shop's own details are a tab of Settings. Company holds the name, address, phone and time zone that print on every document, the certificate statement and signer, the sales tax rate, the default lead time a new quote line starts with, the next document numbers, the old discharge log's wastewater limits (a minimum and maximum pH and a maximum for each metal) and every posting account the books use, each picked from the chart of accounts in five groups: Cash, Receivables, Payables, Tax and Payroll. A posting account must be an active account of the chart, and the limits must be numbers, so a typing slip is refused when you save instead of posting to an account that does not exist. Time clock & pay holds the clock rules and the pay schedules. The invoice's thank-you line is set only under Invoices and the remit-to address only under Getting paid. The search box at the top finds settings by what is on them: typing "time zone" offers Settings > Company.

Removing a custom field. When a Save under Settings > Fields and terms would remove a custom field, the page first says how many records hold a value for it. Hide (keep values) takes the field off the forms and keeps the values on the records, so adding a field with the same name later shows them again. Delete values removes them from the records, and the audit trail keeps what was deleted.

Notifications

The bell in the top bar shows the unread count, which goes up as a notification arrives, and opens the latest notifications. The Notifications page lists all of them, and each one can be opened, marked read or unread, or deleted, singly or all at once. Notifications are written when something needs a particular person:

  • An NCR is assigned to you as owner, or a task is assigned to you.
  • A work order is assigned to you, a PM you are assigned comes due, a work order you requested is finished, or an urgent work order is opened (administrators and managers).
  • A wastewater sample is out of permit limits (administrators, managers and QC).
  • A tank test is out of spec (administrators, managers, QC and lab technicians, but not the person who recorded it).
  • An add request is sent to you or your role, or is overdue; one you sent is started, done or sent back as can't do; a re-test you asked for is due, or comes back still out of spec. New, overdue and sent-back requests and re-tests due are emailed too when the shop's mail is set up.
  • A tank test is overdue (the lab: QC-level people and lab technicians, unless Lab settings names another role), and later still overdue (managers, unless changed); a reagent bottle has expired or is due to be standardized; an instrument's daily check is missing or failed; a test breaks an SPC rule (the lab).
  • A precious-metal addition is waiting for a witness (the person who asked, the lab, administrators and managers); yours was witnessed, or the window ran out.
  • A chrome tank's surface-tension reading is due within the hour, overdue, still missing a day later, or over the limit; Cr(VI) monitoring, an exam or an employee's notice is coming due (administrators, managers and, for the surface-tension log, QC-level people).
  • A customer requests a quote through the portal, or says in the portal that a payment is on the way (administrators, managers and office staff).
  • The ACH or wire instructions customers see in the portal are changed (every administrator).
  • An inspection sends polishing rework back to you, or someone reassigns rework to you ("Rework to redo: job 50001"), with a link to the step.
  • A QA test fails (administrators, managers and QC), an inspection on a salt spray or humidity test is due, a test has run its hours, a result is waiting for review, or a step that must start within a time limit is halfway through its window, nearly out of it, or late (administrators, managers and QC).
  • A bill is waiting for your approval, or a bill you entered was approved or sent back; a recurring bill was saved for review (the accounting staff).
  • A pay period has ended without being locked (administrators and managers); last month is still open after the 3rd (the accounting staff, for shops that use the close); a customer's exemption certificate expires soon, an exempt customer has none on file, or a sales tax return is due or late (the accounting staff).
  • A PM work order is raised for you, or goes late (administrators and managers when nobody is named).
  • A wastewater result is over a limit that is on (administrators, managers and QC), with its two tasks for the permit's responsible person; those tasks, and samples sent to the lab with no results after 14 days, are reminded each morning.
  • A customer accepts or declines a quote in the portal (administrators, managers and office staff).
  • Someone writes to you in Messages.

How notifications reach you

Settings > Notifications (and Settings at the foot of the bell's list) lets each person choose, for each kind of notification, whether it shows in the app and whether it is emailed right away, put in one daily summary email, or not emailed. The kinds are add requests; tests due and overdue; reminders (tasks, pay periods to approve, recurring bills to review, step timers); rework and quality; preventive maintenance; approvals; compliance; and messages and everything else. Each choice saves as it is made, and a kind turned off both ways says that you will not be told about it at all. Nothing changes until someone chooses: notifications show in the app and are not emailed. A person with no email address on their login keeps getting them in the app whatever they choose. Administrators and managers set the time the daily summary goes out (7:00 unless changed), and Send me a test email checks that mail reaches you. Email needs the server's outgoing mail set up; the page says when it is not.

Defaults by role

Administrators see a Defaults by role grid on the same page: a row for each kind of notification and a column for each role, including the shop's own roles. Each cell sets what people in that role get until they choose for themselves: in the app, in the app and by email, in the app and in the daily summary, by email only, in the daily summary only, or not told at all. Set QC's tests due and overdue to App and email, and a QC lead who joins later gets out-of-spec emails without touching the settings. A custom role follows the level it is built on until you set it, and every change is in the audit log. A person's own choice always wins: a kind they have not chosen says it is set by the default for their role, and Use the default drops a choice they made so they follow the role again.

Emailing a document

Email on a quote, a certificate of compliance, an invoice, a purchase order or a customer's statement (Email statement) opens one dialog: To and Cc, filled in from the customer's or vendor's contacts, a subject and a message you can change, Attach the PDF with a See it preview, and for a customer who uses the portal a link to the document there. Each document keeps an Emails sent list: when, to whom, by whom and what was sent, and every send is in the audit log. Quotes, invoices, statements and POs are emailed by the roles that see prices, certs by QC too. The automatic emails (invoices as they are raised, shipment notices, monthly statements and reminders) go on as before (see Customer portal).

Messages

Messages is built-in messaging between the staff of one shop. A direct conversation is the one thread between two people, reused each time either writes to the other; a group has a title and any number of members. The sidebar shows the unread count. A message can link a record so "look at this" lands on the right page: a job, tank, customer, part, quote, NCR, CAPA, work order, piece of equipment, shipment, invoice or PO. You get one notification per conversation until you open it. Customer-portal users do not take part. The unread count and the conversation list follow new messages as they arrive, and an open conversation shows a new message at once.

Your account and its security

Settings > Account changes your name and password and shows if your email is confirmed. Settings > Security has four cards.

Two-factor authentication
Set up scans a QR code into any authenticator app and confirms with a six-digit code. Ten recovery codes are shown once, with copy and print. New recovery codes replaces the set. Turning it off takes your password and a current code, and signs out your other devices.
Shop policy
An administrator can require two-factor authentication for the roles the shop picks, built-in or custom; the rule covers administrators and managers unless it is changed. Until an affected person sets it up, they can reach only their account and security settings.
Signed-in devices
Every open session with browser, address, sign-in time and last activity. Sign out any one of them or everywhere else.
Security activity
Your sign-ins, failures and lockouts, password and two-factor changes, devices signed out, exports and invitations. Administrators and managers also see the shop's activity: sign-ins by members, team changes, exports, backup downloads, data clears and every time Amp-Hour support entered the shop.

Floor terminal PINs

A tablet shared by a line can be set as a floor terminal (see Scheduling and the shop floor): each person signs in on it with their badge and a PIN, and the work is recorded under their name. Each person sets their own PIN of 4 to 8 digits on the Time clock page; a PIN that is all one digit or a straight run is refused, and it is stored with scrypt like a password. Five wrong PINs in a row lock the badge for 15 minutes. On the same page an administrator sets how many idle minutes sign the person out of a terminal (2 by default), sees who has a badge and a PIN and whether it is locked, resets a PIN, and gives a starting PIN to someone without a login of their own, who chooses their own PIN at their first badge sign-in. A supervisor's badge and PIN also approve a start the shop's training or calibration check blocks, logged under the supervisor's name: an instrument that is not calibrated needs an administrator, a manager or QC, and missing training also takes a trainer on that course. Each approval answers one blocked start for one operator, and a starting PIN is replaced with the person's own before it approves anything. PINs are not part of an import from another system: after the employees are imported with their badge numbers, each person sets a PIN on the Time clock page.

Who reads the audit trail

Setup > Audit trail is open to administrators, managers, the office and QC, and to custom roles on those levels that have Quality or Shop setup. It pages through every change with its total, filters by record, person, kind of change, words and dates in the shop's time zone, and downloads the filtered rows as CSV; each download goes in the trail too. Saves of Settings, of appearance, fields and terms, and of a process's routing keep the values before and after. Roles that do not see prices and costs see no money values in it and none of the books' rows.

What the server does on its own

Passwords are at least 12 characters, checked against common passwords and your own name and email, and stored with scrypt. A session ends after 7 days idle and 14 days in any case. Ten failed sign-ins lock the login for 15 minutes, and a sign-in from a new browser and address sends you an email. Changes to records go in the shop's audit log, Setup > Audit trail: who, which record, the kind of change and when, with the values before and after for edits and deletes made in the record forms (customers, parts, vendors, tanks, accounts and the other Shop setup lists) and for finance records; a person's pay, email and badge number and passwords are never copied into it. Finance changes are also listed under General ledger > Changes. Once a day the server snapshots every shop database and its files, keeps 30 days and copies them off-site; an administrator can download the shop's whole database, a JSON export of the main tables, every file on a record as a ZIP, the main tables as CSV or the books for a date range as a ZIP of CSVs from Settings > Data at any time, and each download is written to the security log. Settings > Shop > Automatic tasks lists what the server runs for the shop on its own (payment reminders and statements, the lab's overdue checks, chrome reminders, file housekeeping, recurring bills, PMs coming due, QA test plans and inspections, spec revisions taking effect, customer deviations expiring, training and calibration reminders, receiving notices, wastewater, sales tax and pay period reminders, the month-end reminder and the daily notification summary), on a schedule in the shop's time zone, with when each last ran, what it did and when it runs next. Each runs once each time it is due, and after the server was down it catches up once rather than repeating every missed run. The Security page covers the rest.

Team security, backups and deleting the shop

Who uses two-factor authentication. Settings > Team shows each member's two-factor state: On, Off, or Required when the shop's rule covers their role and they have not set it up yet. Under it is how many devices the person is signed in on now. An administrator can sign a member out everywhere, for a lost phone or a shared computer left signed in; they sign in again with their password. The shop's rule under Settings > Security can cover any role, built-in or custom, and covers administrators and managers until it is changed. A custom role is covered whenever its level is ticked.

Invitations that were lost or ran out. Each pending invitation has Copy link and Resend. Resend emails the invitation again and gives the link 7 more days, so an expired invitation comes back without being cancelled and sent again; expired ones stay on the list, marked. An invited customer's email names the customer account the portal is for and lists what they can do there, leaving out any part of the portal the shop has switched off. The device that accepts an invitation counts as the person's own, so their first sign-in sends no New sign-in alert.

Backups the owner can restore. Settings > Data has Download full backup: the shop's database and every file in it as one ZIP. Restore points lists the nightly backups of the shop and the copies taken before earlier restores, and each downloads as the same ZIP. The owner can restore the shop from a restore point or from an uploaded backup of this shop; a backup of another shop is refused, because every shop's database carries its own shop ID. Restoring asks for the owner's password, the shop ID typed out and, when it is on, a two-factor code. A copy of the shop as it is then is taken first and listed under Restore points, so a restore can be undone. Every member keeps their login and role, a portal login for a customer the backup does not have is switched off, and everyone in the shop is signed out. The restore is written to the security log and to the restored shop's audit trail.

The Operator's menu. Someone in the built-in Operator role opens the menu on the work at the tank: Dashboard, Shop floor, Time clock, Loads, Racks, Map and Messages, as far as the shop's modules allow. Every other page the role may open is under More, which starts closed and stays the way the person leaves it. Other roles, and custom roles built on the Operator level, keep the full sidebar.

What a customer sees. A portal login sees the shop's own logo, colour and date format, and never its subscription, trial or shop ID: the Account page names only the shop, the shop chooser leaves out each shop's status, and Delete account talks about the portal sign-in alone. Shop-wide notices for the staff are not shown to customers, and the bell has no link to the staff's notification pages.

Deleting the shop. Delete shop under Settings > Shop schedules the deletion 7 days ahead, with Download backup inside the dialog. Until the date the shop is read-only for everyone, the owner is emailed a link that keeps the shop in one click, and the owner can cancel under Settings > Shop. The server deletes the shop on the date.

Reporting a problem

Report a problem, at the bottom of the sidebar, in the name menu at the top right and under Settings > Account, opens a short form: what happened and what you expected. The report goes to us by email with the page you were on, your shop and role, your browser and the last few errors the page recorded, so you do not have to describe them; we answer to the address on your account. A page that fails to load offers the same link. Reports are kept in our console until they are closed.

Integrations: API keys and webhooks

Settings > Integrations, for administrators, connects the shop to other systems on the shop's terms: an ERP, a customer's supplier portal, a spreadsheet that refreshes itself, or a chat channel that hears about every shipment.

API keys. Make a key for each system, with a name, an access level and a choice about prices. A read-only key reads; a read and write key can also receive jobs and make records, at office level. A key without prices reads at QC level: prices, costs and amounts come back empty and invoices are not available to it. The key is shown once, when it is made, and Amp-Hour keeps only a fingerprint of it, so a lost key is revoked and replaced. The list shows each key's first characters, who made it, and when and from which address it was last used. Revoking stops a key at once. Making and revoking keys goes in the audit trail, and every change a key makes is recorded under the administrator who made it, marked with the key's name. A key never opens the customer portal, the account and platform pages or the platform console. It is not a person, so it cannot punch the time clock, set a terminal PIN or read anyone's notifications or messages. A key stops working when the administrator who made it leaves the shop or is no longer an administrator, and the list says so. Wrong keys are limited like failed sign-ins from the address that sent them, counted apart, so people signing in from that address are not locked out.

The read API. Jobs, customers, parts, quotes with their lines, invoices with their lines, shipments with their lines and certificates of compliance are read at /api/v1, 100 to a page (up to 500) in the order they were made. Each record says when it last changed, and updated_since returns only the records changed since a time, so another system can stay in step by reading what changed since its last pass. Every field of every record, and the body of every webhook, is listed in the API reference that comes with the software (docs/api.md).

Webhooks. Add the address of the receiving system and tick the events: a job received, a job shipped (one event for each job on the shipment, with the carrier and tracking number) and an invoice made, whether by a person, by a shipment or by a scheduled run. Each event carries the record as it was right after the change, and is sent whether anyone has the app open or not, usually within a minute. Each post is signed with HMAC-SHA256 using the webhook's signing secret, which is shown once and can be replaced. Send test posts a test event at once. The delivery log shows every post with the answer it got; View shows the body that was sent, and Send again posts it once more.

When the receiver is down. A failed post is tried again after 1, 5, 15, 60, 180, 360 and 720 minutes, eight attempts over about a day. When every attempt to an address has failed for that long, the webhook is switched off and every administrator is notified; switching it back on sends the events that were waiting. A hosted shop posts only to public https addresses.